1、目录设计总阐明VGeneral Design IntroductionIX1 前言11.1 设计背景11.1.1 国内污水解决背景11.1.2 哈尔滨市背景资料11.1.3 设计资料11.1.4 污水特性11.2 都市污水解决厂工艺选取原则21.3 工艺流程及各种工艺优缺陷对比41.4 工艺流程82 污水解决系统设计计算92.1 格栅92.1.1 格栅设计92.1.2 设计参数102.1.3 中格栅设计计算102.1.4 细格栅设计计算132.2 提高泵站152.2.1 泵站设计原则152.2.2 泵房形式及工艺布置162.2.3 泵房设计计算162.3 沉砂池192.3.1 曝气沉砂池202
2、.3.2 设计参数202.3.3 曝气沉砂池设计计算202.3.4 曝气沉砂池曝气计算242.4 A/O反映池252.4.1 构筑物简介252.4.2 设计阐明252.4.3 重要作用252.4.4 设计参数252.4.5 设计计算252.4.6 污泥回流比及混合液回流比272.4.7 剩余污泥量、生产污泥量272.4.8 需氧量计算282.4.9 供气量计算282.4.10 鼓风微孔曝气器空气管路计算302.6 二沉池312.6.1 沉淀池类型及选取312.6.2 辐流式二沉池设计参数312.6.3 设计计算312.6.4 设备选用333 污泥解决系统设计计算343.1 污泥浓缩池343.1
3、.1 设计阐明343.1.2 设计规定343.1.3 设计参数353.1.4 设备选型393.2 贮泥池393.2.1 构筑物简介393.2.2 重要作用403.2.3 设计参数403.2.4 设计计算403.2.5 设备选型403.3 蓄水池403.3.1 构筑物简介403.3.2 重要作用413.3.3 设计阐明413.3.4 设计计算413.4 脱水机房413.4.1 构筑物简介413.4.2 重要作用413.4.3 设计计算413.4.4 设备选用424 污水解决厂总体布置434.1 污水解决厂平面布置434.2 平面布置原则434.3 平面布置454.3.1 工艺流程布置454.3.
4、2 构(建)筑物平面布置454.3.3 污水厂管线布置454.3.4 厂区道路布置464.4 污水解决构筑物高程布置464.4.1 重要任务474.4.2 布置原则474.4.3 构筑物高程计算484.4.4 构筑物高程布置504.5 污泥解决构筑物高程布置514.5.1 污泥管道水头损失514.5.2 污泥解决构筑物水头损失524.5.3 污泥高程布置525 经济技术可行性分析536 环境影响评价546.1建设过程中对环境影响及对策546.1.1 生态影响分析546.1.2 施工扬尘环境影响分析546.1.3 施工噪声环境影响分析566.1.4 施工排水、及建筑垃圾环境影响分析576.2 项
5、目建成后环境影响及对策586.3 环保投资596.4 资源损益分析606.5 环境损益分析606.6 社会损益分析61参照文献62附 录63道谢64哈尔滨市15万m3/d污水解决厂工艺设计A/O工艺设计总阐明1. 设计目、规定、原则1.1 项目提出背景及投资必要性哈尔滨市是国内东北黑龙江省省会都市,随着都市化进程加快和经济建设飞速发展,都市污水排放量也迅速增长,大量未经解决污水任意排放.如果不能得到妥善解决,将给都市及水环境导致严重污染,影响人居环境质量和都市可持续发展. 国内水资源形势处在相称困难境地,流经所有都市河段中90%以上收到中度或更严重污染,50%都市河段水不能饮用。大量河流除排污
6、外已失去其他效用。许多重要湖泊处在不同步期富营养化阶段。依照环境部门对全国河流、湖泊、水库水质状况监测,由于近年来工业废水和城乡生活污水排放等因素,哈尔滨市重要水系水体都遭到了不同限度污染。同步,大量工业废水和生活污水未经解决直接排入水域,使其受到严重污染,致使河水中生物、植物大某些绝迹,破坏了自然景观、污染城区下游地下水源,严重制约着经济发展。为改进环境,治理河水污染问题,建设都市污水治理工程势在必行。1.2 A/O工艺设立要达到污水排放原则应符合城乡污水解决厂污染物排放原则(GB18918)一级A原则。即:出水水质CODBOD5NH4NSSpHTP单位(mg/L)50105(8)(15)1
7、06911.3 设计原则都市污水解决目是使之达标排放或污水回用用于使环境不受污染,解决后出水回用于农田灌溉,都市景观或工业生产等,以节约水资源。都市污水解决及污染防治技术政策对污水解决工艺选取给出如下几项关于城乡污水解决工艺选取准则:(1)都市污水解决工艺应依照解决规模、水质特性、受纳水体环境功能及本地实际状况和规定,经全面技术经济比较后优先拟定;(2)工艺选取重要技术经济指标涉及:解决单位水量投资,削减单位污染物投资,解决单位水量电耗和成本,削减单位污染物电耗和成本,占地面积,运营性能,可靠性,管理维护难易限度,总体环境效益;(3)应切合实际地拟定污水进水水质,优先工艺设计参数必要对污水现状
