1. 本工程应执行的标准、规范
Applicable Codes and Standards 3
2. 本工程质量控制点
Quality Control Point 5
3. 本工程质量控制表格、交工资料表格及质量评定表格目录
Applicable forms for quality control, turnover document, and quality evaluation 13
1. 本工程应执行的标准、规范 Applicable Codes and Standards
z 监理规范 Code on Supervision:
GB 50319-2000《建设工程监理规范》
Code on Supervision of Construction Project, GB50319—2000
z 交工技术文件规定 Regulation on Technical Turnover Document:
SH 3503-2001《石油化工工程建设交工技术文件规定》
Regulation of Technical Turnover Document for Construction of Petrochemical Industry Project, SH3503—2001
GB/T 50328-2001《建设工程文件归档管理规范》
Regulation on Documentation and Filing up for Construction Project, GB/T 50328-2001
GB/T 50326-2001《建设工程项目管理规范》
Code on Project Management of Engineering Construction, GB/T 50326-2001
z 技术规范 Technical Codes and Standards:
GB 50202-2002《建筑地基基础工程施工质量验收规范》
Code on Construction Quality and Acceptance Inspection of Building Foundation Work, GB50202-2002
SH 3510-2000《石油化工设备砼基础工程施工及验收规范》
Code on Construction Quality & Acceptance Inspection of Reinforced Concrete Foundation of Petrochemical Equipment, SH 3510-2000
GBJ 120-1999《建筑基坑支护技术规程》
Specification on Technology of Building Foundation Pit Shoring, GBJ 120-1999
GB 50330-2002《建筑边坡工程技术规范》
Code on Technology of Side Slope Work of Building Construction, GB 50330-2002
GBJ 79-2002《建筑地基处理技术规范》
Code on Foundation Treatment Technology of Building Construction, GBJ 79-2002
GB 50204-2002《砼结构工程施工质量验收规范》
Code on Quality Acceptance Inspection of Reinforced Concrete Structure Construction, GB 50204-2002
JGJ 55-2000《普通砼配合比设计规程》
Specification on Engineering of Mixing Proportion of Ordinary Concrete, JGJ 55-2000
JGJ 52-1992《普通砼用砂质量标准及检验方法》
Standard on Quality & Inspection Method of Sand Application in Ordinary Concrete, JGJ 52-1992
JGJ 94—94《建筑桩基技术规范》
JGJ 94—94 Technical Code of Building Foundation Piles
GBJT 08-92-2000《先张法预应力砼管桩》
GBJT 08-92-2000《Pre-stressed Concrete Pipe Piles》
97G361《方桩标准图集》
97G361《Square Pile Standard Collective Drawing》
JGJ 53-1992《普通砼用碎石和卵石质量标准及检验方法》
Standard on Quality & Inspection Method of Gravel and Pebble Application in Ordinary Concrete, JGJ 53-1992
GBJ 119-1988《砼外加剂应用技术规范》
Code on Technical Application of Reinforced Concrete Additives, GBJ 119-1988
GB 50300—2001 《建筑工程施工质量验收统一标准》
GB 50300—2001 《Building Engineering Construction Quality Acceptance Uniform Standard》
z 砼预制桩、PHC 桩、灌注桩及基础设计文件及图纸资料
Reinforced Concrete Prefabricated Piles, PHC Piles, Grouting Piles and Foundation Design Document as well as Drawing Document
2. 本工程质量控制点 Quality Control Point
序号
质量控制点
控制内容
控制方法
等级
参 加 单 位
控制表格
验收表格
评定表格
总承 包商
监
理
MWP
业
主
政府 部门
1
定位测量
复核测量结果
仪器实测
A
X
X
X
X
SH3503-2001-J202
GB50026-93
2
土方开挖
基坑、边坡
实测
C
X
GB50202-2002-010101
3
基坑支护
支护、堆载、排水
C
