收藏 分销(赏)

某国330kv线路说明工程.doc

上传人:精*** 文档编号:2269076 上传时间:2024-05-24 格式:DOC 页数:50 大小:519KB 下载积分:16 金币
下载 相关
某国330kv线路说明工程.doc_第1页
第1页 / 共50页
某国330kv线路说明工程.doc_第2页
第2页 / 共50页


点击查看更多>>
资源描述
EPC of ABC 330kV D/C TRANSMISSION LINE PROJECT Construction Management Plan ABC Co., Ltd April 5,2010 Prepared: Checked: Approved:       50 Chapter 1 Project Overview and Features 1. Project overview and features 1.1 Project overview Lot 1 330kV A - B DC Line ( that is 286m in length ) ( hereinafter referred to as “AB Project”) is a project invested by NDPHC. 1.1.1 Length, voltage grade and erection type of the line ABProject is located in the central area of N NATIONAL starting from A Substation in the south and ending in B substation in the north with the length of 279.449km. The project is located above sea level between 100m and 1300m with the voltage grade of 330kV. The double-circuit line will be erected on the same tower and self-supporting angle steel towers will be employed for the line. 1.1.2 Conductor, ground wire, OPGW and insulator The conductor will be twin bundled and horizontally arranged with the model of BISON. The ground wires will be GJ-60 galvanized stranded wire and OPGW respectively. Glass insulators will be employed for the line. Twenty FC120/146 glass insulators will be employed in the tangent tower and 2X22 FC160/146 glass insulators in the strain tower. 1.1.3 Fountation type and earthing Oblique Angle Inserted Foundation and horizontally radial earthing. 1.2 Analysis of construction condition 1.2.1 Construction condition at the site ● Medium sand, crushed stone resources are available along the line. Appropriate sand, stones may be provided. ● Influenced by climatic conditions, it is difficult to construct in rainy season at location of this project. Rainy season should be evaded as far as possible. However, since part of construction period for this project is arranged in rainy season. Preparations should be made for the construction proposal in rainy season. Construction period of the procedures should be arranged reasonably. Adverse factors should be considered sufficiently to ensure construction period progress target. To make sufficient preparation for construction in rainy season and to provide effective drainage equipment and excavation retain equipment. ● Since infrastructure is backward in N NATIONAL, local health care conditions are poor, there are many mosquitoes, malaria morbidity is high, necessary medical equipment should be provided and necessary medical training should be provided for employees during construction. Common medications, antimalarials and injection should also be provided. Since tap water treatment condition is unavailable locally, water permeability in the soil is high. Almost all ground water cannot be drunk directly. Domestic water should adopt purified water as far as possible, or water treated. ★ material resources conditions ● Construction material resources in A City, C and B City are basically abundant, but relative quality is poor. Chapter 2 Organizational Framework of Project Construction Management 2.1 Organizational structure of project management and responsibility division 2.1.1 Organizational structure of project management In order to complete this project successfully, our company organized N NATIONALn Project Management Department. Main management personnel of the Project Management Department are dispatched from technical management personnel of the company. “330kV D/C TRANSMISSION LINE Project Management Department” is organized. On behalf of M COMPANY/CHEMO, the Project Department is responsible for the Client and Consultant and fulfills the contract comprehensively to realize the project objectives. Transmission Line construction Management Department Project manager : Deputy Project Manager: Chief Project Engineers: Technical Control Principal C Material Principal Plan and Finance Principal Li Quality Principal Safety Principal C Fig. 2-1 Organization chart of project management and construction Construction Team 1 Manager Y Construction Team 2 Manager Construction Team 3 Manager 2.1.2 Responsibility and work division Table 2 - 1 Department & post Responsibility and authority Company Head Office 1. Dispatching project manager and chief project engineer with strong management capability, business skills and rich experience to organize A & B Substation Project Department according to the scale and features of this project; 2. Organizing to prepare Project Construction Organization Measures, Responsibility Documents of Construction Project Management, define obligations, responsibilities and rights of the project manager and functional departments of the company in this project; 3. Allocating construction resources such as labor force, material resources, equipment etc of Project Management Department, guaranteeing to meet project implementation requirements; guaranteeing implementation of the funds required for the project. The company and relevant departments should ensure to solve requirements of the Project Department timely. Project Manager 1. Agent of the company’s legal representative in this project, manages the overall construction process of this project on behalf of the company, responsible for comprehensive fulfillment of the contract. Implementing the company’s quality, safety and environment management guidelines, Quality Manual, Occupational Safety and Health and Environment Management Manual as well as documents of relevant procedures during project construction, completing project tasks according to provisions of the contract, accepting inspection and supervision by the owner unit, consulting engineer, dealing with and coordinate relationship between the parties concerned, creating good environment and conditions for project construction, achieving project management objectives comprehensively; 2. Fulfilling tasks specified in the Responsibility Documents of Construction Project Management; 3. Organizing to prepare and implement Project Construction Organization Measures; 4. Implementing according to the company’s quality, safety and environmental protection management guidelines, quality, safety, environmental protection objectives of this project as well as requirements of the company’s quality, safety, environmental protection management system documents. 