资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,Task 15:PPAP,*,20-Sep-99,Supplier Performance Development Process,Task 15 PPAP,20-Sep-99,1,Task 15:PPAP,Task Description,P,roduction,P,art,A,pproval,P,rocess(PPAP),Production parts are manufactured at the production site using production tooling,gaging,equipment,operators,etc,Parts from production run are analyzed,Test results and records from APQP are submitted with Part Submission Warrant,PPAP,20-Sep-99,2,Task 15:PPAP,Purpose,For the supplier to demonstrate,all design records and specification requirements are properly understood,the process has the capability to produce product that meets requirements,20-Sep-99,3,Task 15:PPAP,Something,Changed,Application,AIAG PPAP manual defines when PPAP submission is required,New part,Correction to discrepancy in previous submission,Design or process change,Change in source of subcontracted materials or services,transfer or rearrangement of tooling&equipment,20-Sep-99,4,Task 15:PPAP,Methodology,Buyer enters PPAP submission date on purchase order,Approver determines submission level,default level 3,default level 4 for raw material,Supplier submits PPAP,PPAPALL.xls electronic submission recommended,Approver evaluates PPAP package,Level 5 at supplier site,Approver determine part submission status,Notify supplier and manufacturing of status,20-Sep-99,5,Task 15:PPAP,DFMEA,Control Plan,Early Production Containment Plan(Pre-Launch Control Plan),Process capability studies,Gage Measurement System Analysis,Lab Accreditation&scope,Restricted&Reportable Materials form,Interim Worksheet,if required,Supplier Data Received,Warrant,Appearance Approval Report(AAR),as required,Sample Parts,Print/Design Record,Engineering Change Documents,Check fixtures/aids,Process Flow Diagram,PFMEA,20-Sep-99,6,Task 15:PPAP,PPAP Review Checklist,Delphi checklist to assist with evaluation of PPAP package,Action plan created with use of checklist,20-Sep-99,7,Task 15:PPAP,Flow Chart,Linkage of Product Characteristics from,DFMEA,to Operational Steps,Operation numbers consistent with,PFMEA,Control,Plan,Operator,Instructions,Ensure identification of inspection and rework,Use A-6 Process Flow Chart checklist in APQP manual to evaluate,20-Sep-99,8,Task 15:PPAP,PFMEA,Linkage with DFMEA,Process Flow,Control Plan,Operator Instructions,etc,Degree to which high RPNs are addressed with preventive strategies,Action Plans assigned,implemented,effectiveness assessed and RPN recalculated,Use A-7 Process FMEA checklist in APQP manual,RPN=504,20-Sep-99,9,Task 15:PPAP,DFMEA,Assess feasibility,risk,design intent issues,Confirm manufacturing process capability considered,Focus on Critical Characteristics,Lessons Learned incorporated,Use A-1 Design FMEA checklist in APQP manual to evaluate,20-Sep-99,10,Task 15:PPAP,Control Plan,Ensure Control Plan is aligned to,and correlates with,DFMEA,Process Flow,PFMEA,Control Methods appropriate to variation type(s),Incorporates Lessons Learned,Statistical Data,Use A-8 Control Plan checklist in APQP manual to evaluate,20-Sep-99,11,Task 15:PPAP,Pre-Launch Control Plan,Early Production Containment requirements,Additional controls included for proper duration or quantity,PFMEA and statistical data used to determine what additional controls necessary,short term capability,long term capability on similar process,20-Sep-99,12,Task 15:PPAP,Process Capability Studies,20-Sep-99,13,Task 15:PPAP,MSA Studies,Measurement uncertainty determined,Gage R&R,Bias,Stability,and Linearity,Gage R&R acceptance guidelines,30%unacceptable,measuring system needs improvement,Verify study performed correctly,20-Sep-99,14,Task 15:PPAP,Part Submission Status,Full Production Approval,Interim Approval,Authorize shipment to Delphi without Full Production Approval,Corrective Action Plan is required,Rejected,Corrected submission required before