资源描述
高等教育自学考试工程造价管理专业
综合课程设计
设计报告
设计报告题目: 某单位招待室
姓 名:
学 号:
班 级:
第一部分 目录····················································1
第二部分 造价书····················································2
总说明···············································································2
单项工程费用汇总表·······························································4
单位工程费用汇总表·······························································5
分部工程清单项目费用汇总表····················································6
措施项目清单计价表·······························································9
分部分项工程工程量清单分析表·················································10
措施项目费用分析表······························································16
主要材料标价表····································································17
第三部分 附录·························································19
工程量计算书······································································19
第四部分 附图·························································24
设计施工图·········································································24
第二部分 造价书
总说明
工程名称:某单位招待室
1、工程概况:施工地点为某单位院内,建设规模:51.56m2;砖混结构;其他须说明事项:
①施工现场实际情况:施工用水源、电源已接至施工现场,施工道路利用原道路作硬化处理,施工区域内的障碍物已拆除,施工场地较为平整,施工条件较好。;
②交通运输情况:本工程位于沙坪坝区,交通便捷,运输工程材料可直接从城市主干道进入到施工现场内的临时道路。;
③自然地理条件:工程地形平坦
④环境保护要求:由于是在城区施工,必须遵守各级政府的有关环境保护的规定,材料车辆的进场时间,施工占到问题及噪声控制、污水排放、封闭施工等方面必须遵照相关规定实施。;
⑤其他未尽事宜:合同条款执行中华人民共和国建设部、国家工商行政管理局 GF-2008-0201《建设工程施工合同(示范文本)》。;
2、清单编制依据:依据施工图纸及建设工程工程量清单计价规范,《全国统一建筑工程基础定额-江西省消耗量定额》,材料价格编制结合目前市场价执行。
3、工程招标范围:土建、装饰工程由分包单位施工;
4、对工程质量、材料、施工等的特殊要求:确保本工程质量;
5、招标人自行采购材料明细:;
6、其他需说明的问题:① 本预算费按核定的土建四类工程标准计取各项费用 ② 费用项目只考虑常见费用项目 ③ 劳动保险费已计入本预算。
投标总价
工程名称:接待室建筑装饰工程 表一
建设单位:某单位
工程名称:单位接待室
投标总价(小写):58066.26元
(大写):伍万捌仟陆拾陆元贰角陆分
投 标 人:××建筑公司 (单位签字盖章)
法定代表人:××× (签字盖章)
编 制时 间:2013年11月10日
单项工程汇总表
工程名称:接待室建筑装饰工程
表二
序 号
单 项 工 程 名 称
金 额 (元)
1
建筑工程
32067.79
2
装饰装修工程
25998.47
合 计 (结转至工程项目总价表)
58066.26
单 位 工 程 费 汇 总 表
工程名称:接待室建筑装饰工程
表三
序 号
单 位 工 程 名 称
金 额(元)
