收藏 分销(赏)

SGM常用缩写(1).doc

上传人:xrp****65 文档编号:7442461 上传时间:2025-01-04 格式:DOC 页数:5 大小:47.50KB 下载积分:10 金币
下载 相关 举报
SGM常用缩写(1).doc_第1页
第1页 / 共5页
SGM常用缩写(1).doc_第2页
第2页 / 共5页


点击查看更多>>
资源描述
Glossary of Terms 术语 Glossary of Terms术语 AAR: Appearance Approval Report 外观批准报告 A/D/V: Analysis/Development/Validation 分析/开发/验证 A/D/V–DV: ADV Design Validation ADV设计验证 A/D/V P&R: Analysis/Development/Validation Plan and Report. This form is used to summarize the plan and results for validation testing. Additional information can be found in the GP-11 procedure. 分析/开发/验证计划和报告 A/D/V–PV: ADV Product Validation ADV产品验证 AIAG: Automotive Industries Action Group, an organization formed by General Motors, Ford and Daimler-Chrysler to develop common standards and expectations for automotive suppliers. 汽车工业行动集团 AP: Advance Purchasing 先期采购 APQP: Advanced Product Quality Planning 产品质量先期策划 APQP Project Plan: A one-page summary of the SGM APQP process that describes the tasks and the timeframe in which they occur. APQP项目策划 AQC: Attribute Quality Characteristic 属性质量特性 ASQE: Advanced Supplier Quality Engineer 先期供应商质量工程师 BIW: Body in White. Usually the bare metal shell of the body including doors and deck lid prior to paint and trim. 白车身 BOM: Bill of Materials 材料清单 BOP: Bill of Process 过程清单 Brownfield Site: An expansion of an existing facility. 扩建场地 CMM: Coordinate Measuring Machine 三坐标测试仪 Cpk: Capability Index for a stabile process 过程能力指数 CTC: Component Timing Chart (DRE document) 零部件时间表(DRE文件) CTS: Component Technical Specifications 零部件技术规范 CVER: Concept Vehicle Engineering Release 概念车工程发布 DC: Design Complete 设计完成 Defect outflow detection: A phrase used in the Supplier Quality Statement of Requirements that refers to in-process or subsequent inspection used to detect defects in parts. 缺陷检测 DFM/DFA: Design for Manufacturability / Design for Assembly 可制造性/可装配性设计 DFMEA: Design Failure Modes and Effects Analysis. It is used to identify the potential failure modes of a part, associated with the design, and establish a priority system for design improvements. 设计失效模式和后果分析 DPV: Defects per vehicle 每辆车缺陷数 DR: Documentation Required DR特性 DRE: Design Release Engineer 设计释放工程师 DV: Design Validation 设计验证 E&APSP: Engineering & Advance Purchasing Sourcing Process. 工程&先期采购定点程序 EP: E-Procurement 电子采购流程 Error Occurrence Prevention: A phrase used in the Supplier Quality Statement of Requirements that refers to poke yoke or error-proofing devices used to prevent errors in the manufacturing process from occurring. 防错 FTQ: First Time Quality 一次通过质量 GA: General Assembly 总装 GD&T: Geometric Dimensioning & Tolerancing 几何尺寸与公差 SGM: Shanghai General Motors 上海通用汽车 GMAP: General Motors Asian Pacific 通用汽车亚太 GME: General Motors Europe 通用汽车欧洲 GMNA: General Motors North American 通用汽车北美 GP: General Procedure 通用程序 GPDS: Global Product Description System 全球产品描述系统 GPS: Global Purchasing System 全球采购系统 GPSC: Global Purchasing & Supplier Chain 全球采购及供应链 GR&R: Gage Repeatability and Reproducibility 检具重复性及再现性 Greenfield Site: A new supplier facility that is built to support a program. GVDP: Global Vehicle Development Process 全球整车开发流程 IPTV: Incidents per Thousand Vehicles 每千辆车故障 IVER: Integration Vehicle Engineering Release 集成车工程发布 KCC: Key Control Characteristics. It is a process characteristic where variation can affect the final part and/or the performance of the part. 关键控制特性 KCDS: Key Characteristic Designation System 关键特性指示系统 Kick-Off Meeting: The first APQP supplier program review. 