production quantities may be shipped,20-Sep-99,15,Task 15:PPAP,Ensure Control Plan is aligned to,and correlates with,DFMEA,Process Flow,PFMEA,Ensure Control Plan is aligned to,and correlates with,DFMEA,Process Flow,PFMEA,long term capability on similar process,Restricted&Reportable Materials form,Pre-Launch Control Plan,Degree to which high RPNs are addressed with preventive strategies,Lorem ipsum dolor sit amet,consectetur adipiscing elit.,10月-2210月-22Tuesday,October 25,2022,10月-2218:41:0018:41Oct-2225-Oct-22,Verify study performed correctly,Print/Design Record,Supplier submits PPAP to proper level,Task 15:PPAP,Ensure identification of inspection and rework,Process Flow Diagram,Part Submission Status,Notify supplier and manufacturing of status,PFMEA and statistical data used to determine what additional controls necessary,Task 15:PPAP,Task 15:PPAP,GM 1411 Interim Approval Worksheet,10月-2210月-22Tuesday,October 25,2022,Approver evaluates PPAP package,Task Description,AIAG QS-9000 Manual,GM 1411 Interim Approval Worksheet,all design records and specification requirements are properly understood,Interim Part Class,A,parts from production tooling and meet specs,not all PPAP requirements have been met,B,parts from production tooling and require rework to meet specs,C,parts not from production tooling,parts meet specs,D,parts do not meet specs,E,parts do not meet specs and vehicles with class E parts require retrofit to make them saleable,20-Sep-99,16,Task 15:PPAP,Summary,AIAG PPAP manual defines requirements,APQP Product and Process Validation,Supplier submits PPAP to proper level,PPAP package evaluated and status determined,Supplier and Delphi manufacturing site notified of PPAP approval status,20-Sep-99,17,Task 15:PPAP,Reference Documents,AIAG PPAP,SPC,MSA,APQP and Control Plan manuals,GM 1411 Interim Approval Worksheet,AIAG QS-9000 Manual,Appendix 20:PPAP checklist,Appendix 13:PPAPALL.XLS,20-Sep-99,18,Task 15:PPAP,9,、静夜四无邻,荒居旧业贫。,10月-26,10月-26,Sunday,October 4,2026,10,、雨中黄叶树,灯下白头人。,12:46:15,12:46:15,12:46,10/4/2026 12:46:15 PM,11,、以我独沈久,愧君相见频。,10月-26,12:46:15,12:46,Oct-26,04-Oct-26,12,、故人江海别,几度隔山川。,12:46:15,12:46:15,12:46,Sunday,October 4,2026,13,、乍见翻疑梦,相悲各问年。,10月-26,10月-26,12:46:15,12:46:15,October 4,2026,14,、他乡生白发,旧国见青山。,04 十月 2026,12:46:15 下午,12:46:15,10月-26,15,、比不了得就不比,得不到的就不要。,。,十月 26,12:46 下午,10月-26,12:46,October 4,2026,16,、行动出成果,工作出财富。,2026/10/4 12:46:15,12:46:15,04 October 2026,17,、做前,能够环视四周;做时,你只能或者最好沿着以脚为起点的射线向前。,12:46:15 下午,12:46 下午,12:46:15,10月-26,9,、没有失败,只有暂时停止成功!。,10月-26,10月-26,Sunday,October 4,2026,10,、很多事情努力了未必有结果,但是不努力却什么改变也没有。,12:46:15,12:46:15,12:46,10/4/2026 12:46:15 PM,11,、成功就是日复一日那一点点小小努力的积累。,10月-26,12:46:15,12:46,Oct-26,04-Oct-26,12,、世间成事,不求其绝对圆满,留一份不足,可得无限完美。,12:46:15,12:46:15,12:46,Sunday,October 4,2026,13,、不知香积寺,数里入云峰。,10月-26,10月-26,12:46:15,12:46:15,October 4,2026,14,、意志坚强的人能把世界放在手中像泥块一样任意揉捏。,04 十月 2026,12:46:15 下午,12:46:15,10月-26,15,、楚塞三湘接,荆门九派通。,。,十月 26,12:46 下午,10月-26,12:46,October 4,2026,16,、少年十五二十时,步行夺得胡马骑。,2026/10/4 12:46:15,12:46:15,04 October 2026,17,、空山新雨后,天气晚来秋。,12:46:15 下午,12:46 下午,12:46:15,10月-26,9,、杨柳散和风,青山澹吾虑。,10月-26,10月-26,Sunday,October 4,2026,10,、阅读一切好书如同和过去最杰出的人谈话。,12:46:15,12:46:15,12:46,10/4/2026 12:46:15 PM,11,、越是没有本领的就越加自命不凡。,10月-26,12:46:15,12:46,Oct-26,04-Oct-26,12,、越是无能的人,越喜欢挑剔别人的错儿。,12:46:15,12:46:15,12:46,Sunday,October 4,2026,13,、知人者智,自知者明。胜人者有力,自胜者强。,10月-26,10月-26,12:46:15,12:46:15,October 4,2026,14,、意志坚强的人能把世界放在手中像泥块一样任意揉捏。,04 十月 2026,12:46:15 下午,12:46:15,10月-26,15,、最具挑战性的挑战莫过于提升自我。,十月 26,12:46 下午,10月-26,12:46,October 4,2026,16,、业余生活要有意义,不要越轨。,2026/10/4 12:46:15,12:46:15,04 October 2026,17,、一个人即使已登上顶峰,也仍要自强不息。,12:46:15 下午,12:46 下午,12:46:15,10月-26,MOMODA POWERPOINT,Lorem ipsum dolor sit amet,consectetur adipiscing elit.Fusce id urna blandit,eleifend nulla ac,fringilla purus.Nulla iaculis tempor felis ut cursus.,感谢您的下载观看,专家告诉,
展开阅读全文