一
分部分项工程量清单计价合计
36984.94
1
建筑工程部分
16745.30
1.1
土石方工程
2360.5
1.2
砌筑工程
7675.56
1.3
混凝土及钢筋混凝土工程
4822.99
1.4
屋面及防水工程
1886.25
2
装饰装修工程部分
20239.64
2.1
楼地面工程
5881.23
2.2
墙、柱面工程
3505.38
1.3
天棚工程
438.53
1.4
门窗工程
9289.86
1.5
油漆、涂料、裱糊工程
1187.64
二
措施项目清单计价合计
4392.27
三
其他项目清单计价合计
14338.8
四
规费
工程排污费(1)×1%
169.85
定额管理费(1+2+3)×0.14%
78
五
税金(1+2+3+4+5) ×3.40%
1902.4
合 计 (转结至单项工程费汇总表)
58066.26
分部分项工程量清单计价表
工程名称:接待室建筑工程 表四
序号
项目编码
项目名称
计量单位
工程数量
金额(元)
综合单价
合价
A.1土方工程
1
010101001001
人工平整场地
m2
51.56
2.34
125.29
2
010101003001
人工挖基础土方(墙基)
m3
34.18
30.48
1041.81
3
010101003002
人工挖基础土方(柱基)
m3
0.77
55.88
43.03
4
010103001001
人工(墙基、柱基)基础回填土
m3
16.70
57.71
963.76
5
010103001002
人工室内回填土
m3
8.11
23.01
186.61
A.3砌筑工程
6
010301001001
M5水泥砂浆砌筑基础
m3
15.08
233.24
3517.26
7
010302001001
M5混合砂浆砌砖墙
m3
24.91
165.57
4124.35
8
010302005001
M5混合砂浆砌砖柱
m3
0.19
178.71
33.95
A.4混凝土及钢筋混凝土工程
9
010403002001
现浇C20混凝土矩形梁
m3
0.36
226.93
81.69
10
010403004001
现浇C20混凝土圈梁
m3
1.26
251.72
317.17
11
010407002001
混凝土散水
m2
22.63
27.19
615.31
12
010407002001
预应力C30混凝土空心板
m3
3.86
617.45
2383.36
13
010416001001
现浇构件钢筋
t
0.172
4310.54
741.41
14
010416005001
先张法预应力钢筋
t
0.134
5104.87
684.05
本页小计
14859.05
A.7屋面及防水工程
15
010702003001
屋面刚性防水
m2
55.08
55.08
3.79
16
010703003001
砖基础防潮层
m2
8.87
8.87
9.04
本页小计
1886.25
合计
16745.30
工程名称:接待室装饰工程 表五
序号
项目编码
项目名称
计量单位
工程数量
金额(元)
综合单价
合价
B.1楼地面
1
210102002001
块料地面面层
m2
42.69
109.37
4669.01
2
020105003001
块料踢脚线
m2
6.54
122.19
799.12
3
020108004001
现浇水磨石台阶面
m2
2.82
146.49
413.10
B.2墙、柱面工程
4
020201001001
混合砂浆抹内墙面
m2
137.92
9.29
1281.28
5
020201001002
外墙面水刷石
m2
85.79
23.72
2034.04
6
020202002001
柱面水刷石
m2
3.17
27.21
86.26
7
020203002001
梁面水刷石
m2
3.75
27.44
102.90
B.3天棚工程
8
020301001001
混合砂浆抹天棚
m2
46.21
9.49
438.53
B.4门窗工程
9
020401004001
实木装饰门
樘
4
975.37
3901.48
10
020401004001
塑钢窗C-1
樘
6
709.61
4257.66
11
020406007001
塑钢窗C-2
樘
1
565.36
565.36
12
020406007001
塑钢窗C-2
樘
1
565.36
565.36
B.5油漆、涂料工程
13
020507001002
内墙面、天棚面乳胶漆
m2
184.13
6.45
1187.64
本页小计