X
GB50330-2002
JGJ120-99
4
地基处理
主控项目 1~3
密实度、承载力
取样、试验³10%。不少于 3 点 见
4.1.5, 4.1.6
B
X
X
X
GB50202-2002-
010301~010304
JGJ 79-2002
5
地基验槽
主控项目 1~3 持力层、标高、平 面尺寸
实测、钎探记录
A
X
X
X
X
SH3503-2001-J201
GB50202-2002
6
预制桩(含 PHC 桩)
主控项目 1~3 桩位偏差 承载力 钢筋骨架质量 成品桩质量
实测、承载力报告 桩位偏差 见 5.1.3 承载力 见 5.1.5
钢筋骨架质量 抽查数量不少于总
数的 20%且不少于10 根见5.1.6 成品桩质量 抽查数量不少于总数 的 20%且不少于 10 根 见 5.1.6
抽样 0.5%~1%. 不少于 3 根(处)
见 4.1.6, 5.1.5, 5.1.6
B
X
X
X
GB50202-2002-010403
7
打、接桩
焊缝质量 上下节平面偏差 节点弯曲矢高
间歇时间、桩垂直度、最终贯入度
实测
C
X
GB50202-2002-010403
8
打桩完毕
主控项目 1~3
1.桩顶标高
2.桩位、垂直度偏差
3.承载力检验、桩身完整性检验
实测、试验
其中 1 和 2 应Ê20%且不少于10
根,见 5.1.6
3 应³10%且大于等于 3 根。当桩 数小于 50 根时,应不少于 2 根。 见 5.1.6, 5.1.5
B
X
X
X
GB50202-2002-010403
9
灌注桩
(灌注前)
主控项目 1~2
桩位、孔深
试验报告、实测
1.桩位 不少于 30%且不应少于 20
根 见 5.1.5
2.孔深 孔深应全部检查 见 5.1.8
B
X
X
GB50202-2002-010405
10
灌注桩
(灌注中)
主控项目 1~5 成孔、清孔质量 钢筋笼安装深度 砼充盈系数、桩径、垂直度
实测
1.桩位 不少于 30%且不应少于 20
根 见 5.1.5
2.孔深 孔深应全部检查 见 5.1.8
C
X
GB50202-2000-010405
11
灌注桩
(灌注后)
桩顶标高、锚固钢筋 桩位、垂直度偏差 承载力检验、桩身完整性检验
实测、试验
1.桩位 不少于 30%且不应少于 20
根 见 5.1.5
2.孔深 孔深应全部检查 见 5.1.8
C
X
GB50202-2002-010405
12
桩承台
主控项目 1~4 轴线位置、 平面尺寸、标高、 钢筋规格、数量、位置
试验
实测 抽查构件数量的 10%,且不少于3 件,见 5.5.2
B
X
X
X
GB50204-2002-010603、010604
13
设备基础
主控项目 1~4 轴线、方位、标高、 预留孔洞或螺栓、 预埋件
试验全数检查 见 8.3.1
实测全数检查 见 8.3.2
B
X
X
X
GB50204-2002-010603、010604
SH3510-2000---3.3.11-1
14
模板工程
几何尺寸、支护稳定
实测
C
X
GB50204-2002-010601
15
钢筋工程
主控项目 1~3
原材检验 品种、级别、规格、数量
见证取样应取样数量的 30%
复试报告
实测 全数检查,观察,钢尺检查 见 5.2.4, 5.5.1
B
X
X
X
GB50204-2002-010602
SH3510-2000---3.2.9 、3.2.11
16
隐蔽工程
平面尺寸、标高、 预留空洞或螺栓、钢筋 品种、级别、规格、数量
实测
A
X
X
X
X
SH3503-2001---J115
GB 50204-2002
17
砼浇注前
原材检验报告 见 7.2.1 配合比试验报告,检查配合比设计资料见 7.3.3
见证取样³应取样数量的30% 试验报告,每周工作班检查 1 次实测
B
X
X
GB50204-2002
JGJ55-2000
JGJ 52-1992
JGJ 53-1992
GBJ 119-88
18
块体式 设备基础
主控项目 1~2 位置、平面尺寸、标高、 预留空洞或螺栓、钢筋
实测 全数检查 见 8.3.1, 8.3.2
B
X
X
X
SH3503-2001-J204
GB 50204-2002-020105
SH3510-2000 3.3.11-1
19
整体框架式 设备基础
主控项目 1~2 平面尺寸、垂直度、标高、 预留空洞或螺栓、钢筋
实测 全数检查 见 8.3.1, 8.3.2
B
X
X
X
SH3503-2001-J205
GB 50202-2002
GB 50204-2002-020105
SH3510-2000 3.3.11-2
20
储罐基础
主控项目 1~2 基础中心位置、标高偏差 直径偏差
实测 全数检查 见 8.3.1, 8.3.2
B
X
X
X
SH3503-2001---J206
SH3510-2000---3.3.11-1
GB50204--2002
21
球罐基础
主控项目 1~2 平面、方位、标高偏差 预留孔、螺栓偏差
实测 全数检查 见 8.3.1, 8.3.2
B
X
X
X
SH3503-2001---J207
SH3510-2000---3.3.11-1
GB50204--2002
22
大体积砼基础
水泥品种和用量 砼配合比和水灰比 散热管布置
试验报告、实测 全数检查 见
8.3.1, 8.3.2
B
X
X
X
SH3510-2000---3.3.11-1
23
预埋件、螺栓、套 管、孔洞
位置、埋深、锚固方式
实测
C
X
SH3510-2000---5.3.8
24
灌浆
接触面 孔洞清理 灌浆料强度
实际检查 试验报告
C
X
SH3510-2000
25
基础沉降观测
设备安装前、安装后、水压试验 中、单机试车后观测点沉降值
实测
C
X
SH3503-2001---J207
SH3510-2000
26
基础复测
位置、平面尺寸、标高、 预留空洞或螺栓、钢筋
实测 应抽查基础数量的 10%,且不少于3个,见 8.3.2
B
X
X
X
SH3503-2001---J203
GB50204--2002
27
土方回填
密实度
取样、试验 1000M2 以上,1 点
/100 M2;3000 M2 以上,1 点/300M2
C
X
GB50202-2002-010102
28
基础验收
