收藏 分销(赏)

embitter使痛苦(embitter痛苦的).doc

上传人:仙人****88 文档编号:9281216 上传时间:2025-03-19 格式:DOC 页数:4 大小:41KB
下载 相关 举报
embitter使痛苦(embitter痛苦的).doc_第1页
第1页 / 共4页
embitter使痛苦(embitter痛苦的).doc_第2页
第2页 / 共4页
点击查看更多>>
资源描述
Order and quality standard. Four, the main construction machine need a dosage plan This engineering is under construction, we will with exaltation mechanization level for principle, enter a field in time with the work project Various machine tool to ensure that the engineering mainly enters a construction machine smoothly progress.(see table 4-1) Table 4-1 main construction machines plan The ordinal number machine tool name set number model number enters a field for time 1 anti- spade excavation machine 1160 open man-hour 2 from unload a car 8 to open man-hour 3 beat a popular machine 4 HWs-16s to open man-hour 4 theodolites 1 JS2s start work ex- 5 level instrument 2 DZS2s start work ex- 6 laser vertical instrument 1 opening front 7 concrete mixers 4 JZC400ses open man-hour 8 concrete agitations stand one to open man-hour 9 flat panels flap the Dao machine 4 ZX75s to open man-hour 10 inserts type flap a Dao machine 20 sets of ZX75s to open man-hour 11 concretes transport an equipments 2 sets of open man-hour 12 electric welding machine 4 BISs-330ses open man-hour 13 electricity residue pressure Han machine 2 LZF32ses open man-hour 14 flashlights to Han machine 2 open man-hour 15 electricities saw 2 open man-hour 16 electricities plane 2 open man-hour 17 finish from the rise type elevator in the door 2 foundation constructions 18 towers mourn a 80 Ts-M to open man-hour 19 people goods two use elevator 16 F the corpus is over Five, the main item engineering start construction method (A)Foundation 1.soil square engineering and protection measure (1)According to this engineering circumstance, the radicle pit opens to dig to adopt a machine to open to dig to assist for lord, artificial fixing a side ascent for, Because the place is narrow, open to dig to put performance's least of ascent coefficient to stipulate one ∶ 0.5, adopt a set excavation machine to dig soil, 8 from Unload car match luck soil.Remaining soil carries into construction unit appointed the location Be piled. In addition to stake radicle, this engineering foundation pattern has the reinforced concrete independent foundation in pillar, independent foundation base elevation -2.2 ms.As well adopt a machine to open to dig, the artificial fixs a side, in the process of opening to dig in work well an elevation diagraph work in time, and Beat a small wodden post control scaleboard elevation, the soil that digs is square, carry to construction unit appointed the location Be piled, for prevent°froming ground The form water current goes into radicle pit and establishes to block water set on all sides in the radicle pit.Ask technical personnel to hand over bottom in detail while starting construction.Organize Lead a hard class of set, promise the personnel is normal construction, work hard for to complete a foundation construction soon.The radicle pit opens to dig to complete, in time Carry on a spade to explore, each pillar pit 5 explores a point, the bore deep 1.5~2.0 ms requests to carry on and explore the mire of to press successively fluently The preface arranges and strictly forbid before checking slot sabotage soil kind.Be explored qualified rear to continue to start construction by spade, and carry out in time Is various concealed check a procedure, if the spade explores have something to do with designing being wrong, shoulding notify design in time and personnel's processing, go to match to want Beg for quasi-.Experience slot is qualified behind just like often circumstance, the square can continue to start construction. (2)The radicle pit defends to drain measure on all sides Radicle pit reports according to the geology after digging into an elevation, the underground water table covers up a deep 10 m or so, stabilize water level to cover up deeply For the 7.2 ms, but place memory at upper level Zhi water, the water level covers up deeply etc. not, in the 1.4~2 ms, and in bar of rain expects rain Water soaks radicle pit, the building radicle pit around does to be suffused with water ascent and works well a drain on the side ascent and digs to drain ditch on all sides, with Then expel to accumulate water and rain water in time, in bar of earth's surface water gets into radicle pit and establishes brick to carve to drain ditch in the radicle pit bottom, four capes Dig to gather water well, adopt a submersible pump to pump water, since water. (Two)The ground floor starts construction 1.ground floor construction in proper order Clean up soil square to design an elevation →mat layer construction →cement sand the syrup seek an even layer →brush a grass-roots processing →watertightness Layer →40 →the colligation raft plank reinforcing bar →raft plank concrete →wall, pillar, reinforcing bar and mold Plank, concrete →crest plank reinforcing bar, template and concrete →side wall waterproof layer →carve to protect a wall →return to fill. 2.reinforcing bar engineering (1)Foundation mat layer construction completion after attaining certain strength, above it lineation, pays a mold and spreads to put a reinforcing bar net Slice, top and bottom layer the reinforcing bar colligation is firm, curved hook with an upward exposure, the post puts Jin bottom to carry to bend 90 ° to bend hook and foundation reinforcing bar to bind Being firm is firm, the top end is propped up a steel pipe scaffold to fix with the template firm, eradicate completely a reinforcing bar to move, top and bottom of the layer reinforcing bar Use φ 16@500 Ma Deng Jin establish and ensure that the reinforcing bar is apart from exactitude;The bottom reinforcing bar net slice is used the cement sand syrup mat piece The mat fills and promise a reinforcing bar protection layer thickness. (2)The reinforcing bar net of the wall colligation the curved hook of reinforcing bar should toward concrete inside, should establish in the 2 F reinforcing bar Support Jin to is apart from by fixing a reinforcing bar and shunt alignment mutually.Ground floor wall crest reinforcing bar adoption double the row steel pipe lend support to reinforcing bar Of colligation. (3)The scaleboard top and bottom lines up reinforcing bar to all adopt Ma Deng Jin establish@500 pair to. (4)The scaleboard sprinkles to take place to increase to establish φ 10@ behind 150, L=1400(top and bottom each put) strengthen Jin(take drawing as Is quasi-), sprinkle to take an adoption φ 12 reinforcing bar frameworks to add steel wire net insulation behind. 3.template engineering (1)The wall body template adopts big template.It is 500 rightnesses of the wall body cross section sizes that pull stud bolt assurance to use φ 12@.Count Measuring is 8|m 2, use φ 48 fixed template positions.To pull stud bolt to add a 2 mm thick the slice drilling a hole iron make Water wreath.Water wreath have to full Han.Water take adoption-4 mm steel plate, L=400, in order to promise to prop up a stability, steel The tube wants to take to establish to be firm, and establish necessary scissors to support.Should hard check the wall body stalk line while starting construction position, cut a noodles Chinese foot Inch, neat template and perpendicular etc..
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传
相似文档                                   自信AI助手自信AI助手

当前位置:首页 > 教育专区 > 小学其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2025 宁波自信网络信息技术有限公司  版权所有

客服电话:4009-655-100  投诉/维权电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服