资源描述
内容为网络收集 仅供参考
CONTENTS
CONTENETS
Part I INTRODUCTION 6
Part II FITTING-OUT GUIDE 7
2.1 Handing-over of Premises 8
2.2 Owner/Tenant Contact Information 8
2.3 Fitting-out Works by Owner/Tenant 8
2.3.1 Approval of Fitting-out Plans 9
2.3.2 Preparation of Fitting-out Plans/Drawings 10
2.3.3 M&E Installation 10
2.3.4 Submission Of Fitting-out Plans/Drawings 11
2.3.5 Fitting-out Works by Developer’s
Nominated Contractor 11
2.3.6 Fitting-out Garbage Removal Charge &
Decoration Deposit 12
2.3.7 Temporary Electricity Supply 12
2.3.8 Inspection on Tenant Decoration 12
2.3.9 Special Notes for Fitting-out Work 13
2.4 Summary of Fitting-out Process 14
PART III FITTING-OUT RULES 15
3.1 Confirmation of Fitting-out Works 16
3.2 List of Fitting-out Works Supervisors 16
3.3 Transportation of Materials &
Removal of Decoration Garbage 16
3.5 Damage Resulting from
Fitting-out Works 16
3.6 Fitting-out Actives to be confined
inside Premises 16
CONTENETS
3.7 Security of Materials & Tools 17
3.8 Re-instatement of Fixtures/Fittings 17
3.9 Supply of Water & Electricity 17
3.10 Fitting-out Time and Name List 17
3.11 Works at Common Area 17
3.12 Safety Measures 18
3.13 Behavior of Contractors 18
3.14 Erection of Hoarding 18
3.15 Area Passage 18
3.16 Observance of Regulations 18
PART IV MANAGEMENT SERVICES19
4.1 Introduction of Management Work 20
4.2 Location for Payment
of Management Fee 20
4.3 Notes for Payment 20
PART V NOTES ON MOVING IN & HOUSE RULES21
5.1 Notes On Moving In 22
5.1.1 Prior Booking for Service Lift 22
5.1.2 Trolley of Rubber/Plastic Castors to
be used 22
5.1.3 Staff to be Employed to Oversee
Moving In 22
5.1.4 Handling of Debris 22
5.2 House Rules 22
5.2.1 Emergency Contact 22
5.2.2 Installation and Alteration 22
5.2.3 Sign 22
5.2.4 Erection of Aerial 22
CONTENETS
5.2.5 Loading and Unloading 23
5.2.6 Use of Service Lift 23
5.2.7 Use of Toilet 23
5.2.8 Use of Premises 23
5.2.9 No Sleeping or Domestic Use 23
5.2.10 No Preparation of Food and Cooking 23
5.2.11 Normal Business hours 24
5.2.12 Keep Premises Open 24
5.2.13 Keep Shop Front and Sign Lighting24
5.2.14 No Encroachment at Common Area24
5.2.15 Cleaning 24
5.2.16 Refuse and Garbage Removal 24
5.2.17 Touting 24
5.2.18 Nuisance 24
5.2.19 Animal and Pet 25
5.2.20 Dangerous Goods 25
5.2.21 Obstruction in Staircase or Passage 25
5.2.22 Access to Premises after Normal
Business hours 25
5.2.23 Works outside Opening Hours of
the Plaza 25
5.2.24 Rules Amendment25
5.2.25 Compliance of Regulations 25
PART VI FIRE EVACUATION 26
6.1 Fire Order for Display 27
6.1.1 If You See A Fire, Remain Calm 27
6.1.2 If You Hear a Fire Alarm, Remain Calm 27
6.1.3 How To Use The Hose Reel 27
CONTENETS
6.2 Instruction for Evacuation 28
6.2.1 While Awaiting Instructions 28
6.2.2 If Evacuation Is Ordered,
Remain Calm 28
6.3 Warning System 28
6.3.1 Fire Alarm 28
6.3.2 Additional Equipment 29
6.3.3 Public Address System 29
6.3.4 Emergency Light 29
6.4 Fire Precautions 29
PART VII APPENDIX 30
7.1 Charges for Decoration Garbage
Removal & Decoration Deposit 31
7.2 Temporary Electricity Supply
Charge Rate 31
7.3 The Premium Amount for Contractor's
All Risks Insurance 32
7.4 Opening Hours of The Management Office
& Contact No. 32
7.5 Operation Time of Passenger
& Service Lifts in Office Tower 32
7.6 Central Air-Conditioning Supply for
Office Tower 33
7.7 Operation Time of Passenger
& Service Lifts in Shopping Arcade 33
7.8 Central Air-Conditioning Supply
for Shopping Arcade 33
7.9 Charges of Non-Office-Hour
Air-Conditioning Supply 33
7.10 Useful Telephone Numbers 33
PART 1
INTRODUCION
PART 1
INTRODUCTON
Shanghai New World Property Management Company Limited welcomes you as an office owner / shop owner / office tenant of Hong Kong New World Tower and wishes you prosperous business for many years to come.
This Handbook aims at providing an overall guidance to the understanding by commercial owners / tenants with general information on the procedures and requirement of commercial premises, the management services to be provided, house rules and regulations to be observed, etc. It is of an advisory nature only and should be read subject to the Deed of Mutual Covenant and Management Agreement. It is also for information only and should not be relied upon to the exclusion of any legal documentation concerning a tenancy and Deed of Mutual Covenant. We hope that you will find this Handbook informative and useful. Please feel free to contact the local management staff who are always ready to assist you if you require further information.
We take this opportunity to assure you of our best service at all times.
