收藏 分销(赏)

第五册-电缆平面、剖面图-已翻译.docx

上传人:xrp****65 文档编号:7459568 上传时间:2025-01-05 格式:DOCX 页数:6 大小:23.58KB 下载积分:10 金币
下载 相关 举报
第五册-电缆平面、剖面图-已翻译.docx_第1页
第1页 / 共6页
第五册-电缆平面、剖面图-已翻译.docx_第2页
第2页 / 共6页


点击查看更多>>
资源描述
1. 缅甸工厂变配电工程Myanmar workshop electric transformer and distribution project 2. CAD版本 version 3. 设计证书编号 design certificate number 4. 日 期 Date 5. 批 准 Approval 6. 审 核 Review 7. 校 核 verification 8. 设 计 Design 9. 电缆沟(行人)平面图 Electric cable duct (pedestrian) 10. 比例 proportion 11. 图别 drawing type 12. 图号 drawing number 13. 电气施工 electricity construction 14. 说明: explanation 15. 1.本图为行人道路六线电缆沟。图中尺寸以毫米标示,标高以米标示。 1. This drawing is side walk six-line cable duct. Dimension in the drawing is marked by millimeter and elevation by meter. 16. 2.若市政部门要求电缆走廊沉底时,缆沟宜每隔20米设置检查井一个,每隔60米设置电缆中间头井一个。 2. If municipal administration requires that cable duct be placed at the bottom at corridor, an inspection shaft shall be set every 20m for cable duct and a middle end-well of cable duct shall be set every 60m. 17. 3.要求检查井及电缆中间头井盖板顶面标高应与行人路面标高一致。 3. It is required that top elevation of cover plate of inspection shaft and middle end-well be identical with side walk elevation. 18. 4.沉底段电缆沟的深度由施工单位与市政部门确定具体的尺寸,并且该段的缆沟压梁不需预埋镀锌角铁 Galvanized angle iron。 4. Depth of cable duct at bottom section shall be determined by contractor and municipal administration, and there is no need to pre-embed galvanized angle iron for cable duct pressure beam in this section. 19. 5.电缆沟施工后,电缆沟的板面与市政路面标高低于部分宜回填石粉或按原来地面进行修复,修复后高度与市政路面标高一致。 5. After construction of cable duct, if the elevation of plate surface of cable duct is lower than that of municipal administration road way, it should be backfilled with backfilling limestone or restored according to the original ground surface; elevation after restoration should be identical with that of municipal administration road way. 20. 6.电缆沟宜每隔20米设Φ200PVC管集水口 Gulley一个,管内须填满粗沙。纵向集水口的坡度不小于0.5%。 6. A Φ200PVC pipe gulley shall be set every 20m in cable duct; coarse sand shall be filled inside the pipes; the gradient of longitudinal gulley shall be no smaller than 0.5%. 21. 7.电缆沟支架纵向间距800mm处安装。 7. Cable duct bracket shall be installed 800mm in longitudinal distance. 22. 8.电缆沟长度超过50米时,砌体及压梁应设置伸缩缝。 8. When the length of cable duct surpasses 50m, brickwork and pressure beam shall be set with expansion joint. 23. 9.电缆沟的走廊的路面应每隔10米处设置电缆标志牌。 9. Sign board shall be set at corridor of cable duct every 10m. 24. 10.浇制混凝土时必须符合国家标准《结构工程施工及验收规范》。 10. When concrete is being casted, it should conform to national standard of Structural Project Construction and Acceptance Regulation. 25. 11.如电缆走廊属于浮面时,电缆沟与转角井、T字井、十字井等连接处,宜按20%坡度将电缆沟底部进行纵向放坡。 11. If cable duct is floated on the corridor surface, longitudinal slope setting shall be made at the bottom of cable duct according 20% gradient at connecting places of cable duct with intersection, T-shaped section and cross section wells. 26. 27. 注:剖面图详见图纸PGDD-GX-002。 Note: for detailed profiled drawings, please refer to drawing PGDD-GX-002. Note: for details about profile drawing, please refer to drawing PGDD-GX-002. 28. 六线电缆沟(行人)平面图 Electric cable duct (pedestrian) 29. 标志牌 Sign board 30. 高压电缆 High-voltage power cable 31. 960×500×80预制砼盖板pre-fabricated cover plate 32. 电缆支架 Cable bracket 33. 镀锌角铁 Galvanized angle iron 34. 集水口 Gulley 35. φ200 PVC管φ200 PVC pipe 36. 37. 38. 39. 电缆沟(行人)剖面图 cable duct (pedestrian) profile drawing 40. 浮面六线沟剖面图 Water plane six-line cable duct profile drawing 41. 回填石粉 Backfilling limestone 42. 预埋镀锌角铁 Galvanized angle iron 43. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian) 44. ±0.00市政路面 municipal administration road way 45. 回填石粉 Backfilling limestone 46. 回填原土并夯实 Backfilling and compacting the original soil 47. 