1、POLICY & PROCEDURE政策与程序Subject 主题:Fire Protection Preventive Maintenance消防设备维修保养No.: ICCQ/ENG/0000 Prepared By政策制定人Hotel general manager for approval酒店总经理批准Effective Date执行日期LewisLiu刘平On 28 July 20112011年7月28日n Purpose / 目的The Director of Engineering is to develop and maintain the Fire Protection Pr

2、eventive Maintenance Program as InterContinental Fire Safety and all applicable local codes.工程总监应遵照洲际酒店的消防守则,结合当地的消防法规,在酒店内制定并实施防火程序。1. The program will be implemented as per the Fire Protection Maintenance schedule.根据防火保护计划执行防火程序。2. The completed Fire Protection Preventive Maintenance Schedules are

3、 to be filed in a date binder for one year in the Director of Engineerings office for future reference. 在工程总监办公室内应保存有一年的防火保护计划以供参考。n Policy / 制度The Director of Engineering is to develop and maintain the Fire Protection Preventive Maintenance Program as InterContinental Fire Safety and all applicable

4、 local codes.工程总监应遵照洲际酒店的消防守则,结合当地的消防法规,在酒店内制定并实施防火程序。1. The program will be implemented as per the Fire Protection Maintenance schedule.根据防火保护计划执行防火程序。2. The completed Fire Protection Preventive Maintenance Schedules are to be filed in a date binder for one year in the Director of Engineerings offi

5、ce for future reference. 在工程总监办公室内应保存有一年的防火保护计划以供参考。n Procedure / 程序1. An accurate list of all fire protection devices& equipment, including well-defined locations, is to be compiled. 掌握一份店内所有消防措施、器材览表,包括设置的具体位置。2. All applicable equipment and maintenance schedules, as in Figure 1, are to be incorpo

6、rated and followed.制定消防措施、器材维修计划,如表1。3. The list of General Tasks, as in Figure 2, is to be incorporated into the Fire Protection Preventive Maintenance Program. 配合消防预防维修程序,制定总体任务表,如表2。4. The list is to be used to complete the Spread Sheet, as explained in the Preventive Maintenance.如在预防性维修程序上所提到,此将

7、作完明细将作为完成数据表的依据。5. The Spread Sheet is to be completed so that the work load is spread equally over 52-week period.任务扩展表的内容将工作量按一年52个星期平均分配。6. When the Spread Sheet is completed, the Weekly Schedule Sheets are to be completed. Each device requiring Preventive maintenance on week one is taken from th

8、e Spread Sheet and entered on a Weekly Schedule Sheet. Device name, location and specific maintenance functions to be performed are entered. Weeks two through fifty-two are completed the same way. Multiple weekly schedule sheets may be necessary. 按任务扩展表的内容制定周工作计划表。从任务扩展表中找出在本周内要进行维修的设备。编入周工作计划,包括设备器

9、材的名称、位置和特殊要求。下一周的计划表的制定程序不变。It recommended that the completed Weekly schedule Sheets be inserted into clear plastic sheet protectors and the entire program stored in a three ring binder. These sheets are the Master sheets.建议将已完成的周计划表装入透明塑料文件套中保存,归入3孔文件夹中。全套计划表将作为维修总控制单。7. Each week the corresponding

10、 annual numerical Weekly Schedule Master Sheet is photocopied. This copy is referred to as the Sub Master. The name of the associate who is responsible for completing the work is to be entered into the Sub Master. Multiple copies of Sub Master may be required, depending on the number of persons assi

11、gned to complete the work. 每星期都要将一年内每一周时期的维修控制表作复印件。将此复印件作为主控表的补充表,将进行施工的员工的姓名填写在此表上。根据施工人数来决定此补充表应被复印的数量。8. As each piece of equipment and/or general task is completed, the associate enters his/her initials and the date of completion on the Sub-Master. The completed Sub-master Weekly Schedule Sheet

12、 is returned to the Director of Engineering. 任务完成后,施工人员将自己姓名的大写字母及日期填写在补充表上。每周将已完成的补充表呈交、工程总监。9. The Director of Engineering is to review each Sub-master Sheet returned to ensure that the Preventive maintenance has been completed.工程总监需仔细审阅收到的表格以确保一切预防性维修工作的正确实施。10. The Sub-masters are to be filed in