20239.64
合计
20239.64
措施项目清单计价
工程名称:建筑工程 表六
序号
单位工程名称
金额(元)
1
模板使用费
3497.49
2
脚手架使用费
894.78
合计
4392.27
分部分项工程量清单综合单价分析表
工程名称:接待室建筑工程 表七
序号
项目编码
项目名称
工程内容
综合单价组成
综合单价
人工费
材料费
机械使用费
管理费
利润
小计
1
010101001001
人工平整场地
人工平整场地
土壤类别:三类土
0.99
0.10
0.09
1.18
2.36
运土方
弃土运距:5km
0.25
0.73
0.10
0.08
1.16
2
010101003001
人工挖基础土方︵墙基︶
人工挖基础土方(墙基)
土壤类别:三类土
基础类型:带型标准砖
放脚墙基础
垫层底宽:800mm
挖土深度:1.20m
10.87
1.09
0.96
12.92
30.48
运土方
弃土运距:5km
3.79
10.99
1.48
1.30
17.56
3
010101003002
人工挖基础土方︵柱基︶
人工挖基础土方(柱基)
土壤类别:三类土
基础类型:独立标准砖
放脚柱基础
垫层底宽:800mm
底面积:0.64m2
挖土深度:1.20m
19.53
1.95
1.72
23.20
55.88
运土方
弃土运距:5km
6.86
20.65
2.75
2.42
32.68
4
010103001001
人工︵墙基柱基︶基础回填土
人工(墙基、柱基)基础回填土
土质要求:含砾石粉质粘土
密实度要求:密实
粒径要求:10~40mm砾石
夯填:分层夯填
运输距离:5km
9.43
39.14
4.86
4.28
57.71
57.71
5
010103001002
人工室内回填土
人工室内回填土土质要求:含砾石粉质黏土
密实度要求:密实
粒径要求:10~40mm砾石
夯填;分层夯填
运输距离;5km
3.77
15.60
1.94
1.70
23.01
23.01
6
010301001001
M5混合砂浆砌砖墙
M5水泥砂浆砌砖基础
砖品种、规格、强度:MU10标砖
基础类型;带型基础深度1.20m
27.40
103.33
0.61
13.13
11.56
156.03
233.24
垫层及厚度;C20混凝土,200厚
11.11
52.70
1.18
6.50
5.72
77.21
7
010302001001
M5混合砂浆砌砖墙
M5混合砂浆砌砖墙
砖品种、规格、强度:MU7.5标砖
墙体类型;实砌标准砖墙
墙体厚度;240mm
墙体高度;3.60m
37.00
102.31
0.06
13.94
12.26
165.57
165.57
8
010302005001
M5混合砂浆砌砖柱
M5混合砂浆砌砖柱
砖品种、规格、强度:MU7.5标砖
柱类型;标准砖柱
柱截面:240mm×240mm
柱高:3.30m
45.27
104.58
0.58
15.04
13.24
178.71
178.71
9
010403002001
现浇C20混凝土矩形梁
现浇C20混凝土矩形梁
梁底标高:3.30m
梁截面240mm×300mm
拌合料要求:中砂,5~20砾石
39.44
151.58
19.10
16.80
226.93
226.93
10
010403004001
现浇C20混凝土圈梁
现浇C20混凝土圈梁
梁底标高:2.40m
梁截面;180mm×240mm
拌合料要求:中砂,5~20砾石
52.86
154.24
4.78
21.19
18.65
251.72
251.72
11
010407002001
混凝土散水
混凝土散水
垫层材料:素土夯实
散水厚度:60mm
混凝土强度等级:C10
混凝土拌合料:中砂,5~20砾石
3.60
9.80
0.35
1.38
1.21
16.34
27.19
填塞材料:沥青砂浆
2.32
6.82
0.91
0.80
10.85
12
010412002001
预应力C30混凝土空心板
预应力C30混凝土空心板
构件尺寸:3900mm×600mm
混凝土拌合料:中砂,5~20砾石
接头灌浆:C20细石混凝土
55.03
214.55
15.42
28.50
25.08
338.58
617.45
构件运距:8km
15.60
9.94
62.39
8.79
7,。74
104.46
安装高度:3.60m
50.41
44.14
52.26
14.68
12.92
174.41
13
010416001001
现浇构件钢筋
现浇构件钢筋