8、、水质特性、污染物构成进行详细调查或测定,做出合理分析预测;(4)在水质构成复杂或特殊时,进行污水解决工艺动态实验,必要时应开展中试研究;(5)积极地采用高效经济新工艺,在国内初次应用新工艺必要通过中试和生产性实验,提供可靠性设计参数,然后进行运用。2. 工程概况2.1 设计规模Q=15万m3/d,变化系数:Kz=1.32.2 进、出水水质进水水质CODBOD5NH4NSSTP单位(mg/L)230150281802.5出水应符合城乡污水解决厂污染物排放原则(GB18918)一级A原则。即:出水水质CODBOD5NH4NSSpHTP单位(mg/L)50105(8)(15)106912.3 气象
9、、水文、地质条件哈尔滨市属于半湿润温带大陆性季风气候,其气候特点是,冬季在极地大陆冷气团控制下,气候寒冷、干燥,夏季受太平洋副热带气团影响,降水集中,气候温和、湿润。气候有明显季节性变化,春季回暖快而多大风,全年主导风向西南风。年平均气温3.6,最低气温为-38.1;年平均降雨量为553.5mm,降雨期集中在78月份;年平均日照在2500小时,无霜期在135140天,最大冻深1.97m。松花江流域位于中华人民共和国东北地区北部,松花江流域介于北纬41425138、东经11952-13231之间,东西长920公里,南北宽1070公里,流域面 积55.68万平方公里,历年最高水位120.89 m,
10、最低水位110.07m,平均水位115.52m,地下水埋藏深度距地表1-15m。2.4 工艺及工艺流程从污水特点,解决规定与限度和工艺特性入手,对各种工艺进行比较,经分析比较后,选取最优方案进行后续设计计算。对预选方案进行细致研究和比较,拟定黑龙江哈尔滨市15万m3/d污水解决厂设计工艺为A/O法。其工艺流程如下图:3. 设计规范、原则中华人民共和国环保法;中华人民共和国水污染防治法;城乡污水解决厂污染物排放原则GB 18918;给水排水设计手册(第二版)等一系列设计书册; 其他有关专业书籍; 网络特别是万方、中华人民共和国知网等某些中华人民共和国知名检索网站。4. 设计成果重要构筑物见表1-
11、1表1-1重要构筑物一览表序号名称规格(mmm)数量1 中格栅5.073.91.3142 提高泵房122.54.213 细格栅2.330.351.2224 曝气沉砂池1076.1345 初沉池287.0446 缺氧池47.39847 好氧池47.327848 混合液回流泵房6719 配水井0.241.2110 辐流式二沉池508.2811 回流污泥泵房8 6 112 污泥浓缩池156.79213 污泥贮泥池12.112.15214 脱水车间20 15 1核心词都市污水解决;A/O工艺;污水解决厂General Design Introduction1 . Designed to require
12、,in principle1.1 Background of Project Proposal necessity and investmentHarbin is the capital city of northeastern Heilongjiang province ,with the rapid development of urbanization and accelerate economic construction ,urban sewage emissions have increased rapidly,a large number of uncontrolled disc
13、harge of untreated sewage ,if not handled properly ,will cities and water cause serious environmental pollution affecting the sustainable development of human settlements and urban environmental quality of our country s water resources situation is quite difficult situation ,the river flows through