13、 a dated binder for one year in the Director of Engineerings office. 此补充表格应在工程总监办公室存档保留至少一年时间。Figure 1. Fire Protection Maintenance Schedule / 表1消防保护维修计划Equipment(设备) Schedule(计划)Emergency Generator -Test Weekly(minimum 30 minutes run time)应急发电机 - 每周测试一次(测试运行30秒) Test automatic transfer switches by

14、simulated power failure annually 每年进行一次断电演习,以测试其自动切换性能。Full load test annually.每年进行一次满载运行测试。Electric Fire Pump - Test monthly消防泵 每月一次 Conduct flow test annually每年进行一次流量运行测试Fire Standpipe System - Visually inspect sealed valves monthly应急消防管道系统 每月检查一次阀门的紧箍度(用眼观看)Visually inspect locked valves and valv

15、es with tamper switches monthly每月检查一次已闭好的阀门和有调剂开关的阀门(用眼观看)Visually inspect post indicator valves monthly每月检查一次阀门指示器(用眼观看)Test post indicator valves annually每年要对指示阀进行一次测试Perform standard maintenance 每年要对所有的阀门进行一次维护保养。Fire Hydrant - Visually inspected monthly .Perform maintenance procedure every 6 mon

16、ths消防栓 每月检查一次(用眼观看),每6个月进行一次维修保养。Open and close annually每年打开关闭一次。Fire Department Connections -Visually inspect pump test Header monthly.市政联接口 每月对管道进行一次监测Fire Hoses/nozzles -Visually inspect monthly Re-rack annually消防水龙带/喷嘴 每月用眼睛检查一次,每年整理一次Fire Sprinkler System - Test water flow alarm devices every 3

17、 months by opening main drain.消防喷淋系统 每3个月通过打开总放水开关检查流量报警装置Flow test main drain(s) (blow down) every month.每个月用水流测试总放水装置Visually inspect sprinkler heads every 3 months.每3个月检查一次喷淋头(用眼观看)Visually inspect sprinkler piping (readily accessible) and hangers for corrosion and damage every 3 months.每3个月用眼睛检查

18、一次喷淋管和管架以及时发现有腐蚀和损坏之处Test antifreeze specific gravity (if applicable)如有可能,检测防冻剂比重Verify calibration of pressure gauges every 5 years.每5年校对一次压力表的刻度Fire Sprinkler System - Visually inspect water level monthly消防喷淋系统 每月检查一次水的高度Gravity tanks, visually inspect condition of tank every 2 years. 每2年检查一次重力水箱的

19、状态是否良好 Test tank level indicator every 6 months. 每6个月检测一次水箱的指示标Fire Sprinkler System - Inspect water level and pressure monthly.消防喷淋系统 每月检查水的高度和水压Pressure Tanks - Visually inspect condition of tank every 2 years压力水箱 每2年检查一次水箱的状态是否良好(用眼睛观看)Test high and low air pressure switches every 2 years每2年检查一次高

20、低气压开关Dry/ Preaction / Deluge systems - Test annually干式喷淋系统 每年测试一次 Test deluge detection device every 6 months 每六个月检查一次溢流指示装置Inspect air and water pressure weekly每周检查一次气压和水压In cold weather, inspect heating mechanism (if applicable) daily在寒冷的天气里,如有可能要对供暖系统进行检查Inspect priming water supply every 3 month

21、s每3个月对主供水系统进行一次检查Flow test low point drains (blow down) annually每年运用流量法检测低区排水Trip-test dry pipe test dry pipe valves annually每年测试一次触发干式阀Full flow trip test dry pipe valves every 3 years.每3年测试一次全出水触发干式阀Fire Alarm Detection System - Verify proper zone annunciation, ensure each zone can be reset and th

22、e消防报警系统 entire system is free of all trouble conditions every month 确保报警可覆盖的正确区域。确保在每个区域内都可以将报警复位。每月对系统进行一次检查以保证系统无故障。- Verify the proper operation of all LEDs and lamps every month 每月都要对 LED和照明进行检查以确保运行正常。Test pre-alarm voice/tone devices every 6 months每6个月对预报警的音质和音调进行检测。Test general alarm voice/to

