1、提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DPS-S1钻孔DK1231+085.0左10米孔口196.25名称编号里程标高终孔110套管直径过滤器直径提水管5.000直径加固深度安装位置容量(升)孔深15.00初见水位未见稳定水位1.9m落程3.20稳定时间4:45日抽提水试验观测恢复水位观测分钟起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm 用时20099月25日16:350:001.9018:400:051.005.2821:200:055.10016:400:058.005.6018:450:051.005.2621:250

2、:054.761516:450:051.005.5918:500:051.005.2421:300:054.222016:500:051.005.5718:550:051.005.2321:350:054.143016:550:051.005.5719:000:051.005.2321:400:053.954517:000:051.005.5519:050:051.005.2521:450:053.806517:050:051.005.5219:100:051.005.2221:550:103.419017:100:051.005.5219:150:051.005.2022:050:103.2

3、312017:150:051.005.5019:200:051.005.2122:150:103.0815017:200:051.005.4819:250:051.005.2022:250:102.9918017:250:051.005.4619:300:051.005.1922:350:102.9121017:300:051.005.4519:350:051.005.1722:450:102.7524017:350:051.005.4219:400:051.005.1623:000:152.5727017:400:051.005.4219:450:051.005.1423:150:152.4

4、030017:450:051.005.4119:500:051.005.1123:300:152.2133017:500:051.005.3919:550:051.005.110:000:302.0436017:550:051.005.3720:000:051.005.120:300:301.9039018:000:051.005.3620:050:051.005.11恢复水位结束42018:050:051.005.3720:100:051.005.1045018:100:051.005.3720:150:051.005.0948018:150:051.005.3520:200:051.005

5、.0951018:200:051.005.3420:500:301.005.1054018:250:051.005.3221:200:301.005.1057018:300:051.005.31提水结束60018:350:051.005.92630660690720备750780注810队别:钻探技术人员:高传超机长:单建国班长:单建国记录员:杨巧840提(抽)水试验记录表870900山西中南部大能力铁路对外通道线定测气温水温930工程铺子山隧道钻孔DPS-S1钻孔DK1231+085.0左10米孔口196.25960名称编号里程标高990终孔110套管直径过滤器直径200.00提水管1020

6、直径加固深度安装位置40.00容量(升)1050孔深15.00初见水位未见稳定水位1.90落程#稳定时间5:101080日抽提水试验观测恢复水位观测1110起止间隔水量水位起止间隔水量水位时间间隔水位1140期时间t管m时间t管mttm117020099月25日8:200:101.9012:400:101.003.9913:300:054.0012008:300:103.003.4012:500:101.004.2013:350:053.9312308:400:101.003.4413:000:101.004.0013:400:053.6712608:500:101.003.4713:100:

7、101.004.0013:450:053.5312909:000:101.003.5213:200:101.004.0013:500:053.4113209:100:101.003.5713:300:101.004.0013:550:053.3113509:200:101.003.59 提水结束14:050:103.1313809:300:101.003.6414:150:103.0514109:400:101.003.6814:250:102.9514409:500:101.003.7314:350:102.89147010:000:101.003.7514:450:102.72150010

8、:100:101.003.7514:550:102.5910:200:101.003.7915:050:102.4510:300:101.003.8115:150:102.2910:400:101.003.8515:250:102.1410:500:101.003.8815:350:102.0211:000:101.003.9216:050:301.9611:100:101.003.9216:350:301.9011:200:101.003.9511:300:101.003.9711:400:101.003.9711:500:101.003.9512:000:101.003.9712:100:

9、101.003.9812:200:101.003.98备注队别:钻探技术人员:高传超机长:单建国班长:单建国记录员:杨巧提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DPS-S2钻孔DK1231+400.0左10米孔口名称编号里程标高终孔110套管直径过滤器直径提水管直径加固深度安装位置容量(升)孔深30.00初见水位未见稳定水位0.80落程2.60稳定时间5:40日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm9月24日8:100:100.8012:500:101.003.4213:593.4008:200

10、:101.002.6013:000:101.003.4114:090:102.9258:300:101.002.6513:100:101.003.4014:190:102.48108:400:101.002.7113:200:101.003.4014:290:102.20158:500:101.002.8013:300:101.003.3814:390:102.01259:000:101.002.8813:400:101.003.4014:490:101.80359:100:101.002.9513:500:101.003.4014:590:101.72459:200:101.003.02提水

