收藏 分销(赏)

T构转体施工工艺框图.doc

上传人:二*** 文档编号:4694031 上传时间:2024-10-10 格式:DOC 页数:1 大小:22.04KB 下载积分:5 金币
下载 相关 举报
T构转体施工工艺框图.doc_第1页
第1页 / 共1页
本文档共1页,全文阅读请下载到手机保存,查看更方便
资源描述
T-structure turning construction technology Frame Sub-table sted plate painting Grease fluorine powder Sub-circle way sand Mortar leveling Foundation top concreting &supporting colunn Installing sub-table sted plate&stedaxle axle Foundation 1st fioor concrering Welding foundation steel,preserved piersted of pier Erecting form & concreting beam Section No.0.1.1’ Concreting pier Erecting form & concreting upper table&temporary support Hoisting upper table sted plate to proper place Upper table insert fluorine mushroom end ,painting grease Reaching design requirement Removing Supports Concreting symmtrey beam section from2(2ˊ)to10(10ˊ),lapping supports to concrete from 12(12ˊ)to15(15ˊ) Tensioning beam Section No.0,1&1’ concrete strength reaching over 85%than design value Connection section concreting Temporary strand tension Removing temporary Support on turntable Welding connection section 11(11ˊ)skeleton Sealing Table Turning body Erecting border span T-beam Removing supports of Cast-in-place section Connection Section tension Removing Temporary strand Bottom Plate Vertical Prestress tension Concreting & sealing concrete strength reaching Bridge pavement over 85%than design value
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 品牌综合 > 技术交底/工艺/施工标准

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2026 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服