23、ne devices every 6 months (operate as during full property evacuation)每6个月对报警的音质和音调进行检测。(在进行疏散演习时)Test battery back-up annually (operate entire voice/tone system for 3 minutes on standby emergency power)每年对后备电池进行检测(使用应急电源使警铃系统运行3分钟)- 1/12 of the total devices are to be tested monthly so all devices

24、are tested annually as follows:每个月要对酒店所有报警设备的1/12做测试,在一年内全部测试完毕。 Pull stations tested by pulling handle 通过扳动扳手来测试Pull station。 Single station smoke detectors tested by operating test button or magnet (or test set) System connected smoke detectors tested in place by smoke or other manufacturer accept

25、able aerosol通过启动按钮或电磁钮来测试烟感 Single station,以火焰散发的烟雾或其它厂家认可的烟雾物质来对与烟感相连系统进行测试。 Heat detectors tested by heat source equipment使用一热源对热感探头进行测试。Water flow switch tested by operating inspector test valves 通过操作阀门对流量开关进行测试。Tamper switches tested by turning valve 1/4 turn通过开启阀门1/4来测试调节开关。- Fire fighters tele

26、phones tested by communicating through the system 由通讯服务部对报警电话进行测试。Fire Extinguishes -Inventory taken and visual inspection monthly (sign and date each extinguisher tag)灭火器 每月进行盘点和检查(在每个灭火器上签字并注明日期)。Professional serviced annually or more frequently if required by code.按当地法规的要求每年至少进行消防演习。Complete disc

27、harge and Hydro-static tested every 2 years or more frequently.每2年进行一次排空及耐压试验。Kitchen Exhaust Hood Fire Extinguisher System - Visually inspect every month厨房排烟罩防火 每月检查一次 Professionally inspected/tested/maintained every 6 months or more frequently if required by code.每6个月进行一次专业性的检查、测试、维修,如本地有特殊要求应该按本地

28、要求执行。Kitchen Exhaust Hood filters - Cleaned/degreased weekly or more frequently if required.厨房排烟罩过滤器 每周进行清洁、去油烟,如有特殊要求,按要求执行Kitchen Exhaust Hood Duct System-Chemically cleaned/fire proofed every 3 months or more frequently if required.厨房排烟道系统 3个月做一次药物清洁、防火处理,如有特殊需要,按需要执行。NOTE: Ensure there are adequ

29、ate access panels to facilitate clean-out of the entire kitchen exhaust hood duct system.备注:要确保检查口的大小适宜以方便清洁人员对厨房排烟罩和管道进行清洁。Emergency lighting - Operate for 90 seconds every 6 months应急灯 每6个月需要将应急灯运行90秒钟。Escape Routes/Exit Signs - Visually inspect entire building monthly消防逃生路线、走火图每月对整个大楼的消防逃生路线、走火图进行

30、一次检查。Automatic Fire Doors - Test for heat or smoke operation every 6 months自动消防门 每6个月对热感和烟感测试一次。Fire Exit Doors - Visually check operation every month 安全出口 每月进行检查一次Laundry Dryer Exhaust Ducts - Inspect and clean every 6 months or more frequently if required.洗衣房烘干机排烟道 每6个月对其进行一次检查和清洁,如有特殊要求,按要求执行。Lau

31、ndry Room Exhaust - Inspect and clean every 6 months or more frequently if required.洗衣房排烟 每6个月对其进行一次检查和清洁,如有特殊要求,按要求执行。NOTE: Ensure there are adequate access panels to facilitate clean-out of the entire dryer exhaust system and room exhaust system备注:要确保检查口的大小适宜以方便清洁人员对厨房排烟罩和管道进行清洁。Laundry Dryer Lint

32、 Screens/ Lint Collection Devices- Clean daily by laundry烘干机过滤网/尘毛箱 由洗衣房负责每日对其进行清洁。Trash and Linen Chute Doors - Check for proper operation monthly垃圾通道和布草槽门 每月检查一次Fire Cart/ Fire suitcase/ Back pack - Inventory monthly消防推车/灭火器材手提箱/背包 每月进行一次盘点Main Gas Valves - Check for proper operation by Gas Compan