启动会议(第一次APQP供应商项目评审) KPC: Key Product Characteristic. It is a product characteristic for which reasonably anticipated variation could significantly affect safety, compliance to governmental regulations, or customer satisfaction. 关键产品特性 LAUNCH PLAN:活动计划 LAAM: (General Motors) Latin American, Africa & Meddle East (通用汽车)拉丁美洲、非洲及中东 LCR: Lean Capacity Rate. It is the GM daily capacity requirement. 正常生产能力 MCR: Maximum Capacity Rate. It is the GM maximum capacity requirement. 最大生产能力 MOP: Make or Purchase 制造/采购 MPC: Material Production Control 物料生产控制 MPCE: Material Production Control Europe 欧洲物料生产控制 MRD: Material Required Date; date material must be delivered in order to allow a build event to begin. 物料需求日期 MSA: Measurement Systems Analysis 测量系统分析 MVBns: Manufacturing Validation Build non-saleable 非销售车制造验证 MVBs: Manufacturing Validation Build saleable 销售车制造验证 NBH: New Business Hold 停止新业务 N.O.D.: Notice of Decision 决议通知 NS1、2、3、4:不可售阶段 OEM: Original Equipment Manufacturer 主机客户 PAD: Production Assembly Documents 生产装配文件 PC&L: Production Control & Logistics 生产控制&物流 PDT: Product Development Team 产品开发小组 PFMEA: Process Failure Modes and Effects Analysis. It is used to identify potential failure modes associated with the manufacturing and assembly process. 过程失效模式和后果分析 PPAP: Production Part Approval Process 生产件批准程序 Ppk: Performance index for a stable process 过程能力指数 PPM: 1) Program Purchasing Manager, 2) Parts per Million (rejects and returns to suppliers) 1)项目经理 2)每百万件的产品缺陷数 PPV: Product & Process Validation 产品及过程验证 PQC: Product Quality Characteristic 产品质量特性 PR/R: Problem Reporting & Resolution 问题报告及解决 PSA: Potential Supplier Assessment, a subset of the Quality System Assessment (QSA) 潜在供应商评审 PV: Product Validation 产品验证 PVV:准备模型、手工阶段 PUS:pick up sheet 交货计划单 QSA: Quality System Assessment 质量体系评审 QSB: Quality Systems Basics 质量体系基础 QTC: Quoted Tool Capacity 工装报价能力 RASIC: Responsible, Approve, Support, Inform, Consult 负责、批准、支持、通知、讨论 R@R: Run at Rate 按节拍生产 RFQ: Request For Quotation 报价要求 RPN: Risk Priority Number related to FMEA development 风险顺序数 RPN Reduction Plan: An action plan that describes what is being done to reduce the risk priority number for items listed in the DFMEA or PFMEA. 降低RPN值计划 S1、2、3、4:可销售阶段 SDE: Supplier Development Engineer 供应商开发工程师 SFMEA: System Failure Mode and Effects Analysis 系统失效模式分析 SMT: System Management Team 系统管理小组 SOA: Start of Acceleration 加速开始 SORP: Start of Regular Production 正式生产 SOR: Statement of Requirements 要求声明 SPC: Statistical Process Control 统计过程控制 SPO: (General Motors) Service and Parts Operations (通用汽车)零件与服务分部 SQ: Supplier Quality 供应商质量 SQE: Supplier Quality Engineer 供应商质量工程师 SQIP: Supplier Quality Improvement Process 供应商质量改进过程 SSF: Start of System Fill 系统填充开始 SSTS: Sub-system Technical Specifications 子系统技术规范 Sub-Assembly / Sub-System: An assembly of sub-components delivered to the SGM main production line for installation to the vehicle as a single unit. Subcontractor: The supplier of a sub-component to a Complex System/Subassembly supplier (Tier 2, 3, etc). 分供方 SVE: Sub-System Validation Engineer 子系统验证工程师 SVER: Structure Vehicle Engineering Release. 结构车工程发布 Team Feasibility Commitment: An AIAG APQP form that is provided with the Request for Quotation. It is the supplier’s concerns with the feasibility of manufacturing the part as specified. 小组可行性承诺 TKO: Tooling Kick-Off 模具启动会议 UG: Unigraphics UG工程绘图造型系统 VAC:现场控制 VLE: Vehicle Line Executive 车辆平台负责人 VTC: Validation Testing Complete 验证试验完成 WO: Engineering Work Order 工程工作指令
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 应用文书 > 其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2026 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服