收藏 分销(赏)

ProcessDesignBasis.doc

上传人:xrp****65 文档编号:7451648 上传时间:2025-01-05 格式:DOC 页数:2 大小:76.50KB 下载积分:10 金币
下载 相关 举报
ProcessDesignBasis.doc_第1页
第1页 / 共2页
ProcessDesignBasis.doc_第2页
第2页 / 共2页
本文档共2页,全文阅读请下载到手机保存,查看更方便
资源描述
ANY ONE OR MORE OF THE FOLLOWING 1. TENDER DOCUMENT INCLUDING PROCESS DETAILS 2. OVERALL PROCESS DESCRIPTION / DIAGRAM INCLUDING PLANT / UNIT CAPACITY 3. LICENSOR PROCESS DETAILS 4. CONCEPT OR PRE-FEED REPORT AVAILABLE - START PROCESS DESIGN BASIS ISSUED FOR COMMENTS (IFC) IS STANDARD FORMAT AVAILABLE ADOPT STANDARD FORMAT WITH FOLLOWING HEADINGS 1. ABBREVIATIONS & DEFINITIONS 2. INTRODUCTION 3. PROCESS DESCRIPTION 4. PROJECT SCOPE 5. DESIGN 6. DESIGN PHILOSOPHY 7. DESIGN CRITERIA 8. CODES & STANDARDS 9. REFERENCES 10. LIST OF HOLDS 11. APPENDICES GENERATE WORD DOCUMENT. PROCESS DESIGN BASIS MAY INCLUDE BASIS FOR BUT NOT BE LIMITED TO: 1. DESIGN PRESSURE 2. DESIGN TEMPERATURE 3. DESIGN OR MAXIMUM VELOCITIES FOR PIPING / PIPELINES 4. NPSHA (PUMP HYDRAULICS) 5. FOULING FACTORS (HEAT EXCHANGERS) 6. NOZZLE MOMENTUM VALUES (VESSELS / SEPARATORS) 7. PIPING ROUGHNESS VALUES 8. OPERATION, CONTROL & SAFEGUARDING PHILOSOPHY 9. ISOLATION PHILOSOPHY 10. DRAIN PHILOSOPHY 11. MATERIAL & CORROSION PHILOSOPHY 12. UTILITY REQUIREMENT & BATTERY LIMIT CONDITIONS FOR ISBL 13. CHEMICAL DOSING REQUIREMENT 14. FIRE, SMOKE & GAS DETECTION PHILOSOPHY 15. INSULATION REQUIREMENT NO YES CHECK AGAINST DISICIPLINE CHECK LIST & CORRECT IF NECESSARY ISSUE TO CLIENT AS “ISSUED FOR COMMENTS” (IFC) 1. REVISE TO INCORPORATE IF IN AGREEMENT 2. DISCUSS TO REMOVE IF NOT IN AGREEMENT NO 1. BACK CHECK 2. SDC REVISE TO INCORPORATE ISSUED FOR “IDC” IN FOLLOWING SEQUENCE 1. PIPING 2. C&A 3. MECHANICAL 4. ELECTRICAL 5. CIVIL 6. PIPELINE (IF APPLICABLE) 7. PROJECTS COMMENTS NO COMMENTS YES COMMENTS PROCESS DESIGN BASIS APPROVED FOR DESIGN (AFD) “IFC” – MASTER COPY - AVAILABLE START REVISE TO INCORPORATE CLIENT COMMENTS e.g. CHANGED SOW, PROJECTS CODES & STANDARDS PIPING / PIPELINE e.g. MOC, INSULATION, ISOLATION, DRAIN PHILOSOPHY e.g. CONTROL & SAFEGUARGING C & A FIRE, SMOKE & GAS DETECTION MECHANICAL e.g. UTILITY REQUIREMENT 1. INCORPORATED & REVISE IF IN AGREEMENT 2. DISCUSS TO REMOVE IF NOT IN AGREEMENT PREPARE DISCIPLINE CHECKLIST WITH “AFD” REVISION YES NO ISSUE TO CLIENT AS “APPROVED FOR DESIGN” (AFD) NO 1. BACK CHECK 2. “SDC” COMMENTS ISSUED FOR “IDC” IN FOLLOWING SEQUENCE 1. PIPING 2. C&A 3. MECHANICAL 4. ELECTRICAL 5. CIVIL 6. PIPELINE (IF APPLICABLE) 7. PROJECTS COMMENTS YES REVISE TO INCORPORATE
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 应用文书 > 其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2025 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服