14、all the citys more than 90% received moderate or more severe pollution ,50% of the urban river water undrinkable . In addition to a large number of rivers of sewage outside has lost another utility. Many major lakes are eutrophic stage at different times.According to the environmental department of
15、the national water quality of rivers,lakes,reservoirs monitoring,due to recent industrial wastewater and urban sewage discharge and other reasons,the main river water in Harbin have been polluted to varying degrees. Meanwhile ,a large number of industrial wastewater and untreated sewage is discharge
16、d directly into the waters ,it is seriously contaminated ,resulting in the river creatures ,plants mostly disappeared,destroyed the natural landscape,urban pollution downstream groundwater sources ,seriously restricting the economic development . To improve the environment,water pollution control,co
17、nstruction of urban sewage treatment works is imperative.1.2 A / O process settings to achieve effluent discharge standardsShall conform to the urban sewage treatment plant pollutant discharge standard (GB18918-) an A standard. Namely:EffluentCODBOD5NH4NSSpHTPUnit (mg / L)50105(8)(15)106911.3 Design
18、 PrinciplesThe purpose is to make the citys sewage treatment discharge standards for wastewater reuse or make the environment from pollution,the treated effluent reuse for irrigation,urban landscape or industrial production,so as to conserve water resources. Urban sewage treatment and pollution cont
19、rol technology policy on the sewage treatment process selection criteria given in the following items on urban wastewater treatment process selection:(1) Urban sewage treatment process should be handled in accordance with the scale,quality characteristics,receiving water environment functions and lo
20、cal realities and requirements,after a comprehensive technical and economic comparison priorities identified .The main technical and economic indicators.(2) Process selection include:water treatment unit investment,investment pollutant reduction units,water treatment units power consumption and cost