11、结束15:090:101.50609:300:101.003.1015:190:101.41909:400:101.003.2115:290:101.361209:500:101.003.2915:390:101.2215010:000:101.003.2515:490:101.1018010:100:101.003.3415:590:101.0221010:200:101.003.4216:090:100.9624010:300:101.003.4016:190:100.9027010:400:101.003.4416:290:100.8530010:500:101.003.4216:390

12、:100.8333011:000:101.003.3816:490:100.8036011:100:101.003.38恢复水位观测39011:200:101.003.4042011:300:101.003.3845011:400:101.003.4148011:500:101.003.4151012:000:101.003.4054012:100:101.003.3657012:200:101.003.3860012:300:101.003.4063012:400:101.003.40660备690720注750队别:钻探技术人员:高传超机长:朱新阳班长:朱新阳记录员:吕怀君780提(抽)水

13、试验记录表810840山西中南部大能力铁路对外通道线定测气温水温870工程铺子山隧道钻孔DPS-S2钻孔DK1231+400.0左10米孔口900名称编号里程标高930终孔110套管直径过滤器直径提水管960直径加固深度安装位置容量(升)990孔深30.00初见水位未见稳定水位0.80落程2.60稳定时间4:051020日抽提水试验观测恢复水位观测1050起止间隔水量水位起止间隔水量水位时间间隔水位1080期时间t管m时间t管mttm11109月24日14:500:050.8017:100:051.004.1319:000:054.70114014:550:053.003.3017:150:0

14、51.004.1619:050:053.95117015:000:051.003.3817:200:051.004.1519:100:053.40120015:050:051.003.4517:250:051.004.1919:150:053.15123015:100:051.003.5017:300:051.004.2219:200:052.92126015:150:051.003.5717:350:051.004.2519:250:052.68129015:200:051.003.5517:400:051.004.2919:350:102.35132015:250:051.003.5817

15、:450:051.004.3219:450:102.10135015:300:051.003.6217:500:051.004.3619:550:101.88138015:350:051.003.6517:550:051.004.4020:050:101.6515:400:051.003.6718:000:051.004.4320:150:101.4715:450:051.003.7018:050:051.004.4720:250:101.2615:500:051.003.6818:100:051.004.5220:350:101.0315:550:051.003.7118:150:051.0

16、04.5620:450:100.9216:000:051.003.7318:200:051.004.6221:150:300.8916:050:051.003.7518:250:051.004.6821:450:300.8616:100:051.003.7918:300:051.004.6822:150:300.8216:150:051.003.8318:350:051.004.7222:450:300.8016:200:051.003.8118:400:051.004.70水位恢复结束16:250:051.003.8418:450:051.004.6916:300:051.003.8618:

17、500:051.004.7016:350:051.003.9018:550:051.004.70106.5616:400:051.003.93提水结束16:450:051.003.9716:500:051.004.0016:550:051.004.0317:000:051.004.0717:050:051.004.09备注队别:钻探技术人员:高传超机长:朱新阳班长:朱新阳记录员:吕怀君提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔 DPS-S3-1钻孔DK1231+800.0孔口名称编号里程标高终孔110套管直径过滤器直径提水管5.000直径加固深度安装位置容

18、量(升)孔深75.00初见水位未见稳定水位6.20落程2.60稳定时间日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm9月30日7:506.2011:300:306.0010.2013:000:0510.208:000:108.009.3012:000:306.0010.2013:050:059.728:050:051.009.4012:300:306.0010.2013:100:059.318:100:051.009.4513:000:306.0010.2013:150:058.928:150:051.009.50提水结束13:200:05

19、8.608:200:051.009.5213:250:058.428:250:051.009.5913:300:058.208:300:051.009.6613:400:107.848:350:051.009.7013:500:107.688:400:051.009.7414:000:107.558:450:051.0010.0214:100:107.428:500:051.0010.0514:200:107.318:550:051.0010.0714:300:107.009:000:051.0010.0915:000:306.799:050:051.0010.1115:300:306.549

20、:100:051.0010.1216:000:306.329:150:051.0010.1516:300:306.279:200:051.0010.1017:000:306.249:250:051.0010.1817:300:306.229:300:051.0010.2018:000:306.209:350:051.0010.21恢复水位结束9:400:051.0010.179:450:051.0010.209:500:051.0010.2210:000:101.0010.2010:100:101.0010.2010:300:202.0010.2011:000:304.0010.20备注队别:

