收藏 分销(赏)

SAUDI ARAMCO阿美井控手册(英文).pdf

上传人:曲**** 文档编号:313975 上传时间:2023-08-09 格式:PDF 页数:178 大小:13.85MB
下载 相关 举报
SAUDI ARAMCO阿美井控手册(英文).pdf_第1页
第1页 / 共178页
SAUDI ARAMCO阿美井控手册(英文).pdf_第2页
第2页 / 共178页
SAUDI ARAMCO阿美井控手册(英文).pdf_第3页
第3页 / 共178页
SAUDI ARAMCO阿美井控手册(英文).pdf_第4页
第4页 / 共178页
SAUDI ARAMCO阿美井控手册(英文).pdf_第5页
第5页 / 共178页
点击查看更多>>
资源描述

1、一-noSAUD-ARAMCOMM2*oA N D W*O V E R W E L L C O N T R O L M A N U A LZ-;“A:SSaudi Ar amcoWell Control Manual Volume I,5th EditionINTRODUCTION AND DOCUMENT CONTROLCHAPTER A EQUIPMENT REQUIREMENTSCHAPTER B BOP SYSTEMSCHAPTER C MAINTENANCE,TESTING AND RECERTIFICATIONCHAPTER D WELL CONTROLLED POLICIESCH

2、APTER E WELL CONTROL DRILLSCHAPTER F SUPPLEMENTAL REFERENCES Copyright 2014,Saudi Aramco.All rights reserved.No portion of this document may be reproduced,by any process or technique,without the express written consent of Saudi Aramco Well Control CommitteeWELL CONTROL MANUAL:5th EDITION VOLUME IDri

3、llin。&WorkoverINTRODUCTION AND DOCUMENT CONTROLopgciuJIgSoIj i _%udi Ammco1.0 INTRODUCTIONThe 5th edition of the Well Control Manual has some significant changes from the 4th Edition.It is the r esponsibility of the author ized user s of this manual to familiar ize themselves with the specifications

4、 and instr uctions in its entir ety.2.0 REVISIONSThe Well Control Manual(WCM)will undergo a full review and revision every three years.The WCM will be reviewed by the Well Control Committee(WCC),endorsed by the General Manager of Drilling and approved by the Vice President of Drilling and Workover.D

5、ocument Contr ol:The Well Control Manual(WCM)is subject to constant review,revision and updates by the Well Control Committee(WCC).The timely implementation of the policies contained in this document is critical and steps must be taken to ensure that the latest revision including published errata an

6、d amendments is available to Drilling and Workover Rigs and Management.Revisions and Updates will be contr olled as follows:1 The WCM will be fully reviewed and reissued after three(3)years.2 Interim revisions and updates will be issued as errata or amendments as required.3 A revision log will be ma

7、intained at the beginning of the WCM that will list and summarize any changesTo ensure that the document is available to all concerned parties there will be two(2)versions of the manual available,Electronic and Printed.Electr onic Ver sion:The Electronic version will reside on the Drilling Informati

8、on Highway.This document is available for viewing by all authorized DIH users.If a page or section is printed from DIH,it is considered uncontrolled as of the print date.Pr inted Ver sion:Printed copies will be issued as follows:V.P.D&WO General Manager,Drilling All D&WO Managers All Drilling and Wo

9、rkover Rig Superintendents All Members of the Well Control Committee.All rigs operating under Drilling and Workover will have one copy in the Foremans Office.Each Drilling or Workover Rig Contractors local head office.D&WO Contracts Administration DivisionUpdates and Revisions to pr inted copies wil

10、l be contr olled as follows:1.When errata or an amendment is issued a notification will be sent to all D&WO personnel.The master electronic copy on the DIH will have the errata and amendments placed at the beginning of the file.Current Revision:JUNE,2014Previous Revision:MAY,2010INT-1WELL CONTROL MA

11、NUAL:5 EDITIONDrilling&WorkoverVOLUME ICHAPTER A-EQUIPMENT SPECIFICATIONS AND REQUIREMENTSangpiullgSolj l%udi Ar amsCHAPTER A:EQUIPMENT SPECIFICATIONS CND REQUIREMENTSTABLE OF CONTENTS1.0 PRIMARY WELL CONTROL EQUIPMENT REQUIREMENTS1.1 General Requirements A:S1.2 Annular Units and Diverters A;51.3 Fi

