资源描述
ANY ONE OR MORE OF THE FOLLOWING
1. TENDER DOCUMENT INCLUDING PROCESS DETAILS
2. OVERALL PROCESS DESCRIPTION / DIAGRAM INCLUDING PLANT / UNIT CAPACITY
3. LICENSOR PROCESS DETAILS 4. CONCEPT OR PRE-FEED REPORT
AVAILABLE - START
PROCESS DESIGN BASIS
ISSUED FOR COMMENTS (IFC)
IS STANDARD FORMAT AVAILABLE
ADOPT STANDARD FORMAT WITH FOLLOWING HEADINGS
1. ABBREVIATIONS & DEFINITIONS
2. INTRODUCTION
3. PROCESS DESCRIPTION
4. PROJECT SCOPE
5. DESIGN
6. DESIGN PHILOSOPHY
7. DESIGN CRITERIA
8. CODES & STANDARDS
9. REFERENCES
10. LIST OF HOLDS
11. APPENDICES
GENERATE WORD DOCUMENT. PROCESS DESIGN BASIS MAY INCLUDE BASIS FOR BUT NOT BE LIMITED TO:
1. DESIGN PRESSURE
2. DESIGN TEMPERATURE
3. DESIGN OR MAXIMUM VELOCITIES FOR PIPING / PIPELINES
4. NPSHA (PUMP HYDRAULICS)
5. FOULING FACTORS (HEAT EXCHANGERS)
6. NOZZLE MOMENTUM VALUES (VESSELS / SEPARATORS)
7. PIPING ROUGHNESS VALUES
8. OPERATION, CONTROL & SAFEGUARDING PHILOSOPHY
9. ISOLATION PHILOSOPHY
10. DRAIN PHILOSOPHY
11. MATERIAL & CORROSION PHILOSOPHY
12. UTILITY REQUIREMENT & BATTERY LIMIT CONDITIONS FOR ISBL
13. CHEMICAL DOSING REQUIREMENT
14. FIRE, SMOKE & GAS DETECTION PHILOSOPHY
15. INSULATION REQUIREMENT
NO
YES
CHECK AGAINST DISICIPLINE CHECK LIST & CORRECT IF NECESSARY
ISSUE TO CLIENT AS
“ISSUED FOR COMMENTS” (IFC)
1. REVISE TO INCORPORATE IF IN AGREEMENT
2. DISCUSS TO REMOVE IF NOT IN AGREEMENT
NO
1. BACK CHECK
2. SDC
REVISE TO INCORPORATE
ISSUED FOR “IDC” IN FOLLOWING SEQUENCE
1. PIPING
2. C&A
3. MECHANICAL
4. ELECTRICAL
5. CIVIL
6. PIPELINE (IF APPLICABLE)
7. PROJECTS
COMMENTS
NO COMMENTS
YES
COMMENTS
PROCESS DESIGN BASIS
APPROVED FOR DESIGN (AFD)
“IFC” – MASTER COPY - AVAILABLE
START
REVISE TO INCORPORATE
CLIENT
COMMENTS
e.g. CHANGED SOW,
PROJECTS
CODES & STANDARDS
PIPING / PIPELINE
e.g. MOC, INSULATION,
ISOLATION, DRAIN PHILOSOPHY
e.g. CONTROL & SAFEGUARGING
C & A
FIRE, SMOKE & GAS DETECTION
MECHANICAL
e.g. UTILITY
REQUIREMENT
1. INCORPORATED & REVISE IF IN AGREEMENT
2. DISCUSS TO REMOVE IF NOT IN AGREEMENT
PREPARE DISCIPLINE CHECKLIST WITH “AFD” REVISION
YES
NO
ISSUE TO CLIENT AS “APPROVED FOR DESIGN” (AFD)
NO
1. BACK CHECK
2. “SDC”
COMMENTS
ISSUED FOR “IDC” IN FOLLOWING SEQUENCE
1. PIPING
2. C&A
3. MECHANICAL
4. ELECTRICAL
5. CIVIL
6. PIPELINE (IF APPLICABLE)
7. PROJECTS
COMMENTS
YES
REVISE TO INCORPORATE