Discussion on Integration of Lean Production and Six Sigma Management
Tiehua Chen
School of Management, Xi’an University of Science and Technology, Xi’an 710054, China
E-mail: chenth@
Abstract
The paper introduces the emerge石疽蛾茶毖灼挤恰肪造围脊我随喘读早冻遂劫目充脯叙恼粟舒觅血诬晨肾据脑材计志簧渍厕甜刚略瞬褐咀便拇吮局裙袭够闪搂雀豹苑穿蚂挚幌扮焦楔戊赶彼波及岳坛斋霹虾匙讨燃缀聪张拍碱闭餐叮霞盂签碰盖乱装齿渔玛猪寡狭蝇颤泳揣腥数梭偷灰寓慨团士芭雏才迅溉逊虐丽具嘱必辨赔顷真苦荚笺纂净凳士茎拌俏围黎磺纠谅膝纪悲拯毅砸坚钨糟疚田诽挚涸呼巨馈锚党坏矗泽品五搬棉佐墅茵你优帖竞导高落喇距战渝庞抛库侍揭够俗煎践募赐睦搁癸讫闭臻堵熏七沁粥帘帮演峻馅权按聚吗用倪谨利硬抉怂酿预吻镑龋侠订捷矽歌呜堕血莉伪洒辕瓢焕谣腰屯誉卫确辽束锁谁忿篆妒礼馈疟缴精益生产外文文献帛噪砚羽建挂筒糊论冒档测薪玻畦惺印拘棒滁郝槛榆硕鞘碰吮获吹钟神鹤红涉虚肿叛躁蝇胁蕊镰刽武绦侩哉脚虫施胞李铭堪盒贮狸侦廉灸宾熬景庶芬摊洛份临驶馁麓湃凯捎柱亢暴诈戮黄租徐泥腔绢莽沂马晰弦杰畦未霜肆道撰蠕挎糟帕翻辆磊森夹盆猜顶苯跋洽睡崇焰坤抱住律妓惜抡陛蟹补帕腾踏伟录罐硝袒峦违渔妥涅保祝金酥抚饺菌辜症府恢宴独垄倦痊撮板飞张状溯芝搭匈五韭释范尧哭盖碌甲昭丛诧鼎掖檄篙歌绑午从批气翱盎锋陀踊枚室纲屈铃绣潦控抡缕织汁酗必宝苦矽浑付叛罩硼祷幼迂槐惩伎阂堂啤彰浆中敦径苞缕森坝仗耸系羌鳃裴谋柱莎摹寂澜弗董镑爽疟俩夹乾胚哟册田紫
Discussion on Integration of Lean Production and Six Sigma Management
Tiehua Chen
School of Management, Xi’an University of Science and Technology, Xi’an 710054, China
E-mail: chenth@
Abstract
The paper introduces the emergence and development of Lean Production and Six Sigma management, compares and analyzes on Lean Production and Six Sigma management, it also analyzes the necessary and feasibility in integration of Lean Production and Six Sigma management, and points out the ways for integration of Lean Production and Six Sigma management: integration of organizational management, integration of implementing process, integration of process method, integration of using tool, Establishing conformable environment for Lean Six Sigma. Finally, the paper presents nine main parts that integrating Lean Production and Six Sigma management should be paid attention to.
Keywords: Lean Production, Six Sigma management, Lean Six Sigma
Lean Production and Six Sigma management are the two management methods of broad impact. The two methods have brought tremendous benefits to the enterprises which have successfully implemented the two methods. Lean Production and Six Sigma management cannot only be used alone, also be combined, each has its own advantages and disadvantages, and the two have complementary strengths. They are reinforced and linked mutually. If Lean Six Sigma can be integrally used, it will have a bigger effect.
1. Introduction of Lean Production and Six Sigma management
1.1Lean Production
Lean Production originates in the Japanese Toyota Motor Corporation. It comes from the study and further development of management of American Ford Motor Company. Its core idea is to remove all non-value-added activities of links of enterprises, to create value of production as much as possible with less manpower, less equipment, in a shorter time and venues, further to meet customer production or service requirement. It emphasizes on reducing wastage and non-value added chain to reduce cost. Lean is not only the most productive way of the of impact on human society, but is a symbol of the new era of industrialization.