21、,power consumption and pollutant reduction of unit costs,footprint,performance,reliability,ease of management and maintenance,the overall environmental benefits.(3) Should be practical to determine effluent water quality,process design parameters must be the priority status of sewage,water features,
22、pollutants constitute a detailed investigation or determination to make a reasonable analysis and forecasting.(4) The composition of the water when complex or special,dynamic testing of sewage treatment process,where necessary,to carry out pilot studies;(5) Actively efficient and economical use of n
23、ew technology,new technology applications in the country for the first time must pass the test and production test,providing reliable design parameters,and then use.2. Project Overview2.1 design scales:Q = 15 million m3 / d,the coefficient of variation:Kz = 1.32.2 Jin,water qualityWater qualityCODBO
24、D5NH4NSSTPUnit (mg / L)230150281802.5Water should be in line with the urban sewage treatment plant pollutant discharge standard (GB18918-) an A standard. Namely:EffluentCODBOD5NH4NSSpHTPUnit (mg / L)50105(8)(15)106912.3 meteorological,hydrological and geological conditionsHarbin belong in humid temp
25、erate continental monsoon climate,the climate is characterized by winter in the polar continental air mass control,the weather is cold,dry,summer affected by the Pacific subtropical air masses,precipitation concentration,mild climate,humid. There are obvious seasonal climate changes,warmer spring fa
26、st and windy,annual dominant wind southwest wind. The annual average temperature 3.6 ,the lowest temperature of -38.1 ;annual average rainfall of 553.5mm,rainfall concentrated in the period from July to August ;annual average sunshine at 2500 hours ,frost-free period of 135 to 140 days,the maximum f
27、rost depth 1.97m.Songhai River basin is located in the northern part of northeast Chinese Songhua River basin between latitude 41 42 51 38,longitude 119 52-132 31 ,920 km from east to west,north-south width of 1070 km,watershed area of 556,800 square kilometers,over the highest water level 120.89 m,
