1. 缅甸工厂变配电工程Myanmar workshop electric transformer and distribution project
2. CAD版本 version
3. 设计证书编号 design certificate number
4. 日 期 Date
5. 批 准 Approval
6. 审 核 Review
7. 校 核 verification
8. 设 计 Design
9. 电缆沟(行人)平面图 Electric cable duct (pedestrian)
10. 比例 proportion
11. 图别 drawing type
12. 图号 drawing number
13. 电气施工 electricity construction
14. 说明: explanation
15. 1.本图为行人道路六线电缆沟。图中尺寸以毫米标示,标高以米标示。
1. This drawing is side walk six-line cable duct. Dimension in the drawing is marked by millimeter and elevation by meter.
16. 2.若市政部门要求电缆走廊沉底时,缆沟宜每隔20米设置检查井一个,每隔60米设置电缆中间头井一个。
2. If municipal administration requires that cable duct be placed at the bottom at corridor, an inspection shaft shall be set every 20m for cable duct and a middle end-well of cable duct shall be set every 60m.
17. 3.要求检查井及电缆中间头井盖板顶面标高应与行人路面标高一致。
3. It is required that top elevation of cover plate of inspection shaft and middle end-well be identical with side walk elevation.
18. 4.沉底段电缆沟的深度由施工单位与市政部门确定具体的尺寸,并且该段的缆沟压梁不需预埋镀锌角铁 Galvanized angle iron。
4. Depth of cable duct at bottom section shall be determined by contractor and municipal administration, and there is no need to pre-embed galvanized angle iron for cable duct pressure beam in this section.
19. 5.电缆沟施工后,电缆沟的板面与市政路面标高低于部分宜回填石粉或按原来地面进行修复,修复后高度与市政路面标高一致。
5. After construction of cable duct, if the elevation of plate surface of cable duct is lower than that of municipal administration road way, it should be backfilled with backfilling limestone or restored according to the original ground surface; elevation after restoration should be identical with that of municipal administration road way.
20. 6.电缆沟宜每隔20米设Φ200PVC管集水口 Gulley一个,管内须填满粗沙。纵向集水口的坡度不小于0.5%。
6. A Φ200PVC pipe gulley shall be set every 20m in cable duct; coarse sand shall be filled inside the pipes; the gradient of longitudinal gulley shall be no smaller than 0.5%.
21. 7.电缆沟支架纵向间距800mm处安装。
7. Cable duct bracket shall be installed 800mm in longitudinal distance.
22. 8.电缆沟长度超过50米时,砌体及压梁应设置伸缩缝。
8. When the length of cable duct surpasses 50m, brickwork and pressure beam shall be set with expansion joint.
23. 9.电缆沟的走廊的路面应每隔10米处设置电缆标志牌。
9. Sign board shall be set at corridor of cable duct every 10m.
24. 10.浇制混凝土时必须符合国家标准《结构工程施工及验收规范》。
10. When concrete is being casted, it should conform to national standard of Structural Project Construction and Acceptance Regulation.
25. 11.如电缆走廊属于浮面时,电缆沟与转角井、T字井、十字井等连接处,宜按20%坡度将电缆沟底部进行纵向放坡。
11. If cable duct is floated on the corridor surface, longitudinal slope setting shall be made at the bottom of cable duct according 20% gradient at connecting places of cable duct with intersection, T-shaped section and cross section wells.
26.
27. 注:剖面图详见图纸PGDD-GX-002。
Note: for detailed profiled drawings, please refer to drawing PGDD-GX-002.
Note: for details about profile drawing, please refer to drawing PGDD-GX-002.
28. 六线电缆沟(行人)平面图 Electric cable duct (pedestrian)
29. 标志牌 Sign board
30. 高压电缆 High-voltage power cable
31. 960×500×80预制砼盖板pre-fabricated cover plate
32. 电缆支架 Cable bracket
33. 镀锌角铁 Galvanized angle iron
34. 集水口 Gulley
35. φ200 PVC管φ200 PVC pipe
36.
37.
38.
39. 电缆沟(行人)剖面图 cable duct (pedestrian) profile drawing
40. 浮面六线沟剖面图 Water plane six-line cable duct profile drawing
41. 回填石粉 Backfilling limestone
42. 预埋镀锌角铁 Galvanized angle iron
43. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian)
44. ±0.00市政路面 municipal administration road way
45. 回填石粉 Backfilling limestone
46. 回填原土并夯实 Backfilling and compacting the original soil
47. 砌MU7.5砖MU7.5 bricking
48. M10水泥砂浆 cement mortar
49. C15素砼垫层 Lean concrete cushion layer
50. 批1:2水泥砂浆 cement mortar
51. 15厚 15 thick
52.