Shanghai New World Property Management Company Limited
Director & General Manager
PART 2
FITTING-OUT GUIDE
PART 2
FITTING-OUT GUIDE
2.1 Handing-over of Premises
Upon completion of the signing of Assignment and payment of
management fees, a notification letter of premises taking-over and
requirement of premises taking-over will be issued by the
Developer's leasing sector. Keys of the premises are then allocated
by the Hong Kong New World Management Office on production of
leasing sector notification letter at a specific date which shall be
notified in writing by the Registered Owner / Tenant under normal
circumstances. An official company seal / chop must be brought in
while taking over the premises. On receipt of the keys, you will be
accompanied by our management staff to inspect on the condition of
the provided fixture and fittings, which are ready to be taken over in
the premises.
Subject to the provision of the Deed of Mutual Covenant and
Management Agreement, owners / tenants are responsible for the up-
keeping, including maintenance and repair, of all the items handed
over. If you appoint your agent or representative to take over the
premises, an authorization letter must be presented to the
Management Office.
2.2 Owner / Tenant Contact Information
Owner / Tenant shall complete and return a contact information form
upon taking over the premises which will be used for the purpose of
day-to-day communication and emergency contact.
2.3 Fitting-out Works by Owner / Tenant
The owners / tenants are responsible at their own expenses for all fitting-out
words, including alterations or additions to the Developer’s provided fittings
or fixtures, within the premises. It is for the owner's / tenants' benefit to
submit plans before the intending date of hand-over, which shall
PART2
FITTING-OUT GUIDE
be notified in writing by the Management Office. These owners / tenants are
advised to appoint a professional designer for the design and construction of
the premises, if necessary, to prepare plans and drawings for submission to the
Management Office for approval as soon as possible. All the alteration of
construction concerning the Electricity Engineering will be arranged by the
contractor nominated by the Developer while the additional charges will be
at tenants' expenses. Fitting-out works, including the
removal of any Developer fixtures or fittings, should NOT be carried out
before approval is obtained from the Management Office.
2.3.1 Approval of Fitting-out Plans
Owners / Tenants must submit the fitting-out plans to the Management Office
for written approval prior to the commencement of any fitting-out works. The
following plans are generally required depending on the extent of alteration /
additional works.
2.3.1.1 Floor plan with clear indication of the internal
partitions with detailed description / specifications of Fitting-out
material to be used;
2.3.1.2 Elevation / section of floor plan with details of
shop front / shop sign;
2.3.1.3 Drop-ceiling and lighting plans;
2.3.1.4 Drainage layout plan;
2.3.1.5 Fire control equipment and smoke-detector
sprinkler system layout plan;
2.3.1.6 Air-conditioning steel duct system layout plan
with details;
2.3.1.7 High-voltage line electricity supply layout plan
2.3.1.8 High-voltage line electricity plane layout plan
(lighting power)
2.3.1.9 Low-voltage line system
PART2
FITTING-OUT GUIDE
2.3.1.10 Low-voltage line plane layout.
(telephone,computer lines layout plan)
2.3.1.11 Thermo-control layout plan
2.3.1.12 Instructions of other decoration design
2.3.2 Fitting-out Plans / Drawings
In your submission of fitting-out plans / drawings, you should take note
of the following in order to avoid delay:
2.3.2.1 All plans / drawings should be in metric scale sand properly
numbered;
2.3.2.2 All technical information should be in metric units;
2.3.2.3 Correct levels and dimension should be marked on submitted
plans / drawings. In all cases, dimensions should be verified by
site measurement;
2.3.2.4 Construction details, specification of materials and method of
fixing should be shown on drawings;
2.3.2.5 Plants / equipment should be shown on drawings;
2.3.2.6 Any alteration to the building's structure is prohibited.
2.3.3 M & E Installation
Major modification and / or alteration of the building services is not
permitted. Owners / tenants who intend to have minor alteration and
additional works to the building services must submit applications to the
Management Office with all plans and drawings concerned. The
application with plans will be vetted by the M & E Consultant. No
additional or alteration works to the building services shall be
commenced without prior approval of the Management Office.
PART2
FITTING-OUT GUIDE
If you want to connect electrical cable to the building main switch room control panel, prior application in specified form should be completed and returned to the Management Office 3 days before the works. During the decoration period, immediate application would not be entertained. All the works has to execute after 23:00 hours. You are held solely liable for any loss, damage and claim arising therefrom if Management Office's approval has not been obtained.
2.3.4 Submission of Fitting-out Plans / Drawings
Owners / tenants can submit the plans / drawings to the Management Office for approval. The following are the addresses:
2.3.4.1 Shanghai New World Property Management Co., Ltd
Hong Kong New World Tower Management Office: No.300 Huai Hai Road (M), Floor, Shanghai..
2.3.4.2 Owners / tenants can request a meeting with the Management Office to discuss the proposed fitting-out word, if considered necessary.
2.3.5 Owners' / Tenants' Works by Developer’s Nominated Contractors To ensure safety to the public & proper functioning of the building services system during owner's / tenants' fitting-out period as well as future operation, the following works must be done by Developer’s Nominated Contractors at owner's / tenant's cost:
2.3.5.1 Additional / Alteration Works on Air-conditioning Installation (including fan reel, air-adjustment machine) no matter such works involves the owners’/tenants’ area or common area must be done by the Developer’s nominated contractors.
2.3.5.2 Additional/Alteration Works on Water Supply and Drainage System no matter such works involve common area or the owners’/ tenants’ premises must be done by the Developer’s nominated contractor..