5. Allocating construction resources rationally, taking full responsibility of safety, quality, construction period objectives for this project; 6. Responsible for construction quality monitoring, safety supervision and civilization, organization management of environmental protection construction; 7. Grasping plan, financial and funds situation, instructing Planning and Finance Department to arrange funds reasonably according to the construction schedule and implementation status of funds plan; 8. Implementing commands of the owner unit, consulting engineer related with project quality, safety and construction progress etc effectively during construction; 9. Implementing management works of safe, civilized construction and environmental protection. Dealing with follow-up work after the project is completed. Deputy Project Manager Under the leadership of the project manager, assisting the project manager to complete all works of project manager within his responsibility scope. Responsibility and authority Chief project Engineer 1. Chief project engineer is the chief technical superintendent of this project, responsible for technical management work according to relevant technical standards, regulations, regulations, design drawings as well as related technical management system of this company, responsible for management and application of MS Project software in this project; 2. Organizing to prepare quality plan, construction organization design, project construction proposal, technology, overall measures planning of safety, civilization and environmental protection construction etc for this project, examining or approving them according to the specified authority; 3. Organizing the joint checkup of construction drawing, coordinating related work with individual departments and units; 4. Responsible for technical training and evaluation work before commencement of this project, verifying commencement conditions; organizing and implementing construction process control according to quality plan as well as related management system procedure document of the company; 5. Taking direct responsibilities for the quality of this project, assuming technical responsibilities for project safety; 6. Responsible for timeliness, accuracy of the final acceptance data. Technique Principal 1. Assisting chief engineer to manage the implementation of project technical work, examining construction drawing, reading design documents and construction drawings carefully, understanding design intention, preparing quality plan, construction organization design and construction technology, safety measures; 2. Preparing Construction Guide Book, safety construction measures and construction technique manual, as well as their release and management; responsible for site design document, management and release of construction drawings; providing construction technology and safety intention explanation for construction personnel, instructing construction according to relevant procedure documents; organizing the sorting and handover of project completion data, supervising and instructing construction team to fill out various construction record forms correctly; 3. Accepting and executing the commands of consulting engineer related with design change and technical requirements, organizing the implementation; 4. Participating in the purchase inspection of engineering materials, coordinating with the special person for materials to prepare supply plan of machines, tools and materials, coordinating with quality control, safety supervision personnel to supervise and check construction quality and safety; Quality Control Principal 1. Assisting chief engineer to manage the implementation of project quality control: supervising works quality in accordance with Consultant’s instruction and corresponding quality control standard, organizing and participating quality inspection on construction team and project management, compiling quality scheme, fulfilling quality management to make sure quality management system operate effectively. 2. Applying intermediate acceptance and final acceptance to the consulting engineer, participating in the acceptance; 3. Participating in the purchase inspection of engineering materials, coordinating with the special person for materials to prepare supply plan of machines, tools and materials, coordinating with quality control, safety supervision personnel to supervise and check construction quality and safety; Safety Management Principal 1. Responsible for construction safety management; 2. Responsible for safety education and post training of construction personnel; 3. Organizing inspection test of tools, apparatus and mechanical equipment; 4. Organizing to implement project safety health and environment management work to ensure effective operation of project occupational safety and health and environment management system; 5. Supervising and instructing construction team to fill out various safe construction record forms correctly; 6. Submitting safety supervision work report to the project manager; 7. Commissioned by the project manager, presiding over safety accident investigation, submitting investigation report, putting forward correction opinions. Plan and Finance Principal 1. According to the project schedule, managing labor force and funds etc resources, project contract management, budget management and cost control, formulating project disbursement plan; 2. According to the construction progress, resource utilization and funds utilization, using MS Project management software for collection, analysis and sorting of implementation record, preparing adjustment plan at stages; 3. Sorting out and summarizing various reports required by Head Office and consulting engineer, reporting to the owner, consulting engineer and Company Home Office on specified time. Materials Principal 1. Establishing and completing management systems of on-site materials, tools and equipment according to requirements of related quality system procedure documents, managing on-site materials, tools and equipment; 2. Formulating configuration plan of tools, apparatus and equipment according to the construction schedule and construction proposal, organizing implementation; 3. According to the project schedule of construction organization design and physical supply time provided by general contract unit, formulating engineering goods and materials supply plan and organizing the implementation; 4. Receiving and sorting out materials quality certification, test report; 5. Organizing purchase, processing of engineering materials; 6. Responsible for receiving, keeping, releasing management of materials. Construction team leader 1. The person responsible for management work of this construction team, organizing construction of the personnel according to Construction Organization Design and Construction Guide Books, organizing self-check, ensuring construction in controlled state, takes full responsibility of construction quality, safety, progress, cost and civilized construction etc in this team; 2. According to construction arrangement of the Project Department, organizing to complete construction task in the designated construction section; 3. Implementing various work instructions, safety, quality and civilized construction provisions issued and forwarded by the Project Department during construction. 4. Organizing to implement quality, safety activities during construction, correcting problems in the construction timely, taking preventive measures as required; 5. Achieving engineering management objectives in the construction section. Construction personnel 1. Operating according to requirements of the work instructions under the leadership of construction team leader, abiding by organization disciplines and technical regulations on construction site, ensuring works to meet project construction requirements; 2. Participating in the quality, safety activities, participating in democratic management of the team, adjustment rationalization proposal actively. Chapter 3 General Layout Plan of the Construction Site 3.1 Construction layout plan 3.1.1 Principle 1) The location of Project Management Department The location of Project Management Department is in C and construction teams
展开阅读全文

开通  VIP、SVIP  下载更划算
下载10份以上建议开通 VIP 会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 考试专区 > 中考

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        关注我们

©2010-2026 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服