资源描述
Master Planning Questionnaire
综合计划调查表
Prepared for
准备
[Customer Name]
[客户名字]
Project
计画
[Project Name]
[计画名字]
Prepared by
准备被
Name
名字
Contributors
贡献者
[Document contributors]
[文件贡献者]
A.
一。
Master Planning
综合计划
What type of manufacturing environment does the organization operate in?
组织操作哪一类的制造业的环境进入?
As an example, Make to Order, Make to Stock, Engineer to Order, etc.
为例,制造命令,制造进货,对次序,等等设计
Does your organization currently maintain a Sales Forecast
你的组织现在维持一个售卖预测吗
If question number 2 is answered with a “Yes”, what forecasting techniques are currently being utilized
如果 2 号疑问一起回答一 " 是的 ", 什么预测技术现在被利用
If Forecasting is being utilized, does the organization allow the forecast to be consumed by actual orders?
如果预测被利用,组织允许预测被实际的次序消耗吗?
If so, what technique is being utilized
如果如此,什么技术被利用
How are items currently being planned today:
项目好吗现在今天被计画:
Min/Max
最小/最大
Manually
用手
Material Requirements Planning (MRP)
物质的需求计划(MRP)
Are lead times currently being maintained for the following items:
领引现在是时代为下列的项目被维护:
Purchased Items
购买了项目
Outsourcing Items
支援外包的项目
Does your organization currently operate in a Master Production Schedule (MPS), and Material Requirements Planning (MRP) environment
你的组织现在在一种生产时间表大师 (MPS)、和物质的需求操作计划 (MRP)环境吗
Does your organization have unique planning requirements for individual items
你的组织有独特的计划个体所需吗项目
Is the “Available to Promise” procedure currently being practiced
" 可得的答应 " 程序现在被练习
Does your organization currently maintain a Planning Time Fence?
你的组织现在维持计划时间围墙吗?
If so, how many days in the future are being maintained
如果如此,多少天未来被维护
Does your organization currently maintain an Accumulative Time Fence?
你的组织现在维持积聚的时间围墙吗?
If so, how many days in the future are being maintained
如果如此,多少天未来被维护
Does your organization practice “Frozen Time Fence” techniques?
你的组织练习 " 冷冻时间围墙 " 技术吗?
If so, how many days within the “Planning Time Fence” are allocated.
如果如此,多少天在这 " 计划时间围墙 " 里面被分派。
Does your organization maintain multiple planning methods?
你的组织维持多样的计划方法吗?
As an example, simulation and production.
当做例子、模拟和生产。
How accurate are the Bills of Material
材料的比尔多正确
How many levels does the organization maintains in their bills of material
多少水平做组织在他们的材料的帐单中维持
Are “Phantom” items being utilized
" 幻影 " 项目被利用
How accurate are the lead times for a purchased item
为一个被购买的项目乘的领引多正确
How accurate are the routings, and is run time, and setup time part of the lead time calculation
工作路线排定多正确,而且是被跑的时间、和装备时间领引时间计算的一部份
How often are planned production and purchase orders maintained and released
计划了的生产是多久和被维护而且释放的采购单
How many planning calendars does the organization currently maintains
多少计划日历现在做组织维持
How many shifts are currently in operation
多少变化现在在运转
What is the current capacity and efficiency ratio
什么是现在的能力和效率比
Are Standard Order Quantities currently being used
标准的次序量现在被用
Are the people assigned to maintain and operate formal planning systems APICS certified or APICS literate
是分配维持而且操作被检定的正式的计划系统 APICS 的人们或 APICS 学者
End of Questionnaire
调查表的结束
展开阅读全文