资源描述
to be cut off the power by electrician and make an appropriate processing juniors to go.
(Seven)Electricity, watertightness
(1)Change to go together with electricity inside have to establish to homologously insulate to extinguish fire a device, its the peripheral 15 m is inside the scope not
Must use clear fire or heap to place an oxygen bottle, fuel B Gui bottle waits easy Ran to explode a product, and to inside electricity circuit
Do periodical check, discover concealed suffer from whole change in time.
(2)Changing to go together with the building of the electricity and reaching architectural fire-proof grade doesn't must be lower than Ⅲ class.
(3)The electricity circuit should periodically check and put to fix to replace in time aging and damaged of circuit, use medium
Strictly forbid a super burden operation.
(4)Construction the spot, single dormitory, seasonal worker Peng all prohibits to use heater materials like electric stove,etc,
Illuminate a lamp bulb not to get is bigger than 100 Ws.
78
(5)The special place all uses a flameproof electric appliances, the switch all establishes outdoors, can not use
Zha knife switch.(Use closeness iron hull switch)
(6)Communicate the Han machine had to close the power while stopping using, its both ends' leading line to place was having already accumulated a thing and
On the combustible material.
79
Seven, "four new" technical application
Strongly the expansion applies building industry ten the industry new techniques are a great special feature of this engineerings, start construction in the engineering
Is medium, depend on an each item lately technical application, had the huge push the function towards raising engineering quality, take
Got better economic efficiency and social efficiency.This engineering totally applied a building industry ten new techniques in of
Is seven, make the following introduction of the applied circumstance of each new technique now:
(A)The spot agitation and pump send a concrete technique
This engineering on the spot establishes two sets of agitation stations equipments.Foundation and the corpus structure 11280 ms 3 concretes
All adoption pumps send a craft.The concrete Chan adds one UEA inflation 100 Ts, the WG commonness reduces water 20 ts,
The powder ash from stove 400 ts, the JB201 type efficiently pumps to send 24.64 ts.
(Two)Thick technique for keeping a reinforcing bar conjunction
In this engineering Shu to reinforcing bar φ 16 above and all adopt to give or get an electric shock residue pressure Han, corpus structure totally adoption electricity residue
The pressure welds a head 29124, application electricity residue the pressure weld the colligation of head and tradition to deal with contact to compare, each
Dealing with contact can economize cost 6.5 dollars and deal with contact a calculation by this engineering 29124 and produce directly economic efficiency
18.910000 dollars.
(Three)The new template applies a technique
The template mainly adopts nine plank and bamboo gum plank of matchings, the amount is a 20000 ms 2.
(Four)Construct economy energy and new wall body applied technique
The piping heat preservation adopts rubber and plastic material.The engineering frame fills a wall to mainly adopt clay to burn to knot many bore bricks,
The mansion totally burns and knots many bore bricks 450,000 pieces with the clay.
80
(Five)New building watertightness and plastics take care of an applied technique
Totally use waterproof book material 6000 ms of 3 dollars B C 2, the UPVC catchment plastics takes care of a 3280 ms, U-PVC
Add Jin catchment the plastics take care of a 350 ms, the underground outdoor wall, toilet and Yan ditch adopts 858 colorful Gao members to defend
Water coating watertightness.
(Six)The steel structure net applies a technique
The adoption steel net of this engineering hall crest, net the adoption stud bolt ball node, order to prop up a form more for the new moon
Type.Net area 5.9 ×s 22.7=133.93 mses 2, the house front-panel adoption aluminum metal alloy main beam of boat, 5+5 clip gum glass
Crest Peng.
(Seven)The calculator applies a technique
This item department costs in the engineering and start construction the organization design draw up, construction progress network plan, design
Diagram paper the spot CAD put aspects like kind,etc to actively apply a calculator technique and carried out an item management of information-based,
Standardize to turn with norm.
81
Eight, the safe construction promise measure
The item manager serves as a senior clerk, from each professional work long, class senior clerk and particularly, part-time the safety produce check
The member constitutes a construction the spot safe production control group.The item establishes a full-time safe member 1, have power because of safety
The problem orders parts of item lockouts of some cents to restructure safety, each construction class senior clerk part-time safety check inspector.
(A)Establish safe production control system and build up a sound safety to produce to promise system
Figure 8-1 safeties promise system frame diagram
(1)The performance safety hands over bottom system.Construction homework front, from the work grow be written Anne toward the construction class set
All hand over bottom, the construction class senior clerk signs, and operate a personnel to hand over bottom to the all in time.
(2)Before carrying out a construction safety check system.Each set before starting construction to the part started construction, enter
Go a safety check, discover concealed suffer from, with relevant after personnel handle solution, the square can carry on construction to operate.
(3)Strengthen safe consciousness education to the worker, raise ego protection consciousness, last before the Gang rightness
The officers and workers carries on x-rated safety production education, hereafter periodical with not and with regularity carry on safety production education, add
The strong safety produces, civilization construction of consciousness.
(4)Build up the safety production responsibility system.Periodical organization safety production big check, and build up a safety to living
Item safe member
Produce the system machine power system body the safe Jian press the system workplace to defend system
The soil sets up engineering
The public order is comprehensive to manage
The hygiene manages
The safety inspects
Install engineering
The machine manages
Use an electricity management at the time
Safe technique control
The field permits a looks
82
展开阅读全文