12、xed Ram Preventers and Elastomers ArS1.4 Variable Bore Ram Preventer Blocks and Elastomers A-61.5 Shear Blind Ram(SBR)Blocks and Elastomers A-61.6 Valve Removal Plugs and Blind Flanges on BOP Side Outlets1.7 Drilling Spools_2.0 REQUIREMENTS FOR KILL,EMERGENCY KILL,CHOKE LINES AND CHOKES2.1 Minimum B

13、ore Size for Lines:A-92.2 Material and Fabrication A-92.3 Requirements for Drilling Chokes A-112.4 Requirements for Valves A-112.5 Requirements for Cup Testers A-123.0 ACCESSORY BOP EQUIPMENT REQUIREMENTS3.1 Pit Volume Totalizers A-123.2 Mud Flow Indicators A-123.3 Gas Busters A-123.4 Full Opening S

14、afety Valves A-173.5 Inside BOP Al?3.6 Trip Tank A-183.7 Bowl Protectors(Wear Bus h ings)A-193.8 Valve Removal Plugs A-193.9 Drillpipe Float Valves A-19Current Revision:JUNE,2014Previous Revision:MAY,2010A-1WELL CONTROL MANUAL:5 EDITIONDrilling&WorkoverVOLUME ICHAPTER A-EQUIPMENT SPECIFICATIONS AND

15、REQUIREMENTSdngpiiillgSolj l%udi Ar amco3.10 Weco Connections A-193.11 Chiksans A-193.12 Accumulator Closing Units A-203.13 Stroke Counters A-223.14 Gas Detectors A-223.15 Drill Rate Recorders A-223.16 Pump Lines for Existing Offshore Well Kill A-23Current Revision:JUNE,2014Previous Revision:MAY,201

16、0A-2WELL CONTROL MANUAL:5 EDITIONDrilling&WorkoverVOLUME ICHAPTER A-EQUIPMENT SPECIFICATIONS AND REQUIREMENTSdngpiiillgSolj l%udi Ammco1.0 WELL CONTROL EQUIPMENT SPECIFICATIONS AND REQUIREMENTSThis Chapter of the Well Control Manual sets forth the specifications and requirements for Blow Out Prevent

17、ion Equipment(BOPE)and systems for use in Drilling and Workover Operations.Variations or deviations of BOPE,specifications,arrangement,pressure rating or requirements from this standard requires endorsement of the Well Control Committee,and approval by the Vice President of Drilling and Workover.The

18、 enforcement of these equipment standards shall be the responsibility of the Drilling or Workover Rig Superintendent.The Rig Foreman shall ensure that the proper equipment is available and correctly installed.If not specified in these standards all BOP equipment shall comply with API Specifications

19、and Recommended Practices.1.1 Gener al Requir ements:All Drilling and Workover Well Control Equipment shall meet the following requirements:1.1.1 All BOPE(Annulars,Ram Type,Valves,Chokes,Crosses Flexible Lines,Hard Lines and etc.)shall be of forged material,Monogrammed to API Specification 6A,16A,16

20、C,17D or other applicable API Specification as appropriate.1)All equipment in service in Saudi Aramco D&WO Operations must be API Monogrammed.This includes equipment transferred from other regions whether or not it is on a rig already.Monogram and markings MUST be clearly visible through the painted

21、 coating of the equipment.Care should be taken to preserve this monogram on the equipment nameplate,flange or body to prevent it being obliterated or destroyed during handling maintenance and use.Additionally,documentation must be available at the rig site reflecting the equipment Serial Number and

22、API Monogram Status.2)Any exceptions to this monogram policy(e.g.;30 1,000 psi annulars)are noted in the section detailing that specific equipment.1.1.2 All major BOPE components including,but not limited to,ram BOPs,annular BOPs,drilling spools,ram blocks,valves,choke and kill lines,choke manifolds

23、,gas busters etc.will have an unique serial or asset identification number assigned at time of manufacture by the ORIGINAL EQUIPMENT MANUFACTURER(OEM).The number must be per manently mar ked in the metal of the component body and should be paint stenciled in a pr ominent and visible location on the

24、equipment.This number must be r efer enced on all accompanying cer tification and r ecer tification documents.Repair number s ar e not acceptable for this r equir ement.1.1.3 Only OEM parts are acceptable when repairing or redressing the BOP,valves,chokes,and closing units.Documentation(e.g.;PO,invo