砌MU7.5砖MU7.5 bricking 48. M10水泥砂浆 cement mortar 49. C15素砼垫层 Lean concrete cushion layer 50. 批1:2水泥砂浆 cement mortar 51. 15厚 15 thick 52. 53. 沉底六线沟剖面图 Bottom six-line cable duct profile drawing 54. C15素砼垫层 Lean concrete cushion layer 55. M10水泥砂浆 cement mortar 56. 砌MU7.5砖MU7.5 bricking 57. 回填原土并夯实 Backfilling and compacting the original soil 58. 批1:2水泥砂浆 cement mortar 59. 15厚 15 thick 60. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian) 61. 回填石粉 Backfilling limestone 62. C20砼 CONCRETE 63. ±0.00市政路面 municipal administration road way 64. 65. 六线沟集水口剖面图Six-line gulley profile drawing 66. 回填石粉 Backfilling limestone 67. 预埋镀锌角铁 Galvanized angle iron 68. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian) 69. ±0.00市政路面 municipal administration road way 70. C20砼 CONCRETE 71. 回填石粉 Backfilling limestone 72. 回填原土并夯实 Backfilling and compacting the original soil 73. 砌MU7.5砖MU7.5 bricking 74. M10水泥砂浆 cement mortar 75. C15素砼垫层 Lean concrete cushion layer 76. 内填粗砂 filled with coarse sand inside 77. φ200 PVC管φ200 PVC pipe 78. 批1:2水泥砂浆 cement mortar 79. 15厚 15 thick 80. 支架50*60*510 bracket 50*60*510 81. 82. 83. 电缆沟(行人)转角井平面图 Cable duct (pedestrian) Intersection well floor plan 84. 注:A-A、B-B、I-I剖断面图详见图纸PGDD-GX-006。 Note: for A-A, B-B & I-I profile cross section diagram, please refer to drawing PGDD-GX-006 85. 说明: explanation 86. 1.本图为行人道路六线电缆沟的转角井。设计征求原有规范标准要求,新建时按当地供电部门意见。图中尺寸以毫米标示,标高以米标示。 1. This drawing is side walk six-line cable duct intersection well drawing. The design seeks the original regulated and standardized requirements and accords with comments provided by local power supply department during construction. The dimension in the drawing is marked by millimeter and elevation by meter. 87. 2.要求电缆转角井盖板顶面标高应与行人路面标高一致。 2. The top elevation of cable duct intersection well cover plate shall be identical with that of side walk surface. 88. 3.施工后电缆转角井侧作业面宜先回填砂质粘土后再回填石粉或按原来地面进行修复,修复后高度应与市政路面标高一致。 3. After construction, the working face of cable duct intersection well shall be backfilled with sandy clay before backfilling of limestone or repaired according to the original ground surface; the elevation after restoration shall be identical with that of municipal administration road way. 89. 4.井内宜设置φ200PVC管集水口 Gulley一个,管内须填满粗沙。纵向集水口 Gulley的坡度不小于0.5%。 4. A φ200PVC pipe gulley shall be set inside the well; the pipe shall be filled with coarse sand inside; the gradient of longitudinal gulley shall be no less than 5%. 90. 5.电缆转角井面应设置电缆标志牌。 5. Sign board of cable duct shall be set at cable duct intersection well. 91. 6.如电缆走廊属于浮面时,电缆沟与转角井连接处,宜按20%坡度将电缆沟底部进行纵向放坡。 6. If cable duct is floated on the corridor surface, longitudinal slope setting shall be made at the bottom of cable duct according 20% gradient at connecting places of cable duct with intersection well. 92. 93. 转角井平面图(一) intersection well floor plan(1) 94. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece) 95. 镀锌角铁 Galvanized angle iron 96. 水泥支架 Cement holder 97. 集水口 Gulley 98. φ200 PVC管φ200 PVC pipe 99. 标志牌 Sign board 100. 高压电缆 High-voltage power cable 101. 960×300×80预制砼盖板(六块) pre-fabricated concrete cover plate (six pieces) 102. 镀锌角铁 Galvanized angle iron 103. 104. 转角井平面图 intersection well floor plan intersection well floor plan(二) 105. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece) 106. 镀锌角铁 Galvanized angle iron 107. 标志牌 Sign board 108. 高压电缆 High-voltage power cable 109. 水泥支架 Cement holder 110. 集水口 Gulley 111. φ200 PVC管φ200 PVC pipe 112. 960×300×80预制砼盖板(六块) pre-fabricated concrete cover plate (six pieces) 113. 镀锌角铁 Galvanized angle iron 114. 115. 电缆沟(行人)T字井平面图 Cable duct (pedestrian) T-shaped section floor plan 116. 注:A-A、B-B、I-I剖断面图详见图纸PGDD-GX-010。 Note: for A-A, B-B & I-I detailed profile cross section diagram, please refer to drawing PGDD-GX-010. 