收藏 分销(赏)

5W-报告模版.xls

上传人:天**** 文档编号:2667754 上传时间:2024-06-04 格式:XLS 页数:10 大小:69KB 下载积分:8 金币
下载 相关 举报
5W-报告模版.xls_第1页
第1页 / 共10页
5W-报告模版.xls_第2页
第2页 / 共10页


点击查看更多>>
资源描述
Root Cause Analysis:In the first Why write down the Most Probable Cause from the front.(use additional sheets if more than one probable cause)Why?Why?Why?Why?Why?Root Cause:Proposed Solution:Brainstorm possible solutions.Select the most efficient,effective solution.Trial Run:Confirmation trial to test proposed solution:Date:Sequence#s Team Members Supporting Problem OwnerDate:Name:Area:Signature:*Intermediate Action Plans(not containment)WhoDue DateBreak PointStatus Verification&Resolution Questions:1-Identified2-ImplementedTo follow up the next 3 successive shipment.N4-Closed3-FeedbackHas the job instruction,SOS/JES been updated?Y N N/AY.Has the Product Quality Standard been updated?Y N N/AY.Countermeasure Tracking(Days with/without repeat)Has the Job Instruction Training been updated?Y N N/AY12345678910Have the Preventative Maintenance/Process Control Plans been updated?Y N N/AN/A11121314151617181920Have Prints,Check Sheets or other forms been updated?Y N N/AN/APrepared By:Date:1;Approved By:Date:No,assigned toPRTS+#Lessons Learned:Send Copy of Problem Solving Form toRegionalCould the communication of this problem and its fixes possiblyprevent other departments from incurring the same problem?Press/StampingBodyPaintG.A.PowertrainSupplierOtherGlobalYesYESNoDate/Signature:Author(required for closure)Group Leader/Shift Leader(info only)Area Manager(info only)Shift:2011-5-27/Rongliang LianShift:2011-5-27 Youquan Huang Shift:2011-5-27 Ivan Jiang Shift:Root Cause Analysis:In the first Why write down the Most Probable Cause from the front.(use additional sheets if more than one probable cause)Why?Why?Why?Why?Why?Root Cause:Proposed Solution:Brainstorm possible solutions.Select the most efficient,effective solution.Trial Run:Confirmation trial to test proposed solution:Date:Sequence#s Team Members Supporting Problem OwnerDate:Name:Area:Signature:Intermediate Action Plans(not containment)WhoDue DateBreak PointStatus Verification&Resolution Questions:1-Identified2-ImplementedTo follow up the next 3 successive shipment.N4-Closed3-FeedbackHas the job instruction,SOS/JES been updated?Y N N/AY.Has the Product Quality Standard been updated?Y N N/AY.Countermeasure Tracking(Days with/without repeat)Has the Job Instruction Training been updated?Y N N/AY12345678910Have the Preventative Maintenance/Process Control Plans been updated?Y N N/AN/A11121314151617181920Have Prints,Check Sheets or other forms been updated?Y N N/AN/APrepared By:Approved By:No,assigned toPRTS+#Lessons Learned:Send Copy of Problem Solving Form toRegionalCould the communication of this problem and its fixes possiblyprevent other departments from incurring the same problem?Press/StampingBodyPaintG.A.PowertrainSupplierOtherGlobalYesYESNoDate/Signature:Author(required for closure)Group Leader/Shift Leader(info only)Area Manager(info only)Shift:Shift:Shift:Shift:
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 包罗万象 > 大杂烩

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2025 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服