25、ice,certificate of compliance etc.)must be maintained for all parts verifying that they are OEM.1.1.4 Maintenance and testing requirements may be found in Chapter C Maintenance Testing and Certification Requirements of this manual.1.1.5 A drilling spool is preferred for primary choke and kill line i

26、nstallation.However in special cases,such as space limitation,preventer side outlets may be used in lieu of a drilling spool.The diameter of all preventer side outlets must be at least as large as the choke manifold lines.NOTE:Side outlets are used for installation of the lower choke and kill lines

27、on 10K/15K BOPs.Current Revision:JUNE,2014Previous Revision:MAY,2010A-3 Copyright 2014,Saudi AramcoMBGWELL CONTROL MANUAL:5 EDITIONDrilling&Workover VOLUME ICHAPTER A-EQUIPMENT SPECIFICATIONS AND REQUIREMENTSangpinllgSolj l%udi Ammco1.1.6 The through-bore size of the preventer stack,tubing head,and

28、any adapters used in the BOP hook-up shall be large enough for the maximum size bit,scraper,liner hanger,packer,plug,cup tester,bowl protector or any other large diameter down-hole tools to be run in the well.1.1.7 The pressure rating of all pressure control equipment(BOP,Valves,Lines etc.)must be g

29、reater than the MASP(Maximum Anticipated Surface Pressure).1.1.8 The inboard manual valves on the choke and kill lines are considered master valves and normally would not,except for pressure testing,be closed unless the outside valve(HCR)has failed.1.1.9 Check valves must be installed on normal kill

30、 lines but shall not be used on emergency kill lines.1.1.10 The kill line,emergency kill line and choke lines should be flushed and washed out frequently to prevent mud solids settling.1.1.11 BOP assemblies will be dismantled between wells to inspect for internal corrosion,erosion and to check flang

31、e bolts.Refer to Chapter C for maintenance procedures and requirements.1.1.12 All Rigs shall maintain a logbook of BOP schematics detailing the components installed.The logbooks shall contain the part number,size,description,serial number(if applicable)and installation date of ram blocks,top seals,r

32、am and annular packers and bonnet or door seals.This is be witnessed and co-signed by the Toolpusher and the Saudi Aramco Representative(see form#1 in Chapter C)of this manual).1.1.13 All ram preventers must be equipped with manual or automatic locking devices,which must be locked whenever the rams

33、are used to control the well.Hand crank,wrench or hand wheel systems are acceptable manual locking devices.1.1.14 All preventers and associated equipment must meet NACE MR-0175/ISO 15156,API Specification 6A,16A or 16C for sour service.1.1.15 A full OEM certification or recertification of the BOP,ch

34、oke manifold(including chokes)and all related equipment must be performed at the start of the contract and least once every three years thereafter.The r ecer tification must be in accor dance with the r elevant API Specification for r epair/r emanufactur e.The documentation package shall be kept wit

35、h the equipment and must be available for inspection at the rig site by Saudi Aramco personnel.This includes,but is not limited to:Ram preventers.Annular preventers.Valves on the kill,emergency kill,choke line and choke manifold.Drilling chokes.Kill,emergency kill and choke lines(and line components

36、)including both hard line and flexible hoses.Drilling spools.NOTE:Recertification can only be performed by the OEM or their licensee facility.If recertified by a licensee,the document package shall include a copy of the license issued by the OEM.In-field r ecer tification is not acceptable.Current R

37、evision:JUNE,2014Previous Revision:MAY,2010 Copyright 2014,Saudi AramcoMBGA-4WELL CONTROL MANUAL:5 EDITIONDrilling&WorkoverVOLUME ICHAPTER A-EQUIPMENT SPECIFICATIONS AND REQUIREMENTSdngpnillgSj Dlj lAudi Ar amcoNOTE:New equipment shall be accompanied by the manufacturers certificate of compliance an

38、d a full documentation package including inspection and test reports.1.1.16 All BOPE including,but not limited to,annulars,ram type,valves,spools,crosses,tees and other end and outlet connections with working pressures of 3,000 psi and above shall have flanged,welded,integral,or hubbed connections o