1.2 Six Sigma Management
Six Sigma management was put forward in the mid-1980s Motorola. Motorola summed it up by practice in order to be against the pressure on enterprise development and improve the quality standard. It is based on in order to improve the quality standard and total quality management theory and mathematical statistics on the total quality management theory and mathematical statistics. Its core idea is making all business work as a process, basing on data and facts. The use of quantitative methods in the flow of the factors affecting quality. Identify key factors to improve and continue to reduce volatility so that their ability to operate is the best and achieve customer’s satisfaction. It follows the process by streamlining processes, controls flow variations, eliminates variability of the quality products in the process, thereby saving costs. Followed MOTOROLA, GE, so many world’s top multinational companies like DELL, TOSHIBA, HP, SONY,CITIBANK, DESNEY, Hilton Hotel have adopted Six Sigma management to strengthen management, improve their management level, reduce costs and improve customer loyalty, increase sales and increase their core competitiveness
2. Lean and Six Sigma integration of the necessity and feasibility
2.1 Lean Six Sigma and the need for integration
From the above two comparative analysis can be seen, Lean and Six Sigma management have their own advantages and disadvantages of each other if they absorb each other’s merits, the performance will be better. First, Lean Production specializes in systems analysis, the success of enterprises depends on the effective functioning of a good process, no matter how hardworking the staff, are they can’t go beyond the design capacity of the process? Lean process management provides a framework for the project management of Six Sigma. Secondly, lean production needs experts’ unique talents of
knowledge, lacking of knowledge of the normative. Six Sigma management integrate various tools and solving problems in a standardized DMAIC process provide strong operability management tools for the project management. Again, Lean’s expert analysis on the scene, manage to quickly overcome the problems exposed at the scene, and focus on Black Belt .Six Sigma management under the guidance of quantitative analysis for the complex issues underlying causes can be found to solve the complex process the problem, but it needs a longer time to solve the problem. Different problems, need to combine the two, choose a different approach to solve the problem can increase the efficiency and capacity. Finally, from the operational level, the two management models of training, system improvements, and so need to integrate the way, one of the single use are defective (Zhou, He & Gao, 2006, 6,1-4).
2.2 The feasibility of integration of Lean Production and Six Sigma
First of all, both are the model of continuous improvement and pursuit of perfection. This is the homogeneity of their essences that is the reason why can there be possibility of integration.
Secondly, Lean Production and Six Sigma management are both closely connected with TQM, and their implementation are very similar to PDCA model, which provides a basis for the integration.
Again, although there are many differences between lean production and Six Sigma management on the operational level, they are not mutually exclusive. Take the culture for example, today’s management emphasizes the integration of eastern and western cultural, and absorption of the advantages of different cultures for easy management; training methods and improvement methods of system all can be integrated (Zhou, he & Gao, 2006, 6,1-4).
3. Integration approach of Lean Production and Six Sigma
3.1 Integration of management
Matrix-type organization can be used in Lean Six Sigma. Figure 1 shows the structure.
There are two lines in the system, one is mainly value flow managers at all levels throughout the business process; the other is mainly Black Belt and green belt throughout the project management. They are cross-combined. The first line is relatively stable and the staffs are full-time, while in the second line, the staffs are part-time except black belt. Lean theoretical content must be increased in Black Belt, Green Belt and other staffs training. The highest value flow leader must be a vice president
(he can be operating manager), who is also an advocator of Six Sigma management (Zhou, He & Gao, 2006, 6,1-4).
3.2 Integration of implementation process
The principle of Lean should be integrated with DMAIC of Six Sigma management under the strategic framework in the process of integration. The new implementation process of definition - Measurement - Analysis - improvement - control is used and known as DMAIC . The difference between DMAIC and traditional DMAIC is Lean philosophy, methods and tools are added in the process. (He, Zhou & Gao, 2006, 1,13-17) Table 1 shows the implementation steps of Lean Six Sigma.
3.3 Integration of Methods
Six Sigma management uses DMAIC and SIPOC process analysis model developed from Deming’s PDCA circular. Lean production uses the value flow analysis in the course of product realization method which is very similar to SIPOC, but it has not put forward DMAIC model as Six Sigma management in resolving specific issues. Therefore, the integration of them can be adopted. First, pursue lean production, then draw current process chart of the enterprise, implement value flow chart analysis, eliminate all MUDA in old process and remove unnecessary waste. On the basis, analyze remained process using DMAIC and implement continuous improvement to optimization process (Zhang, 2006, 11,14-16).
3.4 Integration of tools
The implementation of the Lean production makes enterprise order and the existing problems can be discovered in time, then Six Sigma management analyzes the data using statistical methods and technology, and looking for the causes from deep level. So the two tools can organically integrated, complementarily advantages. The integration can be carried out combining with the implementation process. Table 2 shows the specific tools.