53. 沉底六线沟剖面图 Bottom six-line cable duct profile drawing
54. C15素砼垫层 Lean concrete cushion layer
55. M10水泥砂浆 cement mortar
56. 砌MU7.5砖MU7.5 bricking
57. 回填原土并夯实 Backfilling and compacting the original soil
58. 批1:2水泥砂浆 cement mortar
59. 15厚 15 thick
60. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian)
61. 回填石粉 Backfilling limestone
62. C20砼 CONCRETE
63. ±0.00市政路面 municipal administration road way
64.
65. 六线沟集水口剖面图Six-line gulley profile drawing
66. 回填石粉 Backfilling limestone
67. 预埋镀锌角铁 Galvanized angle iron
68. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian)
69. ±0.00市政路面 municipal administration road way
70. C20砼 CONCRETE
71. 回填石粉 Backfilling limestone
72. 回填原土并夯实 Backfilling and compacting the original soil
73. 砌MU7.5砖MU7.5 bricking
74. M10水泥砂浆 cement mortar
75. C15素砼垫层 Lean concrete cushion layer
76. 内填粗砂 filled with coarse sand inside
77. φ200 PVC管φ200 PVC pipe
78. 批1:2水泥砂浆 cement mortar
79. 15厚 15 thick
80. 支架50*60*510 bracket 50*60*510
81.
82.
83. 电缆沟(行人)转角井平面图 Cable duct (pedestrian) Intersection well floor plan
84. 注:A-A、B-B、I-I剖断面图详见图纸PGDD-GX-006。
Note: for A-A, B-B & I-I profile cross section diagram, please refer to drawing PGDD-GX-006
85. 说明: explanation
86. 1.本图为行人道路六线电缆沟的转角井。设计征求原有规范标准要求,新建时按当地供电部门意见。图中尺寸以毫米标示,标高以米标示。
1. This drawing is side walk six-line cable duct intersection well drawing. The design seeks the original regulated and standardized requirements and accords with comments provided by local power supply department during construction. The dimension in the drawing is marked by millimeter and elevation by meter.
87. 2.要求电缆转角井盖板顶面标高应与行人路面标高一致。
2. The top elevation of cable duct intersection well cover plate shall be identical with that of side walk surface.
88. 3.施工后电缆转角井侧作业面宜先回填砂质粘土后再回填石粉或按原来地面进行修复,修复后高度应与市政路面标高一致。
3. After construction, the working face of cable duct intersection well shall be backfilled with sandy clay before backfilling of limestone or repaired according to the original ground surface; the elevation after restoration shall be identical with that of municipal administration road way.
89. 4.井内宜设置φ200PVC管集水口 Gulley一个,管内须填满粗沙。纵向集水口 Gulley的坡度不小于0.5%。
4. A φ200PVC pipe gulley shall be set inside the well; the pipe shall be filled with coarse sand inside; the gradient of longitudinal gulley shall be no less than 5%.
90. 5.电缆转角井面应设置电缆标志牌。
5. Sign board of cable duct shall be set at cable duct intersection well.
91. 6.如电缆走廊属于浮面时,电缆沟与转角井连接处,宜按20%坡度将电缆沟底部进行纵向放坡。
6. If cable duct is floated on the corridor surface, longitudinal slope setting shall be made at the bottom of cable duct according 20% gradient at connecting places of cable duct with intersection well.
92.
93. 转角井平面图(一) intersection well floor plan(1)
94. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece)
95. 镀锌角铁 Galvanized angle iron
96. 水泥支架 Cement holder
97. 集水口 Gulley
98. φ200 PVC管φ200 PVC pipe
99. 标志牌 Sign board
100. 高压电缆 High-voltage power cable
101. 960×300×80预制砼盖板(六块) pre-fabricated concrete cover plate (six pieces)
102. 镀锌角铁 Galvanized angle iron
103.
104. 转角井平面图 intersection well floor plan intersection well floor plan(二)
105. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece)
106. 镀锌角铁 Galvanized angle iron
107. 标志牌 Sign board
108. 高压电缆 High-voltage power cable
109. 水泥支架 Cement holder
110. 集水口 Gulley
111. φ200 PVC管φ200 PVC pipe
112. 960×300×80预制砼盖板(六块) pre-fabricated concrete cover plate (six pieces)
113. 镀锌角铁 Galvanized angle iron
114.
115. 电缆沟(行人)T字井平面图 Cable duct (pedestrian) T-shaped section floor plan
116. 注:A-A、B-B、I-I剖断面图详见图纸PGDD-GX-010。
Note: for A-A, B-B & I-I detailed profile cross section diagram, please refer to drawing PGDD-GX-010.