28、the lowest level 110.07m,the average water level 115.52m,buried depth of groundwater from surface 1-15m.2.4 Process and ProcessFrom the characteristics of sewage requirements and the extent and characteristics of the treatment process start to compare a variety of processes,after analysis and compar
29、ison,choose the best program for subsequent design calculations. Preselection scheme for detailed study and comparison to determine Harbin,Heilongjiang 150000 m3 / d wastewater treatment plant design process for the A / O method. 1 前言1.1 设计背景1.1.1 国内污水解决背景国内是人口大国,在其经济迅猛发展同步,也带来了新环境污染问题,水环境污染是最备受关注和解
30、决问题之一。废水进入环境后,对人体,水体,土壤,动物等产生巨大危害,严重影响人与自然和谐共存,对环境导致不可逆转危害,因而,咱们必要注重对废水危害,加强对废水解决力度,尽量减少其对环境危害,为人与环境和谐共存创造有利条件。国内都市污水解决相对于国外发达国家、起步较晚。近2来,都市污水解决已从原始自然解决、简朴一级解决发展到运用各种先进技术、深度解决污水,并回用。解决工艺也从老式活性污泥法、氧化沟工艺发展到A/O、A2/O、AB、SBR(涉及CCAS工艺)等各种工艺,以达到不同出水规定。虽然如此,国内污水解决还是落后于许多国家。在咱们大力引进国外先进技术、设备和经验同步,必要结合国内发展,特别是
31、本地实际状况,摸索适合国内实际都市污水解决系统。1.1.2 哈尔滨市背景资料哈尔滨市,面积10301平方公里,人口300万,都市发展方向为以老城为依托,以疏港公路为轴线,向南发展。并逐渐向经济技术开发区发展。随着都市及工业发展,都市污水排放量也在逐年增长,至城北排放未经解决污水排放量已达10万吨/日左右。大量工业废水和生活污水未经解决直接排入河流,使河流受到严重污染,致使河水中生物、植物大某些绝迹,破坏了自然景观、污染城区下游地下水源。为改进环境,治理河水污染问题,建设都市污水治理工程势在必行。1.1.3 设计资料都市污水解决厂设计规模与进入解决厂污水水质和水量关于,污水水质和水量可以通过设计
32、任务书原始资料计算。1.1.4 污水特性本项目污水解决特点:污水以有机污染物为主,BOD/COD=0.65,可生化性较好,采用生化解决最为经济。BOD/TN5.36,COD/TN8.21,满足反硝化需求;若BOD/TN5,氮去除率不不大于60%。1.2 都市污水解决厂工艺选取原则国内都市污水解决相对于国外发达国家、起步较晚。近2来,都市污水解决已从原始自然解决、简朴一级解决发展到运用各种先进技术、深度解决污水,并回用。解决工艺也从老式活性污泥法、氧化沟工艺发展到A/O、A2/O、AB、SBR(涉及CCAS工艺)等各种工艺,以达到不同出水规定。虽然如此,国内污水解决还是落后于许多国家。在咱们大力
33、引进国外先进技术、设备和经验同步,必要结合国内发展,特别是本地实际状况,摸索适合国内实际都市污水解决系统。国内都市污水解决技术随着水污染控制与环境治理实践,在吸取国外技术经验同步,结合国内国情特点,逐渐改进提高,初步形成了某些合用技术路线,重要如下:(1)对老式活性污泥法进行改造或予以取代后人工生物净化技术路线;(2)以自然生物净化为主人工生物净化与自然生物净化相结合技术路线;(3)以污水扩散排放为主,解决为辅技术路线;(4)以回用为目污水深度解决技术路线。结合该污水解决工程详细状况分析进行选取:一方面,(3)和(4)这两条技术路线对于自然环境条件因素规定较高,从而不可取,因此应选取(1)和(
