资源描述
单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,*,【,例,】,某建筑场地方格网、地面标高如图,格边长,a,=20m,。,泄水坡度,i,x,=2,,,i,y,=3,,,不考虑土的可松性的影响,确定方格各角点的设计标高。,解:,(,1,)初步设计标高,(场地平均标高),H,0,=,(,h,1,+2,h,2,+3,h,3,+4,h,4,),/4n,=70.09+71.43+69.10+70.70+2,(,70.40+70.95+69.71+,),+4,(,70.17+70.70+69.81+70.38,),/,(,49,),=70.29,(,m,),70.09,70.09,(,2,)按泄水坡度调整设计标高:,H,n,=,H,0,L,x,i,x,L,y,i,y,;,H,1,=70.2930,2,+30,3,=70.32,70.32,70.36,70.40,70.44,70.26,70.30,70.34,70.38,70.20,70.24,70.28,70.32,70.14,70.18,70.22,70.26,H,0,70.29,H,2,=70.29102+303=70.36,H,3,=70.29+102+303=70.40,其它见图,70.32,70.36,70.40,70.44,70.26,70.30,70.34,70.38,70.20,70.24,70.28,70.32,70.14,70.18,70.22,70.26,70.09,(,3,)计算各方格角点的施工高度,h,n,:,h,n,=,H,n,H,n,即:,h,n,=,该角点的设计标高,自然地面标高(,m,),+0.23,-0.04,-0.55,-0.99,+0.55,+0.13,-0.36,-0.84,+0.83,+0.43,-0.10,-0.63,+1.04,+0.56,+0.02,-0.44,h,2,=70.36,70.40=,0.04,(,m,);,负值为挖方高度,h,1,=70.32,70.09=,0.23,(,m,),正值为填方高度。,70.32,70.36,70.40,70.44,70.26,70.30,70.34,70.38,70.20,70.24,70.28,70.32,70.14,70.18,70.22,70.26,+0.23,-0.04,-0.55,-0.99,+0.55,+0.13,-0.36,-0.84,+0.83,+0.43,-0.10,-0.63,+1.04,+0.56,+0.02,-0.44,70.09,(,4,)确定零线(挖填分界线),插入法、比例法找零点,零点连线,h,1,0,0,(,5,)场地土方量的计算:,分别按方格求出挖、填方量,再求整个场地总挖方量、总填方量。,1,)全挖、全填格:,V,挖(填),=a,2,(h,1,+h,2,+h,3,+h,4,)/4,h,1,h,4,方格角点施工高度绝对值,V,挖(填),挖方或填方的体积,2,)部分挖、部分填格:,V,挖(填),=a,2,h,挖(填),2,/4,h,h,挖(填),方格角点挖或填施工高度绝对值之和;,h,方格四个角点施工高度绝对值总和。,
展开阅读全文