收藏 分销(赏)

KIST4外墙分包合同.doc

上传人:仙人****88 文档编号:8152173 上传时间:2025-02-05 格式:DOC 页数:2 大小:34.50KB 下载积分:10 金币
下载 相关 举报
KIST4外墙分包合同.doc_第1页
第1页 / 共2页
KIST4外墙分包合同.doc_第2页
第2页 / 共2页
本文档共2页,全文阅读请下载到手机保存,查看更方便
资源描述
This Agreement is made and entered into on 2007. BY AND BETWEEN China Civil Engineering Construction Corporation in Rwanda (Hereinafter called MAIN CONTRACTOR) with registered office at P.O. Box 6788 Kigali (Rwanda) and represented by Mr. Zhong jing as Site Manager of the said company. AND Crown Buildings and Products Ltd (Hereinafter called THE SUB-CONTRACTOR) located in Kigali-Rwanda and represented by Mr. as of the said company. NOW IT IS HEREBY AGREED AS FOLLOWINGS: Content of the task: the total area is approx 6800 sq mtr as per information confirmed by both of the Main-Contractor and the sub-contractor. The Obligations of the Main Contractor: 1. The main contractor will procure the material from the Sub-Contractor for which the Performa is attached herewith. 2. The Main-Contractor will provide the Sub-Contractor with the necessary scaffolding, but all the other tools will be offered by the Sub-Contractor. 3. The Main-Contractor takes charge of the Customs Clearance of the materials and all the charge correlative. 4. After received and verified correct, the Main-Contractor must pay for the materials within 5 days. For the labor cost, the Main-Contractor pays according to the works done. An amount of 10% of the payment will be deducted from every payment as the retention money and this amount will be paid by one time after the check and accept of the whole project KIST Ⅳ. The Obligations of the Sub-Contractor: 1. The Sub-Contractor will arrange the transport of the materials. 2. The Sub-Contractor must finish all the works within one month. If the work is delayed by the Main-Contractor, the Main-Contractor will pay for all the charges correlative; if it is delayed by the Sub-Contractor, except continue to finish the whole work, the Sub-Contractor will charge all the charges correlative and all the retention money will be deducted by the Main-Contractor. 3. The Sub-Contractor must follow the instruction book of the materials during application and must ensure the quality. The thickness of the Ruff N Tuff should be 1.5mm to 2mm , and no chromatic aberration, with 10 years guarantee period. 4. The Sub-Contractor must ensure the safety of the builder, in case of any problem of safety, the Sub-Contractor will charge everything. 5. The Sub-Contractor has the obligation to take action to protect the finished product. In case of any pollution of the finished product caused by the Sub-Contractor, the Sub-Contractor must charge the rehabilitation without any premium charge to the Main-Contractor. SIGN BY Main Contractor Sub-Contractor Site Manager Managing Director Attachment: -The proforma invoice of Ruff N Tuff
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 教育专区 > 小学其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2025 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服