钢筋种类、规格HPB235Φ12
81.40
801.51
5.64
88.86
78.19
1055.60
4310.54
HPB235Φ6.5
123.26
2146.80
43.90
231.40
203.63
2748.99
HRB235Φ14
19.77
359.48
6.63
38.59
33.96
458.43
钢筋运距:2km
40.00
4.00
3.52
47.52
14
010416005001
先张法预应力钢筋
先张法预应力钢筋
钢筋种类、规格:CRB650Φ4
358.21
3816.64
71.42
424.63
373.67
5044.59
5104.87
钢筋运距:2km
50.75
5.08
4.47
60.30
15
010702003001
屋面刚性防水
屋面刚性防水
屋面混凝土强度等级:C20
混凝土厚度:40mm
2.84
8.72
0.21
1.18
1.04
13.99
32.79
找平层及厚度:1:2水泥砂浆30mm厚
3.88
4.49
0.05
0.84
0.75
10.00
防水砂浆剂厚度:1:2水泥砂浆20mm厚
外加剂6%防水剂
2.08
5.29
0.04
0.74
0.65
8.80
16
010703003001
砖基础防潮层
砖基础防潮层
部位:砖基础、砖柱
厚度:20mm
砂浆配合比:1:2水泥砂浆
外加剂:6%防水粉
2.07
5.30
0.24
0.76
0.67
9.04
9.04
工程名称:接待室装饰工程 表八
序号
项目编码
项目名称
工程内容
综合单价组成
综合单价
人工费
材料费
机械使用费
管理费
利润
小计
1
020102002001
块料地面面层
面层:三元牌400×400奶油色地砖
结合层及厚度:1:2水泥砂浆20mm厚
9.86
69.42
0.81
8.10
7.05
95.15
109.37
垫层及厚度:C10混凝土,800厚
2.30
9.42
0.25
1.20
1.05
14.22
2
020105003001
块料踢脚线
踢脚线高度:150mm
砂浆配合比;1:2水泥砂浆20mm厚
粘结层厚度、材料种类:
面层:三元牌150×300
奶油色踢脚砖
18.05
84.06
0.74
10.29
9.05
122.19
122.19
3
020108004001
现浇水磨石台阶面
基层:素土基层,C20混凝土台阶
面层:1:2水泥白石子浆15mm厚
石子:方解石,白色
50.99
62.52
3.79
11.73
10.32
139.35
146.49
磨光、打蜡要求:普通
5.39
0.62
0.60
0.53
7.14
4
020201001001
混合砂浆抹内墙面
墙体类型:标准砖墙
底层、配合比:1:0.3:3混合砂浆18厚
面层、配合比:1:0.3:3混合砂浆8厚
3.80
3.96
0.06
0.78
0.69
9.29
9.29
5
020201001002
外墙面水刷石
墙体类型:标准砖墙
底层、配合比:1:2.5水泥砂浆15厚
面层、配合比:1:2水泥白石子浆10厚
10.20
9.68
0.08
2.00
1.76
23.72
23.72
6
020202002001
柱面水刷石
柱体类型:标准砖墙
底层、配合比:1:2.5水泥砂浆15厚
面层、配合比:1:2水泥白石子浆10厚
13.00
9.82
0.08
2.29
2.02
27.21
27.21
7
020203002001
梁面水刷石
梁类型:混凝土矩形梁
底层、配合比:1:2.5水泥砂浆15厚
面层、配合比:1:2水泥白石子浆10厚
13.01
10.01
0.08
2.31
2.03
27.44
27.44
8
020301001001
混合砂浆抹天棚
基层类型:预制空心板
底层、配合比:1:0.3:3水泥砂浆12厚
面层、配合比:1:0.3水泥白石子浆5厚
4.30
3.64
0.05
0.80
0.70
9.49
9.49
9
020401004001
实木装饰门
实木装饰门安装
单樘面积:2.16
面层材料:三利牌棕色胡桃木面胶合板
108
526
63.40
55.79
753.19
975.37
门框安装,截面:90mm×45mm
7.13
56.46
1.84
6.54
5.76
77.73
木门聚酯漆
21.06
100.53
12.16
10.70
144.45
10
020406007001
塑钢窗C-1
窗类型:推拉窗
框扇材质:塑钢(浅色)
外围尺寸:1460×1460
玻璃品种、厚度:浮法玻璃,3mm厚
31.20
562