39、nly.Threaded connections and threaded connections that have been seal welded are not permitted.1.1.17 All Ram Type BOP cavities MUST CONTAIN a Ram.Vacant Ram cavities during operations are not permitted.1.2 Annular Units and Diver ter s:1.2.1All annular units must comply with the following in additi

40、on to the requirements in Section 1.1.1.2.2The minimum acceptable ratings for H2s and temperature are as follows,2,000 psi and less 2.5%H2S and 0-170 F3,000 psi equipment 2.5%H2S and 0-180 F5,000 psi equipment 2.5%H2S and 0-180 F10,000 psi equipment 2.5%H2s and 0-180 F1.2.3The acceptable annular man

41、ufacturers are Cameron,GE-Hydril and NOV-Shaffer.1.2.4GE Vetcx)KFDJ and Dril-Quip MD diverters are acceptable for offshore 500,1,000 and 2,000 psi service.Dr il-Quip,is cur r ently the only appr oved design,for the 500 psi onshor e diver ter.NOTE:The Dril-Quip onshore diverter is not eligible for AP

42、I Monogram and is not subject to the 3-year recertification requirement.Only repair after each nipple-up is required.1.2.5If a rotary diverter system is utilized on an offshore rig,the diverter lines must have the capability of discharging below the bottom of the hull due to H2s concerns.1.2.6Bolted

43、,latched and screwed top annulars are acceptable.1.2.730 inch 1,000 psi annulars may not be monogrammed under API specification 16A.These annulars are exempt from the monogram requirement.1.3 Fixed Ram Pr eventer Blocks and Elastomer s:1.3.1All fixed ram preventers must comply with the following in

44、addition to the requirements in Section 1.1 above.1.3.2Only fixed size rams are acceptable as the master pipe ram(bottom ram)on all BOP stacks.1.3.3The minimum acceptable ratings for H2S and temperature for ram assemblies are:3,000 psi stack 5.0%H2S and 0-250 F5,000 psi stack 10.0%H2S and 0-250 FCur

45、rent Revision:JUNE,2014 A-5 Copyright 2014,Saudi AramcoPrevious Revision:MAY,2010 MBGWELL CONTROL MANUAL:5 EDITIONDrilling&Workover VOLUME ICHAPTER A-EQUIPMENT SPECIFICATIONS AND REQUIREMENTSdngpiullgSolj l%udi Ar amco10,000 psi stack 20.0%H2s and 0-300 F15,000 psi stack 20.0%H2S and 0-300 F1.3.4 Ca

46、meron,NOV-Shaffer and GE-Hydril are acceptable manufacturers for ram preventers.All ram assemblies shall meet NACE Standard MR-01-75-2000 for sour service.NOTE:Fixed size ram preventers CANNOT CLOSE on TOOL JOINTS1.3.5 All ram preventers shall be equipped with manual or automatic locking devices whi

47、ch must be locked whenever the rams are closed to control the well.A hand crank/wrench or handwheel system are acceptable manual devices.Automatic devices(e.g.:Shaffer Posilocks)are also acceptable.1.4 Var iable Bor e Ram Pr eventer Blocks and Elastomer s:1.4.1 All variable bore ram preventers must

48、comply with the following in addition to the requirements in Section 1.1 above.1.4.2 Variable bore rams(VBR)are optional for tapered drill string applications on Class A stacks.In all cases the master pipe ram(bottom ram)must be a fixed ram.1.4.3 The minimum acceptable ratings for H2s and temperatur

49、e for VBRs are:3,000 psi stack 5.0%H2S and 0-250 F5,000 psi stack 10.0%H2S and 0-250 F1.4.4 The Cameron Extended Range High Temperature VBR-II Packer(3-1/2 to 5-7/8 pipe sizes)for the Cameron 13-5/8 U Type blowout prevented is acceptable for 3,000 and 5,000 psi applications ONLY.This VBR was success

50、fully tested to 250 F with a CAM LAST elastomer rated for 20%H2S.NOTE:The Cameron ER-HT VBR-II,described above,is approved for use in 3M and 5M Class A BOPs.This is the ONLY APPROVED VBR.1.5 Shear Blind Ram(SBR)Blocks and Elastomer s:1.5.1 SBRs are required on:Close Proximity Wells(All Wells in Popu

展开阅读全文
相似文档                                   自信AI助手自信AI助手
猜你喜欢                                   自信AI导航自信AI导航
搜索标签

当前位置:首页 > 行业资料 > 其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服