33、y annually燃气主控制阀 由燃气公司每年进行一次检查Elevators Pits - Cleaned by elevator service company monthly (not to be done by in-house employees)电梯井 由电梯服务公司每月进行一次检查(不可以由酒店员工进行)Elevators - Professional safety inspection annually or more frequently if required by code.电梯 每年进行一次专业性的安全检查,如本地有特殊要求,按要求执行。Boilers and Pres

34、sure Vessels Prof. safety inspection annually or more frequently if required by code.锅炉和压力容器 每年进行一次专业性的安全检查,如本地有特殊要求,按要求执行。NOTE: There are minimum requirements. If local authorities require more frequent maintenance, above schedule is to be changed accordingly.备注:以上为最低标准的要求。如本地相关管理部门需要酒店对其设备做次数的维护,应

35、按要求对以上各项作适当的调整。Figure 2. General Tasks / 表2总任务表The following is an overview of General tasks.以下为总任务表Task(任务) Schedule(计划)Fire drills are to be conducted with as Monthly much realism as possible and the time of drill varied so that all shifts can participate during the year. (hotel guests can not par

36、ticipate)根据实际情况尽量组织消防演习活动 在不同的时间里安排消防演习以确保每个班次的员工都有机会参加。(酒店的客人无需参加)Fire evacuation drill is to be conducted Annually for all people of hotel guests are urged to participate.组织员工参加消防疏散演习。 对此有兴趣的酒店员工及客人也可参加。Fire and emergency procedure - Start of employment training is to be conducted for all new asso

37、ciates消防与突发事件的演习 尽量安排在员工入职时培训。Fire and emergency procedure training - Every 3 months is to be conducted for operators and NM. 消防与突发事件的演习 每3个月对话务员与夜班经理进行消防紧急程序的培训。NOTE: All emergency procedures are to be reviewed, tested for their effectiveness, updated, and coordinated with Fire Department.(i.e., ev

38、acuation drills, bomb threats, earthquake, etc.)备注:每年与消防局一起,对所有演习的实际效果进行审阅、检测、总评。(如疏散演习,爆炸恐吓和地震等等)Where required, flame-proofing Certificates for fabric materials are to be obtained and updated.(As required and/or after dry cleaning)在需要的地方应使用防火的织物。(按要求在干洗后)Emergency instructions and exit signage in

39、guest rooms must be verified via the ken fit-it mechanic.(Every 4 months)由万能工负责经常对紧急时刻指示标识和客房内的走火图进行检查(每4个月)The fire emergency signage in the elevator foyers are to be verified Weekly经常对电梯厅内的消防紧急标识进行检查(每周)All areas of the building must be inspected to detect any changes in fire load, accumulation of

40、 trash or dirt (particular attention to the kitchen area for accumulation of combustible materials such as oil and grease and laundry area for Lint build-up) (Monthly)检查酒店的每一个角落,注意每一个可能火灾隐患,如垃圾堆。(特别注意厨房区域的垃圾,如油、油脂和洗衣房的灰尘堆集。)(每月)All dedicated electric service closets, switch gear rooms, transformer v

41、aults/ closets, etc. are not beingused for storage of any material combustible or other material.(Monthly)不可将专用电箱、配电房和变压器房用作储藏室或其它用途使用。(每月)The punctual emptying of waste baskets, trash cans and ashtrays, is to be checked. Ensure trash has been removed from floors at end of day shift.(Weekly)及时清理垃圾筐,清洁垃圾碎片和烟灰缸,确保在下班前将所有垃圾已清理干净。(每周)The proper storage of grease and oil rags (i.e., approved containers) is to be verified.(Monthly)在适当的区域储放油脂和油布(如:在适当的容器内)。(每月)The safe laundering of rubber-backed bath mats, grease rags etc. is to be verified. (Monthly)在洗烫浴垫、油布等易燃品应格外注意。(每月)6 / 6

展开阅读全文
部分上传会员的收益排行 01、路***(¥15400+),02、曲****(¥15300+),
03、wei****016(¥13200+),04、大***流(¥12600+),
05、Fis****915(¥4200+),06、h****i(¥4100+),
07、Q**(¥3400+),08、自******点(¥2400+),
09、h*****x(¥1400+),10、c****e(¥1100+),
11、be*****ha(¥800+),12、13********8(¥800+)。
相似文档                                   自信AI助手自信AI助手
搜索标签

当前位置:首页 > 包罗万象 > 大杂烩

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服