34、2)这两条路线,特别以(2)这种路线应予以推广。由于随着环境状况日趋严峻,用水问题越发突出,从而对雨水合理使用必将使人们特别注重课题,因此,下面着重分析以自然生物净化为主与人工生物净化相结合技术路线和对老式活性污泥法进行改造或予以取代活人工生物净化虽然路线。人工生物净化与自然生物净化相结合技术路线,对于大规模污水解决厂来说,重要指氧化塘解决和土地法解决,它们都具备运营费用低,外加能源消耗少和管理简朴长处,在国内某些都市也被因地制宜采用。氧化塘普通分好氧氧化塘、厌氧氧化塘、兼性氧化塘,它们所需要停留时间都很长,普通需要几天到几十天,占地面积很大,并且对周边环境卫生影响较大,需要慎重考虑,因此,在
35、没有低洼地可运用状况下,若购买占用大量良田,平地筑塘是很不经济,本工程状况不适当采用氧化塘解决。土地法解决,就是按照规定对污水达到解决同步,达到对控制渗流污染规定,有筹划将污水排放到大面积土地上下渗,运用土壤过滤、吸附、分解以及土壤微生物代谢能力等物理、化学、生物化学等作用,使污水达到净化。这种仿有助于污水中水肥资源运用和土壤微粒构造改进,但是,这种解决需要辽阔土地面积,并且要注意对地下水污染问题。在国内人均土地面积局限性状况下,土地法解决必要与污水灌溉合理结合,污水灌溉在农业增产方面获得了明显成绩,但是,这只是对污水灌溉运用,和污水土地运用解决尚有一定差距。重要体当前:(1)污水灌溉按土地解
36、决污水规定控制水量、水质,但对有些地下水以及其他水源、水体仍会导致污染;(2)由于灌溉季节性变化和灌溉面积限制,不能做到长年昼夜对污水解决;(3)没有通过严格水质控制灌溉,往往会导致对粮食作物,特别是对蔬菜作物使用质量影响,这重要来自某些重金属污染;因此,污水灌溉作为对恰当解决获得都市污水有效运用,无疑是非常有价值,但作为对污水完善土地解决,从而取代其他污水解决办法,在本工艺详细条件下,此办法也许不可行。(1)对地下水源有污染危险;(2)做不到长年昼夜对污水解决;(3)没有也不也许修建储存几种月污水量大容量调节池,非灌溉季节排放问题无法解决。综上所述,以自然生物净化为主人工生物净化与自然生物净
37、化相结合路线,本工程不具备采用条件,固然也就不适当采用。人工净化就是人为创造条件,使微生物大量繁殖,提高微生物净化效率,重要涉及活性污泥法与生物膜法,其中以活性污泥法采用较为普遍,是当前国内外都市污水解决主体工艺。老式活性污泥法有较丰富实践经验和技术资料、运营可靠、解决效果好,但是也存在能活较多和费用高等特点,因此对其流程改革更新后,浮现了AB工艺,氧化沟法,SBR间歇活性污泥法,A/O脱氮工艺,A2/O同步脱氮除磷工艺等惯用工艺,它们各自具备相对不同长处。结合本工艺详细状况,本污水厂还规定高效脱氮除磷,惯用办法有AB法,SBR,A2/O法,氧化沟工艺等。1.3 工艺流程及各种工艺优缺陷对比1
38、、A/O工艺 A/O是Anoxic/Oxic缩写,它优越性是除了使有机污染物得到降解之外,还具备一定脱氮除磷功能,是将厌氧水解技术用为活性污泥前解决,因此A/O法是改进活性污泥法。A/O工艺将前段缺氧段和后段好氧段串联在一起,A段DO不不不大于0.2mg/L,O段DO=24mg/L。在缺氧段异养菌将污水中淀粉、纤维、碳水化合物等悬浮污染物和可溶性有机物水解为有机酸,使大分子有机物分解为小分子有机物,不溶性有机物转化成可溶性有机物,当这些经缺氧水解产物进入好氧池进行好氧解决时,可提高污水可生化性及氧效率;在缺氧段,异养菌将蛋白质、脂肪等污染物进行氨化(有机链上N或氨基酸中氨基)游离出氨(NH3、
39、NH4+),在充分供氧条件下,自养菌硝化作用将NH3-N(NH4+)氧化为NO3-,通过回流控制返回至A池,在缺氧条件下,异氧菌反硝化作用将NO3-还原为分子态氮(N2)完毕C、N、O在生态中循环,实现污水无害化解决。(1)A/O内循环生物脱氮工艺特点a.效率高。该工艺对废水中有机物,氨氮等均有较高去除效果。当总停留时间不不大于54h,经生物脱氮后出水再通过混凝沉淀,可将COD值降至100mg/L如下,其她指标也达到排放原则,总氮去除率在70%以上。b.流程简朴,投资省,操作费用低。该工艺是以废水中有机物作为反硝化碳源,故不需要再另加甲醇等昂贵碳源。特别,在蒸氨塔设立有脱固定氨装置后,碳氮比有
40、所提高,在反硝化过程中产生碱度相应地减少了硝化过程需要碱耗。c.缺氧反硝化过程对污染物具备较高降解效率。如COD、BOD5和SCN-在缺氧段中去除率在67%、38%、59%,酚和有机物去除率分别为62%和36%,故反硝化反映是最为经济节能型降解过程。d.容积负荷高。由于硝化阶段采用了强化生化,反硝化阶段又采用了高浓度污泥膜技术,有效地提高了硝化及反硝化污泥浓度,与国外同类工艺相比,具备较高容积负荷。e.缺氧/好氧工艺耐负荷冲击能力强。当进水水质波动较大或污染物浓度较高时,本工艺均能维持正常运营,故操作管理也很简朴。通过以上流程比较,不难看出,生物脱氮工艺自身就是脱氮同步,也降解酚、氰、COD等
