斯里兰卡阿塔纳水厂
Gampaha,Attanagalla&Minuwangoda
Integrated Water Supply Scheme
雨季施工专项施工方案
Method Statement in Rainy Season
编制:
Prepared By:
审核:
Reviewed By:
批准:
Approved By:
CMEC 公司斯里兰卡阿塔纳水厂项目部
Gampaha,Attanagalla & Minuwangoda Integrated Water Supply Scheme
编制时间:2017 年 09 月 01 日
Preparation Date:1st September , 2017
目 录
Contents
第一节、编制依据 ................................................ 01
Chapter I Preparation Basis
第二节、工程概况 ................................................ 01
Chapter II Project Overview
第三节、 雨季施工原则 ........................................... 04
Chapter III Construction Principles in Rainy Season
第四节、施工步骤 ................................................ 05
如有你有帮助,请购买下载,谢谢!
Chapter IV Construction Procedures
第五节、雨季施工管理目标 ........................................ 10
Chapter V Construction Management Targets in Rainy Season
第六节、 雨季施工的主要部位 ..................................... 11
Chapter VI Major Areas for Construction in Rainy Season
第七节、雨季施工主要技术管理措施 ................................. 11
Chapter VII Main Technical Measures
雨季施工管理 ............................................... 11
Construction Management in Rainy Season
地 基 与 基 础 工 程 ........................................... 13
Foundation and Base Works
地下防 水 工 程 .............................................. 16
Underground Waterproof Engineering
钢 筋 工 程 ................................................... 17
Reinforcement Works
模 板 工 程 ................................................... 18
Formwork
混凝土工程 ................................................. 19
Concrete Works
机电安装工程 ............................................... 22
如有你有帮助,请购买下载,谢谢!
Mechanical and Electrical Installation Works
砌筑工程 ................................................... 30
Masonry Works
装 饰 装 修 工 程 .............................................. 31
Decoration Engineering
脚手架工程 .................................................. 33
Scaffolding Works
物资及设备的堆放 ............................................ 35
Storage for Materials and Equipment
现场临电工程 ................................................ 38
Site Temporary Power Work
现场排水 .................................................... 39
Site Drainage Works
第八节、雨季安全技术措施 ........................................ 43
Chapter VIII Safety Measures for Construction in Rainy Season
机械安全技术措施 ............................................ 43
Safety Measures for Equipment Operations
施 工 安 全 技 术 措 施 .......................................... 44
Construction Technical Safety Measures
消 防 管 理 措 施 .............................................. 48
Fire Fighting Controlling Measures
环境保护措施 ................................................ 48
Environmental Protection Measures
人员安全技术保障 ........................................... 49
Technical and Safety Guarantee for Construction Personnel
雨季卫生防疫安全隐患及预防措施 .............................. 50
Disease Prevention Measures and Health Protection
雨季安全施工工作检查 ........................................ 52
Safety Construction Supervising and Inspection
第九节、 附件 ............................................... 53