1、建筑工程合同范本七篇*建筑工程合同范本七篇*1. 建筑工程总承包合同范本*中文版:*甲方:(甲方全称) 地址:(地址)乙方:(乙方全称) 地址:(地址)鉴于甲方拟对建设项目进行总承包,乙方有承担该项工程之能力,双方经友好协商,达成以下协议:一、工程范围:本次工程总承包的项目为(工程名称及具体内容)。二、工程进度:乙方承诺按照合同约定的进度,完成所有工程。三、工程质量:乙方承诺对工程质量负责,确保符合国家标准和相关规定。四、工程款支付:甲方应按照约定的进度和质量完成工程后及时支付工程款。以上内容为双方共同遵守的合同条款,如需变更需经双方协商一致。合同自双方签字盖章之日起生效。甲方(盖章): 乙方
2、(盖章):日期: 日期:*English Version:*Party A: (Full name of Party A) Address: (Address)Party B: (Full name of Party B) Address: (Address)Whereas Party A intends to undertake the general contracting of the construction project, and Party B has the ability to undertake the project, the two parties have reach
3、ed the following agreement through friendly negotiation:1. Scope of Work: The project under general contracting is (name of project and specific details).2. Project Schedule: Party B promises to complete all work according to the schedule specified in the contract.3. Quality of Work: Party B promise
4、s to be responsible for the quality of work and ensure compliance with national standards and regulations.4. Payment for Work: Party A shall timely pay for the work upon completion according to the agreed schedule and quality.The above terms are binding for both parties, and any changes require mutu
5、al agreement. This contract shall take effect from the date of signing and sealing by both parties.Party A (Seal): Party B (Seal):Date: Date:*2. 建筑工程分包合同范本*中文版:*甲方:(甲方全称) 地址:(地址)乙方:(乙方全称) 地址:(地址)鉴于甲方拟对建设项目进行分包,乙方愿意承接该工程,双方经友好协商,达成以下协议:一、分包范围:乙方完成甲方委托的工程项目(具体工程内容)。二、工程款支付:甲方应按照约定的工程进度和质量,及时支付工程款给乙方。三
6、、工程进度:乙方承诺按照合同约定的进度完成工程项目。四、工程质量:乙方承诺对工程质量负责,保证符合相关标准和规定。合同自双方签字盖章之日起生效。甲方(盖章): 乙方(盖章):日期: 日期:*English Version:*Party A: (Full name of Party A) Address: (Address)Party B: (Full name of Party B) Address: (Address)Whereas Party A intends to subcontract the construction project, and Party B is willing
7、to undertake the project, the two parties have reached the following agreement through friendly negotiation:1. Scope of Subcontracting: Party B shall complete the project entrusted by Party A (specific project details).2. Payment for Work: Party A shall timely pay for the work to Party B according t
8、o the agreed project schedule and quality.3. Project Schedule: Party B undertakes to complete the project according to the schedule specified in the contract.4. Quality of Work: Party B promises to be responsible for the quality of work and ensure compliance with relevant standards and regulations.T
9、his contract shall take effect from the date of signing and sealing by both parties.Party A (Seal): Party B (Seal):Date: Date:*3. 建筑工程设计合同范本*中文版:*甲方:(甲方全称) 地址:(地址)乙方:(乙方全称) 地址:(地址)鉴于甲方需要对建设项目进行设计,乙方有设计能力,双方经友好协商,达成以下协议:一、设计范围:乙方按照甲方要求完成项目的设计工作(具体设计内容)。二、设计费用:乙方完成设计工作后,甲方应按照约定支付设计费用给乙方。三、设计成果:乙方完成设计工
10、作后,应将设计成果交付给甲方,以便后续工程施工。合同自双方签字盖章之日起生效。甲方(盖章): 乙方(盖章):日期: 日期:*English Version:*Party A: (Full name of Party A) Address: (Address)Party B: (Full name of Party B) Address: (Address)Whereas Party A requires design services for the construction project, and Party B has the design capability, the two par
11、ties have reached the following agreement through friendly negotiation:1. Scope of Design: Party B shall complete the design work for the project according to Party As requirements (specific design details).2. Design Fees: Upon completion of the design work, Party A shall pay the agreed design fees
12、to Party B.3. Design Deliverables: Party B shall deliver the design results to Party A after completing the design work for subsequent construction.This contract shall take effect from the date of signing and sealing by both parties.Party A (Seal): Party B (Seal):Date: Date:*4. 建筑工程监理合同范本*中文版:*甲方:(甲
13、方全称) 地址:(地址)乙方:(乙方全称) 地址:(地址)鉴于甲方拟对建设项目进行监理,乙方有监理能力,双方经友好协商,达成以下协议:一、监理范围:乙方负责在施工过程中对工程品质、工程进度、工程结算等进行监理。二、监理费用:甲方应按照约定支付监理费用给乙方,费用支付方式及标准双方另行约定。三、监理成果:乙方应依约交付监理成果给甲方,确保工程施工按照规定进行。合同自双方签字盖章之日起生效。甲方(盖章): 乙方(盖章):日期: 日期:*English Version:*Party A: (Full name of Party A) Address: (Address)Party B: (Full
14、name of Party B) Address: (Address)Whereas Party A intends to conduct supervision for the construction project, and Party B has the capability for supervision, the two parties have reached the following agreement through friendly negotiation:1. Scope of Supervision: Party B shall be responsible for
