收藏 分销(赏)

尾砂坝ۥ管理工岗位职责.doc

上传人:pc****0 文档编号:6897746 上传时间:2024-12-23 格式:DOC 页数:1 大小:16KB
下载 相关 举报
尾砂坝ۥ管理工岗位职责.doc_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、尾砂坝治理工岗位职责1.负责好尾砂坝的全面治理维护,堆积和平安消费。1. Be responsible for the total management, maintenance, stacking and work safety of the tailing dam.2、管辖范围(从钢丝桥中心分界,经张舍里至尾砂坝(烂泥洞)止,包括尾砂、管道、尾砂分流管、初期坝、排水沟、排水涵门洞、排洪斜槽、四周山坡等。)2. The administered scope ( is from the center of the steal wire bridge, through Zhangsheli to

2、 the tailing dam (slush cave), which includes tailings, pipeline, tailing divider, preliminary dam, drainage ditch, drainage clough, tilted floodway (chute), surrounding hill slope, etc. )3、认真执行各项制度,自觉恪守劳动记录,坚持巡回检查、清理、维护,至少每星期向选厂负责人汇报一次,雨季和坝满时应勤检查、勤汇报,对排水斜槽应加强观察,特别是雨季尤其要注重,有排水不当之处,应及时清理,假设工作量较大,应报选厂

3、派人支援。3. Carefully implement each system and consciously abide by the labor discipline; persist in the patrol inspection, clearance and maintenance, report to the leaders of the dressing plant at least once a week; frequently check and report during rainy season or when the dam is full; strengthen th

4、e observation on the drainage chute, especially during rainy season; when there is any drainage problem, settle it in time; if the work load is heavy, report to the dressing plant for support.4、检查尾矿管道是否磨损、堵塞、漏矿浆。4. Check if the tailing pipeline is worn-out, blocked or with pulp leakage.5、留意初期坝的坝顶和外坡

5、的变化,检查护坡块石松动、风化、尾砂水渗逸、塌方、植物生长等情况。5. Pay attention to the crest of the preliminary dam and the change of the exterior slope, check the looseness and efflorescence of the block rock on the revetment, penetration or overflow of the tailing water, landslide, vegetation growth, etc.6、尾砂排放应在靠近坝顶处用分流管流放,分流

6、管伸至坝内坡底部,分配要均匀,尽量使粗砂靠近坝内坡沉降,细砂流向较远的地点,不同意在尾矿坝中部、后部排放尾砂。6. The tailing shall be discharged through the divider next to the dam crest, the divider extends to the bottom of the inside slope, the distribution shall be even: the harsh sedimentates next to the inside slope and the thin flows to the farthe

7、r place; it is not allowed to discharge the tailing in the center and back part of the tailing dam.7、尾砂坝后部排水斜槽,要经常检查,清理两边的土、石等物防止进入槽内。7. Frequently check the drainage chute in the back part of the tailing dam, clear away the soil and stone, etc. on its both sides to avoid entry into the chute.8、尾砂坝坝满后应及时进展尾矿堆坝、堆坝坡度应按设计图纸放线施工。8. Once the dam is full, it shall be piled up, the grade of the piled slope shall be in accordance with the design drawings and constructed accordingly.

展开阅读全文
部分上传会员的收益排行 01、路***(¥15400+),02、曲****(¥15300+),
03、wei****016(¥13200+),04、大***流(¥12600+),
05、Fis****915(¥4200+),06、h****i(¥4100+),
07、Q**(¥3400+),08、自******点(¥2400+),
09、h*****x(¥1400+),10、c****e(¥1100+),
11、be*****ha(¥800+),12、13********8(¥800+)。
相似文档                                   自信AI助手自信AI助手
搜索标签

当前位置:首页 > 应用文书 > 其他

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2025 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服