117. 说明: explanation 118. 1.本图为行人道路六线电缆沟的T字井。设计征求原有规范标准要求,新建时征求当地供电部门意见。图中尺寸以毫米标示,标高以米标示。 1. This drawing is side walk six-line cable duct T-shaped well drawing. The design seeks the original regulated and standardized requirements and accords with comments provided by local power supply department during construction. The dimension in the drawing is marked by millimeter and elevation by meter. 119. 2.要求电缆T字井盖板顶面标高应与行人路面标高一致。 2. The top elevation of cable duct T-shaped well cover plate shall be identical with that of side walk surface. 120. 3.施工后电缆T字井侧作业面宜先回填砂质粘土后再回填石粉或按原来地面进行修复,修复后高度应与市政路面标高一致。 3. After construction, the working face of cable duct T-shaped well shall be backfilled with sandy clay before backfilling of limestone or repaired according to the original ground surface; the elevation after restoration shall be identical with that of municipal administration road way. 121. 4.井内宜设置φ200PVC管集水口一个,管内须填满粗沙。纵向集水口的坡度不小于0.5%。 4. A φ200PVC pipe gulley shall be set inside the well. The pipe shall be filled with coarse sand inside; the gradient of longitudinal gulley shall be no less than 5%. 122. 5.电缆T字井面应设置电缆标志牌. Sign board of cable duct shall be set at cable duct T-shaped well. 123. 6.如电缆走廊属于浮面时,电缆沟与T字井连接处,宜按20%坡度将电缆沟底部进行纵向放坡。 6. If cable duct is floated on the corridor surface, longitudinal slope setting shall be made at the bottom of cable duct according 20% gradient at connecting places of cable duct with T-shaped well. 124. 125. 六线T字井平面图 Six-line T-shaped section floor plan 126. 镀锌角铁 Galvanized angle iron 127. 960×300×80盖板(四块) 128. 转弯支架 Turning holder 129. 水泥支架 Cement holder 130. φ200 PVC管φ200 PVC pipe 131. 集水口 Gulley 132. 960×300×80预制砼盖板(九块) Pre-fabricated concrete cover plate (nine pieces) 133. 高压电缆 High-voltage power cable 134. 标志牌 Sign board 135. 镀锌角铁 Galvanized angle iron 136. 137. 电缆沟(行人)十字井平、剖面图 Cable duct (pedestrian) cross section floor plan and profile drawing 138. B-B十字井剖面图 cross section profile drawing 139. φ200PVC管 内填粗沙φ200PVC pipe filled with coarse sand inside 140. C15素砼垫层 Lean concrete cushion layer 141. 批1:2水泥砂浆 cement mortar 142. 15厚 15 thick 143. M10水泥砂浆 cement mortar 144. 砌MU7.5砖MU7.5 bricking 145. 支架50*60*510 Bracket 146. 回填原土并夯实 Backfilling and compacting the original soil 147. 回填石粉 Backfilling limestone 148. C20砼 CONCRETE 149. 预埋镀锌角铁 Galvanized angle iron 150. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian) 151. ±0.00市政路面 municipal administration road way 152. 153. A-A十字井剖面图 A-A cross section profile drawing 154. φ200PVC管 内填粗沙φ200PVC pipe filled with coarse sand inside 155. C15素砼垫层 Lean concrete cushion layer 156. 批1:2水泥砂浆 wholesale 1:2 cement mortar 157. 15厚15 thick 158. M10水泥砂浆 cement mortar 159. 砌MU7.5砖MU7.5 bricking 160. 支架50*60*510 Bracket 50*60*510 161. 回填原土并夯实 Backfilling and compacting the original soil 162. C20砼 CONCRETE 163. 回填石粉 Backfilling limestone 164. 预埋镀锌角铁 Galvanized angle iron 165. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian) 166. ±0.00市政路面 municipal administration road way 167. 168. 六线沟十字井平面图 Cable duct cross section floor plan 169. 镀锌角铁 Galvanized angle iron 170. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece) 171. 水泥支架 Cement holder 172. 标志牌 Sign board 173. 高压电缆 High-voltage power cable 174. 水泥支架 Cement holder 175. 集水口 Gulley 176. 转弯支架 Turning holder 177. 转弯支架 Turning holder 178. 镀锌角铁 Galvanized angle iron 179. 960×300×80预制砼盖板(九块) Pre-fabricated concrete cover plate (nine pieces) 180. 水泥支架 Cement holder 181. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece) 182. 镀锌角铁 Galvanized angle iron 183.
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 应用文书 > 其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2026 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服