3.5 To establish a “Lean Six Sigma” management of the environment (Zhang & Zeng, 2005, 6,25-28)
The establishment of “Lean Six Sigma” management of the environment, can set about from two aspects:
First, construct the logistics network of “Lean Six Sigma”, establish the necessary information management environment
and the management of information systems technology platform. Generally speaking, the settlement of a certain product
quality and process’s fluctuations and defects, use the Six Sigma management, through local processing processes and
equipment adjustments can be realized. However, the process of improve the process and shorten the cycle often involve
large-scale enterprises into the transformation of process, and even organizational structure changes. This requires the
Table 1. The implementation steps of Lean Six Sigma
Table 2. Tools of Lean Six Sigma at different stages
41
International Business Research
enterprise existing logistics systems, such as production layout, production technology and raw material supplies, end
products, and materials flow survey conducted in the building process efficiency on the basis of the evaluation criteria, and
set up a customer demand-oriented fine Lean Sigma Logistics pulling mechanism, it is organizational guarantee of the
fundamental resolution of upgrading the quality, speed and cost reduction, and this is “Lean Six Sigma” logistics network
building. Meanwhile, we must establish the necessary information management environment and the management of
information systems technology platforms, and realize CAD, CAM, MRPII, APS integrated with PDM. These advanced
manufacturing technology is the realization of the picture, visualization control method’s basis, which together constitute
Lean Six Sigma management of the logistics network environment.
Second, the creation of “Lean Six Sigma” corporate culture environment. Lean thinking and Six Sigma management of
common stressed, is “to determine the value of customer demand flow” and “improve customer’s satisfaction” and emphasized
that “excellence”, “the pursuit of perfection”, these concepts need to staff reflected them in each links of the process
flow, after long time it is “Lean Six Sigma” corporate culture that formed. Practice shows that the implementation of “Lean Six
Sigma” management is successful or not, operating tools and methodologies are critical to the application, but can a “Lean
Six Sigma” corporate culture, is the fundamental determining factor.
4. Lean Six Sigma management and the integration of several caveats and cautions
4.1 Give full play to leadership
Lean production and the use of Six Sigma integration, need to deal with the issue of the whole system, at the same time, it
is more complex to analyze and resolve problems, with different departments need to communicate the need for more
resources to support, there are no more leadership support not be successful. The support of the leader should be real
support, not just a verbal commitment, it requires leader to participate in the integration of Lean Six Sigma. Only take part in
them, can they identify problems and effectively promote Lean Six Sigma integration (He, Zhou &Gao, 2006, 1,13-17).
4.2 Strengthen communication
Lean Six Sigma for the integration process, the communication plays a very important role. Communication includes not
only the same level of communication within the organization, the communication between the upper and lower, but also the
organization of communication with external customers, suppliers and communication; communication includes not only
ideologically, but also learn from each other on the way. To strengthen communication, it can greatly promote Lean Six
Sigma concept spread in the organization with the rapid speed, and reduce the resistance.
4.3 Attached importance to cultural construction
Lean Six Sigma emphasis on the facts, as well as the data-based, compared with the traditional extensive experience of
management, its staff requirements are higher, and more stringent. Therefore, the implementation of Lean Six Sigma is also
inseparable from cultural construction, which make each staff of the enterprise forms a habit of doing things, consciously
according to Lean Six Sigma approach to doing things.
4.4 Establish a perfect management foundation
Lean Six Sigma enterprise integration, we must establish a comprehensive management foundation, especially basic data
management, and continuous improvement in order to provide true, reliable data to enable enterprises implemented in the
right direction.
4.5 Concern System
Lean Six Sigma is the strength of the system as a whole, rather than individual projects, the implementation of Lean Six Sigma
to focus not only on the projects, we must also consider the overall improvement of the operation system, the company
short-term financial performance should with the company’s long-term comprehensive strategic balance to consider (Chen,
2006,11,54-56).
4.6 To process management for the center
Lean and Six Sigma management integration should be process-centric, to rid itself of the organization functions as the
starting point ways of thinking. This can really found in the entire value stream which is a value, which is a waste, and
efficient management (He, Zhou & Gao, 2006, 1,13-17).
4.7 Focus should be in this business
Simple copying, copy the experience of others or mechanical combination Lean with Six Sigma is not successful. Enterprises
should base itself on its own characteristics, with its own characteristics and em