4.12
59.73
52.56
709.61
709.61
11
020406007002
塑钢窗C-2
窗类型:推拉窗
框扇材质:塑钢(浅色)
外围尺寸:1060×1460
玻璃品种、厚度:浮法玻璃,3mm厚
22.80
450
3.09
47.59
41.88
565.36
565.36
12
020507001002
内墙面、天棚涂乳胶漆
内墙面、天棚面乳胶漆
基层类型:混合砂浆
涂料品种及刷喷遍数:三箭牌乳胶漆二遍
1.12
1.85
0.30
0.26
3.53
6.45
墙面石膏腻子满刮二遍
0.87
1.03
0.19
0.17
2.26
天棚石膏腻子满刮二遍
0.32
0.23
0.06
0.05
0.66
措施项目费用分析表
工程名称:建筑工程 表九
序号
措施项目名称
单位
数量
金额(元)
人工费
材料费
机械使用费
管理费
利润
小计
1
模板使用费
项
1
215.00
2360.00
369.00
294.40
259.07
3497.49
2
脚手架使用费
m2
108.60
163.00
544.13
46.05
75.32
66.28
894.78
合计
4392.27
主要材料标价表
工程名称:建筑工程 表十
序号
材料编码
材料名称
单位
单价(元)
1
乳胶漆
kg
6.00
2
地砖400×400
m2
65.00
3
踢脚砖150×300
m3
80.00
4
成品实木门900×2400
樘
500.00
5
塑钢推拉窗1500×1500
樘
562.00
6
塑钢推拉门1100×1500
樘
450.00
7
425水泥
kg
0.30
8
中砂
m3
30.00
9
水
m3
0.90
10
5~40砾石
m3
35.00
11
白石子
kg
0.3
12
草酸
kg
5.00
13
硬白蜡
kg
4.00
14
煤油
kg
2.00
15
标准砖
块
0.15
16
滑石粉
kg
0.25
17
腻子胶
kg
4.50
18
白水泥
kg
0.50
19
冷底子油
kg
2.11
20
冷拉刻痕钢筋
t
3300
21
钢筋
t
4320
22
钢筋Φ10以内
kg
2.6
23
组合钢模板
kg
3.5
24
钢拉模
kg
3.5
25
支撑钢管及扣件
kg
2.9
26
梁卡具
kg
3.5
27
零星卡具
kg
3.5
28
钢套管
kg
2.9
29
钢管Φ48×3.5
kg
2.9
30
圆钉
kg
4.73
31
抓钉
个
0.5
32
木螺丝4×30
百个
2
33
镀锌铁丝8#
kg
4.7
34
镀锌铁丝14#
kg
4.91
35
镀锌铁丝22#
kg
5.5
36
钢丝绳
kg
5
37
电焊条
kg
6.338
38
底座
个
5.1539
39
直角扣件
个
5.2540
40
对接扣件
个
5.2541
41
回转扣件
个
5.1542
42
防锈漆
kg
13.9643
第三部分 附录
工程量计算书
工程名称:建筑工程 表十一
序号
项目编码
项目名称
单位
工程数量
计算式
1
010101001001
主项
人工平整场地
m2
127.88
人工平整场地:
S=(5.24+9.84)×2+51.56+16
=127.88(m2)
经计算场地余土外运:5.71m3
包含内容
余土外运
m3
5.71
2
010101003001
主项
人工挖(墙)基础土方
m3
57.79
墙基础土方,工作面宽300mm,不放坡
V=[(5.0+9.6)×2+﹙5.0-0.8-0.3×2﹚+﹙3.0-0.8-0.3×2﹚] ×﹙0.80+0.30×2﹚×﹙1.50-0.30﹚
=57.79﹙m3﹚
土方外运:57.79m3
包含内容
土方外运,运距5km
m3
57.79
3
010101003001
主项
人工挖(柱)基础土方
m3
2.35
工作面300mm,不放坡
V=﹙0.8+0.30×2﹚×﹙0.80+0.30×2﹚×﹙0.80+0.30×2﹚×1.20
=2.35﹙m3﹚
土方外运:2.35m3
包含内容
土方外运,运距5km
m3
2.35
4
010301001001
主项
M5水泥砂浆,砌砖基础
m3
15.08
C20混凝土基础垫层
V= [﹙5.0+9.6﹚×2+﹙5.0-0.8+3.0-0.8﹚] ×0.80×0.20+0.80×0.80×0.20
=5.82﹙m3﹚
M5水泥砂浆砌砖基础
砖墙基础=﹙29.20+5.0-0.24+3.0-0.24﹚×[﹙1.50-0.20﹚×0.24+0.007875×12 ]
=14.93﹙m3﹚