41、有机物。结合水量、水质特点,咱们推荐采用缺氧/好氧(A/O)生物脱氮(内循环) 工艺流程,使污水解决装置不但能达到脱氮规定,并且其他指标也达到排放原则。(2)A/O工艺缺陷a.由于没有独立污泥回流系统,从而不能培养出具备独特功能污泥,难降解物质降解率较低;b.若要提高脱氮效率,必要加大内循环比,因而加大了运营费用。此外,内循环液来自曝气池,具有一定DO,使A段难以保持抱负缺氧状态,影响反硝化效果,脱氮率很难达到90。2、A2/O工艺A2/O工艺是Anaerobic-Anoxic-Oxic英文缩写,它是厌氧-缺氧-好氧生物脱氮除磷工艺简称。该工艺解决效率普通能达到:BOD5和SS为90%95%,
42、总氮为70%以上,磷为90%左右,普通合用于规定脱氮除磷大中型都市污水厂。但A2/O工艺基建费和运营费均高于普通活性污泥法,运营管理规定高,因此对当前国内国情来说,当解决后污水排入封闭性水体或缓流水体引起富营养化,从而影响给水水源时,才采用该工艺。(1) A2/O工艺特点a.污染物去除效率高,运营稳定,有较好耐冲击负荷。 b.污泥沉降性能好。c.厌氧、缺氧、好氧三种不同环境条件和不同种类微生物菌群有机配合,能同步具备去除有机物、脱氮除磷功能。d.脱氮效果受混合液回流比大小影响,除磷效果则受回流污泥中夹带DO和硝酸态氧影响,因而脱氮除磷效率不也许很高。e.在同步脱氧除磷去除有机物工艺中,该工艺流
43、程最为简朴,总水力停留时间也少于同类其她工艺。f.在厌氧缺氧好氧交替运营下,丝状菌不会大量繁殖,SVI普通不大于100,不会发生污泥膨胀。(3)A2/O工艺缺陷反映池容积比A/O脱氮工艺还要大;污泥内回流量大,能耗较高;用于中小型污水厂费用偏高;沼气回收运用经济效益差;污泥渗出液需化学除磷。3、SBR工艺在反映器内预先培养驯化一定量活性污泥,当废水进入反映器与活性污泥混合接触并有氧存在时,微生物运用废水中有机物进行新陈代谢,将有机物降解并同步使微生物细胞增殖。将微生物细胞物质与水沉淀分离,废水即得到解决。其解决过程重要由初期去除与吸附作用、微生物代谢作用、絮凝体形成与絮凝沉淀性能几种净化过程完
44、毕。(1)SBR工艺特点a.抱负推流过程使生化反映推动力增大,效率提高,池内厌氧、好氧处在交替状态,净化效果好。b.运营效果稳定,污水在抱负静止状态下沉淀,需要时间短、效率高,出水水质好。c.耐冲击负荷,池内有滞留解决水,对污水有稀释、缓冲作用,有效抵抗水量和有机污物冲击。d.工艺过程中各工序可依照水质、水量进行调节,运营灵活。e.解决设备少,构造简朴,便于操作和维护管理。f.工艺流程简朴、造价低。主体设备只有一种序批式间歇反映器,无二沉池、污泥回流系统,调节池、初沉池也可省略,布置紧凑、占地面积省。(2)SBR工艺缺陷间歇周期运营,对自控规定高;变水位运营,电耗增大;脱氮除磷效率不太高;污泥
45、稳定性不如厌氧硝化好。3、AB工艺AB法A段效率很高,并有较强缓冲能力。B段起到出水把关作用,解决稳定性较好。对于高浓度污水解决,AB法具备较好合用性,并有较高节能效益。特别在采用污泥消化和沼气运用工艺时,优势最为明显。B法工艺中重要解决构筑物有A段曝气池、中间沉淀池、B段曝气池和二次沉淀等,普通不设初次沉淀池,以A段为一级解决系统。 A段和B段拥有各自独污泥回流系统,因而有各自独特微生物种群,有助于系统功能稳定。但是,AB法污泥产量较达,A段污泥有机物含量极高,污泥后续稳定化解决是必要,将增长一定投资和费用。此外,由于A段去除了较多BOD,也许导致炭源局限性,难以实现脱氮工艺。对于污水浓度较
46、低场合,B段运营较为困难,也难以发挥优势。(1)重要特性具备优良污染物去除效果,较强抗冲击负荷能力,良好脱氮除磷效果和投资及运转费用较低等。对有机底物去除效率高;系统运营稳定。重要体当前:出水水质波动小,有极强耐冲击负荷能力,有良好污泥沉降性能;有较好脱氮除磷效果;节能。运营费用低,耗电量低,可回收沼气能源。经实验证明,AB法工艺较老式一段法工艺节约运营费用20%25%。(2)缺陷:缺陷一:A段在运营中如果控制不好,很容易产生臭气,影响附近环境卫生,这重要是由于A段在超高有机负荷下工作,使A段曝气池运营于厌氧工况下,导致产生硫化氢、大粪素等恶臭气体。缺陷二:当对除磷脱氮规定很高时,A段不适当按AB法本来去处有机物分派比去除BOD55%60%,由于这样B段曝气池进水含碳有机物含量碳、氮比偏低,不能有效脱氮。缺陷三:污泥产率高,A段产生污泥量较大,约占整个解决系统污泥产量80%左右,且剩余污泥中有机物含量高,这给污泥最后稳定化处置带来了较大压力。表 1-1几种常用工艺对比表工艺类