项目经理职责
Responsibility of the Project Manager
(1) 贯彻执行国家有关法律、法规、方针、政策和强制性标准,执行公司的管理制度,维护公司和业主的合法权益。
(1 ) Implement the relevant national laws, regulationspolicies,guidelinend mandatory standards and carry out themanagement system of the company and maintain the lawful rights andinterests of the company and Employer.
(2) 代表公司组织实施本项目管理工作,对实现项目管理的目标负
责.
(2) Organize to implement the management of the Project on behalf ofthe company and be in charge of the objectivfor the realizati(pfproject management.
(3) 组织编制项目执行计划,明确项目的总目标和阶段目标,并将目标分开给项目管理人员,使项目按照总目标的要求进行。
(3 )Organize to prepare the project implementation plan and define thegeneralobjectiveind stage objectivef the projectand dividetheobjectives to the project managers to ensure that the project is carriout in accordance with the requirement of the generalobjective.
(4) 在授权范围内负责与业主、承包商及其他有关人员的协调,解决项目中出现的问题。
(4) Be in charge of the coordination with the EmpCoytractorand other personal concerned of the projectwithin the scope ofauthority to solve problems occurring during the project process.
(5) 主持项目部的工作,组织制定项目的各项管理制度,对项目实施全过程进行组织、协调和控制。
(5) Preside over the work of the Project Department and organize toformulate various management systems of the project and conduct theorganization coordinatioiand controlof the whole processof theproject implement
(6) 按公司管理体系文件的要求,对项目全过程进行质量控制,以达到业主满意。
(6) Conduct quality control in accordance with the requirements of themanagement system documents of the Company to the satisfaction
the Employer
(7) 经授权组建项目管理部,确定项目管理的组织机构,选择、聘用项目管理部人员,确定项目管理部人员的职责。
(7) Establishhe ProjectManagement Department afterauthorizationand determine the institutional framework of the project management
select and hire personnel of the Mrojgcment Department anddetermine the responsibility of them
(8) 在合同范围内有权使用公司的相关资源,并取得有关部门的支
持.
(8) Be entitled to use the relevant resource of the Company and obtainthe support of relevant departments within the scope of the contract
(9) 负责组织编制项目管理规划、工作计划及月报。
(9) Be in charge of organizin'。prepare the projectmanagementplanning, work plan and monthly report
(10 )负责涉及工程费用、工期的设计变更、洽商的审批.
(10 ) Be in charge of the approval of the design alteratioandnegotiation involving engineering cost and construction period.
(11)工程竣工后,组织竣工验收、竣工结算等工作,组织编制竣工报告和工程决算报告.
(11)Organize completion acceptance and settlement after theengineering completion and organize to prepare the completion reportand the final report of the engineering
(12 )组织对项目实施工程中的文件、资料进行归档。
(12 ) Organizethe filingf documents and data during the project
implementation.
(13 )主持做好项目的后期服务工作,使业主满意。
(13) Preside over the service work at the later period the project to thsatisfaction of the Employer.
(14) 支持项目工作会议,签发项目经理部的文件和指令;组织编写和签发项目月报、管理工作阶段报告、专项报告和项目工作总结。
(14) Preside over the working conference of the proijeute athfedocuments and instructions of the Project Management Departmentorganizeto prepare and issuethe monthly reportof the project,theinterim report for the managem,nspecial report and work summaryof the project.
(15) 负责制定项目资金的使用与支付,审定签署承包单位的工程支付申请;
(15) Be in charge of the approval the use and the payment of project fundand approval and signing of the application for funds payment f rom theContracting Organization
(16) 配合政府有关部门稽查、财政评审、审计和项目后评价工作。
( 16 ) Coordinate the relevantgovernment departments with theinspection, financial evaluation,audit and post projectevaluation
(17) 对重大事项的处理提出处理意见和建议。
(17 ) Propose handing opinions and suggestion for major events