砖柱基础= [﹙0.24+0.0625×4﹚×﹙0.24+0.0625×4﹚+﹙0.24+0.0625×2﹚×﹙0.24+0.0625×2﹚] ×0.126×2+﹙1.50-0.20-0.126×2﹚×0.24×0.24
=0.15﹙m3﹚
小计:14.93+0.15=15.08﹙m3﹚
包含内容
C20混凝土,基础垫层
m3
5.82
5
010103001001
主项
人工基础回填土
m3
41.90
V=挖方体积—室外地坪以下基础体积
=59.79+2.53-15.08+36.72×0.24×0.30+0.30×0.24×0.24-5.82﹙垫层﹚
=41.90﹙m3﹚
取土:41.90×1.49﹙虚方系数﹚=62.43﹙m3﹚
包含内容
取土距离:5km
m3
62.43
6
010103001002
主项
人工室内回填土
m3
8.11
V=主墙间净面积×回填厚度
=﹙建筑面积-墙、柱结构面积﹚×回填厚度
=﹙51.56-36.72×0.24-0.24×0.24﹚×﹙0.30-0.08-0.02-0.01﹚
=8.11﹙m3﹚
取土:8.11m3×1.49﹙虚方系数﹚=12.08m3
包含内容
取土距离5km
m3
12.08
7
010302001001
主项
M5水泥砂浆砌砖墙
m3
24.91
V=﹙墙长×墙高-门窗面积﹚×墙厚-圈梁体积
=﹙36.72×3.60-0.9×2.40×4-1.50×1.50×6-1.10×1.50﹚×0.24-29.20×0.18×0.24
=24.91﹙m3﹚
包含内容
8
010302005001
主项
M5水泥砂浆砌砖柱
m3
0.19
V=柱断面×柱高
=0.24×0.274×3.30
=0.19﹙m3﹚
包含内容
9
010403002001
主项
现浇C20混凝土矩形梁
m3
0.36
V=梁长×梁断面
=﹙2.70+0.12+2.0+0.12﹚×0.24×0.30
=0.36﹙m3﹚
包含内容
10
010403004001
主项
现浇C20混凝土圈梁
m3
1.26
V=圈梁长×断面积
=29.20×0.18×0.24
=1.26﹙m3﹚
包含内容
11
010407002001
主项
混凝土散水
m2
22.63
S=散水长×散水宽-台阶面积
=﹙29.20+0.24×4﹚×0.80-﹙2.7-0.12+0.12+0.3+2.0-0.12+0.12﹚×0.30
=22.63﹙m2﹚
伸缩缝沥青砂浆:
墙根周长 ﹙5.0+0.24+0.30台阶+9.60+0.24+0.30台阶﹚×2=31.36﹙m﹚
四角 0.80×1.414×4角=4.52﹙m﹚
A、 B轴各加一道 0.80×2道=1.60﹙m﹚
小计:37.48﹙m﹚
包含内容
伸缩缝沥青砂浆
m
37.48
12
010412002001
主项
预应力C30混凝土空心板
m3
3.86
YKB3962 0.164×9=1.476﹙m3﹚
YKB3662 0.139×9=1.251﹙m3﹚
YKB3062 0.126×9=1.134﹙m3﹚
小计:3.86﹙m3﹚
制作:V=净用量×1.015=3.86×1.015=3.92﹙m3﹚
运输:V=净用量=3.86﹙m3﹚
安装、接头灌浆:V=净用量=3.86﹙m3﹚
包含内容
制作
运输
安装、接头灌浆
m3
3.92
3.86
3.86
13
010416001001
主项
现浇构件钢筋
t
圈梁:HPB235ø12 116.80×0.888=103.72﹙kg﹚
Ø6.5 122.64×0.26=31.89﹙kg﹚
矩形梁:HPB235 ø12 9.02kg
Ø6.5 8.70kg
HPB335ø14 18.41kg
小计:HPB235ø12 112.74kg
Ø6.5 40.59kg
HPB335ø14 18.41kg
钢筋运输:0.172t
包含内容
HPB235ø12
HPB235ø6.5
HPB335ø14
钢筋运输
t
t
t
t
0.113
0.041
0.018
0.172
14
010416005001
主项
先张法预应力钢筋
空心板钢筋:CRB650ø4
YKB3962 6.57×9=59.13﹙kg﹚
YKB3662 4.50×9=40.5﹙kg﹚
YKB3062 3.83×9=34.47﹙kg﹚
小计:134.10kg
钢筋运输:0.134t
包含内容
CRB650ø4
钢筋运输
t
t
0.134
0.134
15
010702003001
主项
屋面混凝土刚性防水层
m2
55.08
屋面C20混凝土
展开阅读全文