1、摘要施工组织设计是建筑施工组织的核心和灵魂,是对工程建设项目全过程的构思设想和具体安排,用来指导施工项目全过程各项活动的技术,经济和组织的综合性文件.本施工组织设计是针对阳光小区办公楼工程施工的纲领性文件。编制时对施工总体部署、施工准备、主要分部分项工程施工方法、工程质量保证措施、施工现场管理措施等诸多因素尽可能充分考虑,突出科学性、适用性及针对性,是确保优质、低耗、安全、文明、高速完成全部施工任务的重要经济技术文件.本设计主要包括以下内容:工程施工组织设计书、施工进度计划安排、施工平面布置图、具体施工方案。为确保工期、质量及安全、文明工地,节约成本等条件,编制出针对性的施工组织设计,每个分部
2、分项工程的特点,结构特征,施工难易程度工期和质量要求,编制出切实可行的施工方案。以指导施工顺利地完成本工程项目的建设,控制工程成本,创建优质工程。关键词:质量 进度 组织管理 施工方案AbstractConstruction organization design is the core of construction organizations, and soul, is the whole process of engineering construction projects and the specific arrangements envisaged in the concept,
3、used to guide the construction of the project activities of the whole process of technical, economic and organizational comprehensive document .The construction organization design is for Suzhou sunshine Area Office Project of the programmatic document. The time when the general plan of construction
4、, construction preparation, the main subsegment of the construction methods, project quality assurance measures, construction site management measures, and so many factors the fullest possible consideration, extrude scientific, applicability and relevance, yes , low consumption, safe, civilized, hig
5、hspeed to complete all of the important task of economic construction technical documents .The design includes the following: The construction organization design books, arrange construction schedule, construction floor plan, the specific construction plan .To ensure that the duration, quality and s
6、afety, civil construction site, cost and other conditions, compile targeted construction organization design, each Fen project features some of Xiang, construction of features, construction schedule and quality demand degree of difficulty to prepare a feasible construction program. To guide the construction of the successful completion of the construction of the project, control costs, create high-quality project。Keywords: Quality Schedule Organization and Management Construction programme