外观检查 资料检查
A
X
X
X
X
No.
Quality Control Point
Control Content
Control Method
Grade
Party Involved
Applicable Forms
Contractor
Supervision Organization
MWP
Owner
Government Agency
1
Location survey
Checking survey result
Actual measurement by instrument
A
X
X
X
X
SH 3503-2001-J202
GB50026-93
2
Earthwork
Excavation
Foundation pit and side sloping
Actual measurement
C
X
GB50202-2002-010101
3
Foundation Pit Shoring and Protection
Shoring and protection, laydown and bearing, water drainage
C
X
GB50330-2002--- JGJ120-99
4
Ground Treatment
Main Control Item 1-3
Compactness, bearing capacity
Sampling, sampling test³10%, not less than 3
points, see 4.1.5, 4.1.6
B
X
X
X
GB50202-2002-010301
~010304
JGJ 79-2002
5
Ground Inspection
Main Control Item 1-3
Ground bearing course, elevation, plane dimension
Actual measurement, ground bearing capacity test record
A
X
X
X
X
SH3503-2001-J201
GB50202-2002
6
Pre-cast Piles
(PHC piles included)
Main Control Item 1-3
Pile position deviation, and Bearing capacity, Quality of reinforcement joist, Quality of pre-cast
pile
Actual measurement, Bearing capacity report, Pile position deviation see point 5.1.3;
Bearing capacity see 5.1.5;
Spot check quality of reinforcement joist, quantity of spot check is not less than 20% of total amount and not less than 10 pieces, see 5.1.6, the rate of spot check is 0.5%~1%. Not less than 3 pieces
(location), see 4.1.6, 5.1.5, 5.1.6
B
X
X
X
GB50202-2002-010403
7
Piling, Pile Extension Connection
Welds quality, Flatness deviation of joints, Bending Vector height of joints, interval time, pile verticality, final penetration
Actual measurement
C
X
GB50202-2002-010403
8
Piling Completion
Main Control Item 1-3
1. Elevation of pile top;
2. Pile position, verticality deviation;
3. Bearing capacity inspection, Completeness inspection of pile body
Actual measurement, Testing;
For point 1and 2, inspection rate shall be ³20%
and not less than 10 pieces, see 5.1.6;
For point 3, inspection rate shall be ≥ 10% and not less than 3 pieces. When quantity of the pile is less than 50 pieces, piles for inspection shall be not less than 2 pieces. See 5.1.6, 5.1.5
B
X
X
X
GB50202-2002-010403
9
Driven Cast- in- Place Pile
(Prior to pouring)
Main Control Item 1-2
Pile position; hole depth
Testing report, actual measurement;
1.Pile position, not less than 30% and not less than 20 pieces, see 5.1.5
2.Holes depth, all of them shall be checked. See
5.1.8
B
X
X
GB50202-2002-010405
10
Driven Cast- in- Place Pile
(During pouring)
Main Control Item 1-5
Quality of hole formation and hole cleaning; Installation depth of steel cages;
Concrete allowance coefficient, pile diameter
and verticality
Actual measurement