117. 说明: explanation
118. 1.本图为行人道路六线电缆沟的T字井。设计征求原有规范标准要求,新建时征求当地供电部门意见。图中尺寸以毫米标示,标高以米标示。
1. This drawing is side walk six-line cable duct T-shaped well drawing. The design seeks the original regulated and standardized requirements and accords with comments provided by local power supply department during construction. The dimension in the drawing is marked by millimeter and elevation by meter.
119. 2.要求电缆T字井盖板顶面标高应与行人路面标高一致。
2. The top elevation of cable duct T-shaped well cover plate shall be identical with that of side walk surface.
120. 3.施工后电缆T字井侧作业面宜先回填砂质粘土后再回填石粉或按原来地面进行修复,修复后高度应与市政路面标高一致。
3. After construction, the working face of cable duct T-shaped well shall be backfilled with sandy clay before backfilling of limestone or repaired according to the original ground surface; the elevation after restoration shall be identical with that of municipal administration road way.
121. 4.井内宜设置φ200PVC管集水口一个,管内须填满粗沙。纵向集水口的坡度不小于0.5%。
4. A φ200PVC pipe gulley shall be set inside the well. The pipe shall be filled with coarse sand inside; the gradient of longitudinal gulley shall be no less than 5%.
122. 5.电缆T字井面应设置电缆标志牌.
Sign board of cable duct shall be set at cable duct T-shaped well.
123. 6.如电缆走廊属于浮面时,电缆沟与T字井连接处,宜按20%坡度将电缆沟底部进行纵向放坡。
6. If cable duct is floated on the corridor surface, longitudinal slope setting shall be made at the bottom of cable duct according 20% gradient at connecting places of cable duct with T-shaped well.
124.
125. 六线T字井平面图 Six-line T-shaped section floor plan
126. 镀锌角铁 Galvanized angle iron
127. 960×300×80盖板(四块)
128. 转弯支架 Turning holder
129. 水泥支架 Cement holder
130. φ200 PVC管φ200 PVC pipe
131. 集水口 Gulley
132. 960×300×80预制砼盖板(九块) Pre-fabricated concrete cover plate (nine pieces)
133. 高压电缆 High-voltage power cable
134. 标志牌 Sign board
135. 镀锌角铁 Galvanized angle iron
136.
137. 电缆沟(行人)十字井平、剖面图
Cable duct (pedestrian) cross section floor plan and profile drawing
138. B-B十字井剖面图 cross section profile drawing
139. φ200PVC管 内填粗沙φ200PVC pipe filled with coarse sand inside
140. C15素砼垫层 Lean concrete cushion layer
141. 批1:2水泥砂浆 cement mortar
142. 15厚 15 thick
143. M10水泥砂浆 cement mortar
144. 砌MU7.5砖MU7.5 bricking
145. 支架50*60*510 Bracket
146. 回填原土并夯实 Backfilling and compacting the original soil
147. 回填石粉 Backfilling limestone
148. C20砼 CONCRETE
149. 预埋镀锌角铁 Galvanized angle iron
150. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian)
151. ±0.00市政路面 municipal administration road way
152.
153. A-A十字井剖面图 A-A cross section profile drawing
154. φ200PVC管 内填粗沙φ200PVC pipe filled with coarse sand inside
155. C15素砼垫层 Lean concrete cushion layer
156. 批1:2水泥砂浆 wholesale 1:2 cement mortar
157. 15厚15 thick
158. M10水泥砂浆 cement mortar
159. 砌MU7.5砖MU7.5 bricking
160. 支架50*60*510 Bracket 50*60*510
161. 回填原土并夯实 Backfilling and compacting the original soil
162. C20砼 CONCRETE
163. 回填石粉 Backfilling limestone
164. 预埋镀锌角铁 Galvanized angle iron
165. 预制砼盖板(行人) Pre-fabricated concrete cover plate (pedestrian)
166. ±0.00市政路面 municipal administration road way
167.
168. 六线沟十字井平面图 Cable duct cross section floor plan
169. 镀锌角铁 Galvanized angle iron
170. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece)
171. 水泥支架 Cement holder
172. 标志牌 Sign board
173. 高压电缆 High-voltage power cable
174. 水泥支架 Cement holder
175. 集水口 Gulley
176. 转弯支架 Turning holder
177. 转弯支架 Turning holder
178. 镀锌角铁 Galvanized angle iron
179. 960×300×80预制砼盖板(九块) Pre-fabricated concrete cover plate (nine pieces)
180. 水泥支架 Cement holder
181. 960×300×80预制砼盖板(四块) Pre-fabricated concrete cover plate (four piece)
182. 镀锌角铁 Galvanized angle iron
183.