15、supervising the quality, progress, and settlement of the construction during the construction process.2. Supervision Fees: Party A shall pay the agreed supervision fees to Party B, and the payment methods and standards shall be separately agreed upon by both parties.3. Supervision Deliverables: Part
16、y B shall deliver the supervision results to Party A as agreed to ensure that the construction proceeds according to regulations.This contract shall take effect from the date of signing and sealing by both parties.Party A (Seal): Party B (Seal):Date: Date:*5. 建筑工程施工合同范本*中文版:*甲方:(甲方全称) 地址:(地址)乙方:(乙方全
17、称) 地址:(地址)丙方:(丙方全称) 地址:(地址)鉴于甲方拟对建设项目进行施工,乙方有承包能力,丙方有设计能力,双方经友好协商,达成以下协议:一、项目总体要求:根据设计图纸和合同规定,甲乙丙三方按照约定的施工标准完成工程。二、进度和预算:乙方应按照合同约定的进度和预算施工,确保工程质量。三、设计变更:若因设计变更等原因影响施工进度或费用,需经三方协商一致。四、工程款支付:甲方应按照约定的阶段性工程进度及时支付工程款给乙方。五、保修期:工程完工后,乙方应向甲方提供一定期限的保修,期间内负责免费维修。合同自双方签字盖章之日起生效。甲方(盖章): 乙方(盖章): 丙方(盖章):日期: 日期: 日
18、期:*English Version:*Party A: (Full name of Party A) Address: (Address)Party B: (Full name of Party B) Address: (Address)Party C: (Full name of Party C) Address: (Address)Whereas Party A intends to carry out construction for the construction project, Party B has the capability for contracting, and Pa
19、rty C has the design capability, the three parties have reached the following agreement through friendly negotiation:1. General Requirements: According to the design drawings and contract requirements, Parties A, B, and C shall complete the project according to the specified construction standards.2
20、. Schedule and Budget: Party B shall carry out construction according to the agreed schedule and budget to ensure the quality of the work.3. Design Changes: If the construction schedule or expenses are affected due to design changes, mutual agreement of the three parties is required.4. Payment for W
21、ork: Party A shall timely pay for the work to Party B according to the agreed staged construction schedule.5. Warranty Period: After the completion of the project, Party B shall provide a certain warranty period to Party A, responsible for free maintenance during this period.This contract shall take
22、 effect from the date of signing and sealing by both parties.Party A (Seal): Party B (Seal): Party C (Seal):Date: Date: Date:*6. 建筑工程招标文件范本*中文版:*招标编号:(编号)第一部分:招标主体信息招标单位名称:(全称) 地址:(地址)联系人:(姓名) 联系方式:(电话、邮箱)第二部分:招标项目基本情况项目名称:(名称) 建设地点:(地址) 规模:(规模) 估算造价:(金额)招标范围:(具体范围描述)第三部分:招标要求1. 投标人须具备的资质和条件2. 投标文件的
23、组成和要求3. 投标截止时间和地点其他事项:(补充说明)以上内容为本次招标文件的主要内容,投标人应按照招标文件要求准备资料,并在规定时间内递交投标文件。*English Version:*Tender No.: (Number)Part 1: Information of Tendering EntityName of Tendering Unit: (Full name) Address: (Address)Contact Person: (Name) Contact Information: (Phone, Email)Part 2: Basic Information of Tender
24、 ProjectProject Name: (Name) Construction Location: (Address) Scale: (Scale) Estimated Cost: (Amount)Scope of Tender: (Specific scope description)Part 3: Tender Requirements1. Qualifications and conditions required for bidders2. Composition and requirements of the tender documents3. Deadline and loc
25、ation for submission of bidsOther matters: (Supplementary instructions)The above contents are the main content of this tender document. Bidders should prepare the required materials in accordance with the tender document requirements and submit the bid documents within the specified time.*7. 建筑工程施工图
26、设计合同范本*中文版:*甲方:(甲方全称) 地址:(地址)乙方:(乙方全称) 地址:(地址)鉴于甲方需对建设项目进行施工图设计,乙方具备相关设计资质,双方经友好协商,达成以下协议:一、设计范围:乙方应根据甲方需求完成施工图设计工作(具体设计内容)。二、设计成果:乙方完成设计工作后,应向甲方提交最终设计成果,确保符合工程实际需求。三、设计费用:甲方应按照约定支付设计费用给乙方。合同自双方签字盖章之日起生效。甲方(盖章): 乙方(盖章):日期: 日期:*English Version:*Party A: (Full name of Party A) Address: (Address)Party
27、B: (Full name of Party B) Address: (Address)Whereas Party A requires construction drawing design for the construction project, and Party B has the relevant design qualifications, the two parties have reached the following agreement through friendly negotiation:1. Scope of Design: Party B shall compl
28、ete the construction drawing design work according to the requirements of Party A (specific design details).2. Design Deliverables: Party B shall submit the final design deliverables to Party A after completing the design work to ensure they meet the actual needs of the project.3. Design Fees: Party A shall pay the agreed design fees to Party B according to the contract.This contract shall take effect from the date of signing and sealing by both parties.Party A (Seal): Party B (Seal):Date: Date: