收藏 分销(赏)

英文采购合同 .doc

上传人:pc****0 文档编号:6864396 上传时间:2024-12-22 格式:DOC 页数:5 大小:30.50KB
下载 相关 举报
英文采购合同 .doc_第1页
第1页 / 共5页
英文采购合同 .doc_第2页
第2页 / 共5页
英文采购合同 .doc_第3页
第3页 / 共5页
英文采购合同 .doc_第4页
第4页 / 共5页
英文采购合同 .doc_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、此资料由网络收集而来,如有侵权请告知上传者立即删除。资料共分享,我们负责传递知识。英文采购合同Contract No.:XXXSales and Purchase ContractFORManganese OreThis contract is made and entered into onXX, Feb2019under terms and conditions as per the international chamber of commerce-600 (ICC UCP-600/2019 revision) by and between:The Buyer:Address:Tel:T

2、he Seller :Address:Tel:Whereby seller agrees to sell to buyer and Buyer agrees to buy from seller Manganese Ore under following the terms and conditions stipulated below:Article 1 CommodityConcentrated manganese OreArticle 2 SpecificationsConcentrated Manganese OreSize: 0-5mm (90% min)% Mn min. 40.0

3、% Fe max. 15.0% Silica ( SiO2 ) max. 1.0% Aluminum ( Al ) max. 4.0% S max. 0.20% P max. 0.10%Moisture max. 7%Article 3 Quantity:500 MT, partial shipment not allowed.Article 4 Origin and Port of loading4.1 Republic of ABC4.2 Loading port:Article 5 Packing/Delivery5.1 In50 kg sack5.2 Incontainer Shipm

4、ent, more or less 20 tons.Article 6 Shipment/Delivery6.1 500MT(+/-5%)partial shipment not allowed6.2 Shipment will be 90 days after signing of this contract and after the acceptance of the Letter of Credit by sellers bank. L/C will be openedafter BuyerreceivingProforma Invoice from Sellerwith confir

5、mation of the delivery schedule.6.3 The Buyer has the right to appoint the independent surveyor or his representative to conduct the Pre-shipment Inspection and/or conduct the joint-inspection of the material with buyer for his own account.Article 7 Contracted Price and ValuesPrice:Mn: 48% and above

6、 - USD0.00/%/DMTCFRCY Port, China40% - 47.9% - USD 0.00 /%/DMTCFRCY Port, ChinaThe Mn content will be average of the joint-inspection testing result at loading port.Article 8 Payment8.1 Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hon

7、g Kong or Singapore, 100% at sight upon presentation of shipping documents.A. Sellers Banking Details:Bank Name : Bank Address : Account Name : S.W.I.F.T. CODE SWIFT :B. Buyers bank issues L/C to the Sellers bank via S.W.I.F.T. wire transfer.Buyers Banking Details:Bank Name : (will be advised)Bank A

8、ddress : Account Name: S.W.I.F.T. Address SWIFT : Article 10 Inspection of Analysis & WeightThe shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (i.e.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading

9、 to container. While final weightand qualitydetermination shall be done atloadingportby the above joint-survey.Moisture content shall be deducted from the total weight shipped.Article 11 DocumentsSeller shall present the following documents to the buyer:A. Signed Commercial Invoice for 100% of the t

10、otal cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.B. Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.C. Certificate of Origin issued by ABC Department Of T

11、rade or concerned Government authorities, I original and 2 copies.D. Weight List, showing total weight , 1 original and 3 copies.E. Bill of Lading, 3 original copies and 3 non-negotiable copies.Article 12 Force MajeureThe Seller shall not be responsible for the delay of shipment or non-delivery of t

12、he goods due to Force Majeureunder UCP 600. The seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce

13、 under whose jurisdiction the accident occurs as evidence thereof. Under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In case the accident lasts for more than 60 days the buyer shall have the right to cancel t

14、he Contract.Article 13 ArbitrationAll disputes arising out of or in connection with this Contract shall be finally resolved by arbitration in accordance with the Rules of Arbitration of the International Chamber of Commerce (UCP-600/2019 or Uniform Customs and Practice for Documentary Credits) by one or more arbitrators appointed in accordance with the said rules. The arbitration shall be conducted in ABCbythe English language.Buyer Seller(Authorized signature/seal) (Authorized signature/seal)5

展开阅读全文
部分上传会员的收益排行 01、路***(¥15400+),02、曲****(¥15300+),
03、wei****016(¥13200+),04、大***流(¥12600+),
05、Fis****915(¥4200+),06、h****i(¥4100+),
07、Q**(¥3400+),08、自******点(¥2400+),
09、h*****x(¥1400+),10、c****e(¥1100+),
11、be*****ha(¥800+),12、13********8(¥800+)。
相似文档                                   自信AI助手自信AI助手
搜索标签

当前位置:首页 > 应用文书 > 其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服