1.Pile position, not less than 30% and not less than 20 pieces, see 5.1.5
2.Holes depth, all of them shall be checked. See
5.1.8
C
X
GB50202-2000-010405
11
Driven Cast- in- Place Pile
(After pouring)
Main Control Item 1-5
Elevation of pile top, anchoring bar, pile position, verticality deviation, bearing capacity inspection, completeness inspection of pile body
Actual measurement, Testing
1.Pile position, not less than 30% and not less than 20 pieces, see 5.1.5
2.Holes depth, all of them shall be checked. See
5.1.8
C
X
GB50202-2002-010405
12
Pile Cap
Main Control Item 1-4
Position of axial, plane dimension, elevation, Rebar specification, quantity and position
Testing
Actual measurement, members for spot check are
10% and not less than 3 pieces, See 5.5.2
B
X
X
X
GB50204-2002-010603
、010604
13
Equipment foundation
Main Control Item 1-4
Axial line, orientation, elevation preserved holes, bolts and fittings, and
embedded parts
Testing, complete inspection. See 8.3.1
Actual measurement, total inspection. See 8.3.2
B
X
X
X
GB50204-2002-10603,
010604
SH3510-2000--3.3.11-1
14
Forming Work
Geometric dimension
Support stability
Actual measurement
C
X
GB50204-2002-010601
15
Rebar Work
Main Control Item 1-3
Raw material inspection, type, grade, specification, quantity
Sampling verification, sampling quantity is 30% of total;
Re-testing report;
Actual measurement, total inspection, observation, steel rule measuring. See 5.2.4, 5.5.1
B
X
X
X
GB50204-2002-010602
SH3510-2000---3.2.9,3.2.11
16
Concealed Work
Plane dimension, elevation, Built-in holes, bolts and rebar, type, grade, specification, quantity
Actual measurement
A
X
X
X
X
SH3503-2001-J115
GB 50204-2002
17
Prior to concrete pouring
Raw material inspection report, see 7.2.1
Mixing proposition testing report, Mix design data inspection
Sampling verification, sampling quantity is 30% of total;
Testing report, 1 time inspection for weekly shifts; Actual measurement
B
X
X
GB50204-2002
JGJ55-2000
JGJ 52-1992
JGJ 53-1992
GBJ 119-88
18
Massive Equipment
Foundation
Main Control Item 1-2
Position, plane dimension, elevation, preserved holes, bolts and rebar
Actual measurement, Total inspection see 8.3.1,
8.3.2
B
X
X
X
SH3503-2001-J204
GB 50202-2002-020105
SH3510-2000--3.3.11-1
19
Massive Frame Equipment Foundation
Main Control Item 1-2
Plane dimension, verticality, elevation, built-in holes, bolts and rebar
Actual measurement, Total inspection see 8.3.1,
8.3.2
B
X
X
X
SH3503-2001-J205
GB 50202-2002
GB 50204-2002-020105
SH3510-2000--3.3.11-2
20
Storage Tank
Foundation
Main Control Item 1-2
Plane, orientation, elevation deviation, preserved holes, bolts deviation
Actual measurement, Total inspection see 8.3.1,
8.3.2
B
X
X
X
SH3503-2001-J206
SH3510-2000--3.3.11-1
21
Spherical Tank
Foundation
Deviation in plane, orientation, elevation, deviation of built-in holes, bolts
Actual measurement, Total inspection see 8.3.1,
8.3.2
B
X
X
X
SH3503-2001-J207
SH3510-2000--3.3.11-1
GB 50204-2002
22
Mass Concrete
Foundation
Cement brand and quantity, mixing proportion and water-cement ratio, distribution of heat dissipation tubes
Testing report,
Actual measurement, Total inspection see 8.3.1,
8.3.2
B
X
X
X
SH3510-2000--3.3.11-1
23
Embedded parts, bolts, sleeves,
holes and openings
Position, embedded depth, anchoring mode
Actual measurement
C
X
SH3510-2000---5.3.8
24
Grouting
Contacting surface, holes cleaning, grouting material strength
Actual inspection
Testing report
C
X
SH3510-2000
25
Foundation Settlement Observation
Settlement value observation before and after equipment installation, during hydro test, after individual test run
Actual measurement
C
X
SH3503-2001-J207
SH3510-2000
26
Foundation Re- survey
Location, plane dimension, elevation, preserved holes, bolts and rebar
Actual measurement, quantity for spot check shall be 10% of total foundation and not less than 3 pieces, see 8.3.2
B
X
X
X
SH3503-2001-J203
GB 50204-2002
27
Earthwork Backfill
Compactness check
Sampling and sampling test.
For area 1000m2 above, 1 point/ 100 m2;
For area 3000 m2 above, 1 point/ 300 m2
C
X
GB50202-2002-010102
28
Foundation Acceptance Inspection
Visual inspection, document check
A
X
X
X
X
3. 本工程质量控制表格、交工资料表格及质量评定表格目录 Applicable forms for quality control, turnover document, and quality evaluation
SH3503-2001- J202 放线测量验收记录
Record of Setting Out and Survey Inspection & Acceptance, SH3503-2001- J202
GB50202-2002- 010101 土方开挖质量验收记录
Record of Earth Work Excavation Quality Inspection & Acceptance, GB50202-2002- 010101
GB50202-2002- 010102 土方回填质量验收记录
Record of Earth Work Backfill Quality Inspection & Acceptance, GB50202-2002- 010102
GB50202-2002-010301~010314 地基处理质量验收记录
Record of Ground Treatment Quality Inspection & Acceptance, GB50202-2002-010301~010314
GB50202-2002-010201~010207 基坑支护质量验收记录
Record of Foundation Pit Shoring Quality Inspection & Acceptance, GB50202-2002-010201~010207
SH35O3-2001- J201 地基验槽
Record of Ground Inspection, SH35O3-2001- J201
GB50204-2002-010602 钢筋工程质量验收记录
Record of Quality Inspection & Acceptance of Rebar Work, GB50204-2002-010602
GB50204-2002- 010601 模板工程质量验收记录
Record of Quality Inspection & Acceptance of Formwork, GB50204-2002- 010601
SH35O3-2001- J115 隐蔽工程质量验收记录
Record of Quality Inspection & Acceptance of Concealed Work, SH35O3-2001- J115
GB50202-2002- 010401~010405 桩基础质量验收记录
Record of Quality Inspection & Acceptance of Pile Foundation, GB50202-2002- 010401~010405
SH35O3-2001- J20