21、钻探技术人员:高传超机长:董秀欣班长:董秀欣记录员:吕怀君提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔 DPS-S3-1钻孔DK1231+800.0孔口名称编号里程标高终孔110套管直径过滤器直径提水管5.000直径加固深度安装位置容量(升)孔深75.00初见水位未见稳定水位6.20落程4.00稳定时间日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm9月29日7:506.2012:300:101.008.8012:400:058.808:000:103.007.6012:400:101.008.8012:4

22、50:058.658:100:101.007.66提水结束12:500:058.528:200:101.007.7712:550:058.408:300:101.007.8313:000:058.198:400:101.007.8813:050:058.058:500:101.007.9413:150:107.559:000:101.007.9913:250:107.459:100:101.008.0513:350:107.309:200:101.008.1013:450:107.149:300:101.008.1614:000:157.009:400:101.008.1814:150:156

23、.909:500:101.008.2414:300:156.7910:000:101.008.3014:450:156.6510:100:101.008.3415:000:156.5510:200:101.008.3915:150:156.4610:300:101.008.4415:300:156.3510:400:101.008.4816:000:306.2810:500:101.008.5316:300:306.2511:000:101.008.5717:000:306.2311:100:101.008.6217:300:306.2011:200:101.008.66恢复水位结束11:30

24、0:101.008.6911:400:101.008.7211:500:101.008.7212:000:101.008.7512:100:101.008.7912:200:101.008.80备注队别:钻探技术人员:高传超机长:董秀欣班长:董秀欣记录员:吕怀君提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DPS-S4钻孔DK1232+620.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管5.000直径加固深度安装位置容量(升)孔深60.00初见水位未见稳定水位2.20落程3.20稳定时间4:00日抽提水试验观测恢复水位观测起止间隔水量水位起

25、止间隔水量水位时间间隔水位期时间t管m时间t管mttm10月2日8:002.2012:000:306.005.4012:000:055.408:050:057.004.90提水结束12:050:054.928:100:051.004.9712:100:054.538:150:051.005.0112:150:054.148:200:051.005.0312:200:053.898:250:051.005.0512:300:103.418:300:051.005.0812:400:103.058:350:051.005.0812:500:102.768:400:051.005.1213:000:

26、102.548:450:051.005.1713:150:152.388:500:051.005.1913:300:152.328:550:051.005.2413:450:152.299:000:051.005.2614:000:152.249:050:051.005.2914:300:302.229:100:051.005.3115:000:302.209:150:051.005.31恢复水位结束9:200:051.005.349:250:051.005.379:300:051.005.369:350:051.005.399:400:051.005.419:450:051.005.409:

27、500:051.005.389:550:051.005.4010:000:051.005.4010:300:306.005.4011:000:306.005.4011:300:306.005.40备注队别:钻探技术人员:高传超机长:单建国班长:单建国记录员:杨巧提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DPS-S4钻孔DK1232+620.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管5.000直径加固深度安装位置容量(升)孔深60.00初见水位未见稳定水位2.20落程2.00稳定时间5:10日抽提水试验观测恢复水位观测起止间隔水量水位起

28、止间隔水量水位时间间隔水位期时间t管m时间t管mttm10月1日7:502.2013:000:054.207:550:057.003.4013:050:053.908:050:101.003.5113:100:053.658:150:101.003.5413:150:053.428:250:101.003.6013:200:053.218:350:101.003.6813:250:053.048:450:101.003.7213:300:052.828:550:101.003.7713:400:102.609:050:101.003.8413:500:102.419:150:101.003.8

29、614:000:102.349:250:101.003.9114:100:102.329:350:101.003.9514:400:302.299:450:101.003.9715:100:302.259:550:101.004.0015:400:302.2210:050:101.004.0316:100:302.2010:150:101.004.05恢复水位结束10:250:101.004.0810:350:101.004.1210:450:101.004.1210:550:101.004.1511:050:101.004.1811:150:101.004.2011:250:101.004.

30、2211:350:101.004.2012:050:303.004.2012:350:303.004.2013:050:303.004.20提水结束备注队别:钻探技术人员:高传超机长:单建国班长:单建国记录员:杨巧提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DP2S-S5钻孔DK1233+430.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管25.000直径加固深度安装位置容量(升)孔深25.00初见水位1.50稳定水位1.30落程2.90稳定时间4:40日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时

31、间t管mttm9月30日8:201.3011:300:306.004.2013:000:054.208:250:052.003.7712:000:306.004.2013:050:052.528:300:051.003.8012:300:306.004.2013:100:051.758:350:051.003.8213:000:306.004.2013:150:051.628:400:051.003.85提水结束13:200:051.518:450:051.003.8913:300:101.488:500:051.003.9013:400:101.458:550:051.003.9513:50

32、0:101.429:000:051.003.9514:000:101.399:050:051.003.9714:300:301.359:100:051.003.9815:000:301.329:150:051.004.0015:300:301.309:200:051.004.05恢复水位结束9:250:051.004.059:300:051.004.089:350:051.004.139:400:051.004.129:450:051.004.159:500:051.004.179:550:051.004.1910:000:051.004.2010:050:051.004.2010:100:0

33、51.004.2110:150:051.004.1910:200:051.004.2010:300:102.004.2011:000:306.004.20备注队别:钻探技术人员:高传超机长:任恒敬班长:任恒敬记录员:高福磊提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DP2S-S5钻孔DK1233+430.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管25.000直径加固深度安装位置容量(升)孔深25.00初见水位1.50稳定水位1.30落程1.90稳定时间日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时

34、间t管mttm9月29日8:001.3012:400:101.003.1713:100:053.208:100:102.003.8012:500:101.003.2013:150:052.108:200:101.003.6013:000:101.003.2213:200:051.728:300:101.003.5513:100:101.003.2013:250:051.608:400:101.003.55提水结束13:300:051.508:500:101.003.5013:400:101.489:000:101.003.5013:500:101.469:100:101.003.5014:00

35、0:101.429:200:101.003.4014:100:101.409:300:101.003.3814:400:301.369:400:101.003.3615:100:301.339:500:101.003.3215:400:301.3210:000:101.003.3516:100:301.3010:100:101.003.30恢复水位结束10:200:101.003.3510:300:101.003.3010:400:101.003.2810:500:101.003.2511:000:101.003.2511:100:101.003.3011:200:101.003.2511:3

36、00:101.003.1011:400:101.003.0811:500:101.003.2512:000:101.003.2012:100:101.003.1812:200:101.003.2412:300:101.003.20备注队别:钻探技术人员:高传超机长:任恒敬班长:任恒敬记录员:高福磊提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DP2S-S6钻孔DK1234+390.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管10.000直径加固深度安装位置容量(升)孔深35.00初见水位1.20稳定水位1.10落程3.90稳定时间4:40日

37、抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm10月1日8:301.1011:050:153.005.1013:200:055.108:400:104.004.2511:200:153.005.1013:250:054.728:450:051.004.3111:500:306.005.1013:300:054.428:500:051.004.4312:200:306.005.1013:350:054.168:550:051.004.5212:500:306.005.1013:400:053.849:000:051.004.6013:200:3

38、06.005.1013:450:053.569:050:051.004.68提水结束13:550:103.329:100:051.004.2414:050:103.049:150:051.004.2614:150:102.809:200:051.004.8214:250:102.539:250:051.004.8214:350:102.279:300:051.004.9014:500:152.069:350:051.004.9215:050:151.759:400:051.004.9415:200:151.549:450:051.004.9615:350:151.409:500:051.004

39、.9715:500:151.289:550:051.005.0216:200:301.2210:000:051.005.0216:500:301.1510:050:051.005.0417:200:301.1010:100:051.005.05恢复水位结束10:150:051.005.0410:200:051.005.0810:250:051.005.1010:300:051.005.1210:350:051.005.0910:400:051.005.1210:450:051.005.1010:500:051.005.10备注队别:钻探技术人员:高传超机长:任恒敬班长:任恒敬记录员:高福磊提(

40、抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DP2S-S6钻孔DK1234+390.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管10.000直径加固深度安装位置容量(升)孔深35.00初见水位1.20稳定水位1.10落程2.30稳定时间5:05日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm9月30日9:051.10提水结束14:100:053.509:100:054.002.8314:150:053.309:200:101.002.9514:200:053.039:300:101.003.

41、0414:250:052.939:400:101.003.1214:300:052.829:500:101.003.1914:350:052.6610:000:101.003.2614:400:052.5310:100:101.003.3314:500:102.2710:200:101.003.3515:000:102.1110:300:101.003.3915:100:102.0610:400:101.003.4015:250:151.7510:500:101.003.4215:400:151.5511:000:101.003.4515:550:151.4111:100:101.003.45

42、16:100:151.2811:200:101.003.4716:400:301.2211:300:101.003.5217:100:301.1711:400:101.003.5117:400:301.1011:500:101.003.52恢复水位结束12:000:101.003.4912:100:101.003.5012:200:101.003.5112:300:101.003.5012:400:101.003.4912:500:101.003.5013:000:101.003.5013:100:101.003.5013:400:301.003.5014:100:301.003.50备注队别

43、:钻探技术人员:高传超机长:王勇班长:王勇记录员:刘荣提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DP2S-S7钻孔DK1234+800.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管10.000直径加固深度安装位置容量(升)孔深40.00初见水位2.90稳定水位2.10落程2.20稳定时间5:00日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm10月2日8:402.1013:200:101.004.3013:400:054.308:500:102.002.9013:300:101.004

44、.3013:450:053.979:000:101.003.0113:400:101.004.3013:500:053.659:100:101.003.10提水结束13:550:053.419:200:101.003.1514:000:053.169:300:101.003.2314:050:052.959:400:101.003.3014:150:102.809:500:101.003.3914:250:102.6610:000:101.003.5114:350:102.5010:100:101.003.6014:450:102.3710:200:101.003.6814:550:102.2

45、810:300:101.003.7515:100:152.2310:400:101.003.7015:250:152.1910:500:101.003.7615:550:302.1411:000:101.003.8316:250:302.1011:100:101.003.88恢复水位结束11:200:101.003.9411:300:101.004.0111:400:101.004.0511:500:101.004.1012:000:101.004.1412:100:101.004.1412:200:101.004.1912:300:101.004.2112:400:101.004.2412:

46、500:101.004.2713:000:101.004.2813:100:101.004.30备注队别:钻探技术人员:高传超机长:王勇班长:王勇记录员:刘荣提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DP2S-S7钻孔DK1234+800.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管10.000直径加固深度安装位置容量(升)孔深40.00初见水位2.90稳定水位2.10落程3.30稳定时间3:30日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm10月3日9:102.1011:300:0

47、51.006.0312:400:056.109:150:054.005.3511:350:051.006.0412:450:055.739:200:051.005.4011:400:051.006.0612:500:055.659:250:051.005.4411:450:051.006.0612:550:055.389:300:051.005.5011:500:051.006.0813:000:055.129:350:051.005.5311:550:051.006.0813:050:054.809:400:051.005.5812:000:051.006.0913:150:104.579:

48、450:051.005.6212:050:051.006.0913:250:104.319:500:051.005.6512:100:051.006.1013:350:104.089:550:051.005.7012:150:051.006.1013:450:103.6510:000:051.005.7412:200:051.006.1013:550:103.1610:050:051.005.7712:250:051.006.1014:100:152.8010:100:051.005.8012:300:051.006.1014:300:202.5010:150:051.005.8312:350

49、:051.006.1014:500:202.2810:200:051.005.8812:400:051.006.1015:200:302.1910:250:051.005.92提水结束15:500:302.1410:300:051.005.9016:200:302.1010:350:051.005.94恢复水位结束10:400:051.005.9610:450:051.005.9710:500:051.005.9610:550:051.005.9811:000:051.005.9911:050:051.006.0011:100:051.006.0011:150:051.006.0211:200

50、:051.006.0211:250:051.006.04备注队别:钻探技术人员:高传超机长:王勇班长:王勇记录员:刘荣提(抽)水试验记录表山西中南部大能力铁路对外通道线定测气温水温工程铺子山隧道钻孔DP2S-S8钻孔DK1235+330.0左10m孔口名称编号里程标高终孔110套管直径过滤器直径提水管5.000直径加固深度安装位置容量(升)孔深50.00初见水位2.60稳定水位3.50落程2.60稳定时间4:40日抽提水试验观测恢复水位观测起止间隔水量水位起止间隔水量水位时间间隔水位期时间t管m时间t管mttm10月4日10:103.5014:500:101.006.1014:500:056.

展开阅读全文
相似文档                                   自信AI助手自信AI助手
猜你喜欢                                   自信AI导航自信AI导航
搜索标签

当前位置:首页 > 教育专区 > 其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服