收藏 分销(赏)

RFC-反应流程图(ppt文档).ppt

上传人:天**** 文档编号:2646162 上传时间:2024-06-03 格式:PPT 页数:41 大小:509.04KB 下载积分:12 金币
下载 相关 举报
RFC-反应流程图(ppt文档).ppt_第1页
第1页 / 共41页
RFC-反应流程图(ppt文档).ppt_第2页
第2页 / 共41页


点击查看更多>>
资源描述
反应流程图反应流程图 Response Flow Checklist2PCS ElementsCreate Measurement PlanEstablish Monitor(SPC)Implement Response Flow Checklist(RFC)Element 1Element 2Element 33ContentsIntroductionWhat is an RFC?Benefits of Using an RFCWhen Should an RFC be Used?Developing an RFCDocumentation of RFC ResultsRFC Storage and RetentionRFC Continuous Improvement GuidelinesRFC Expectations4What is an RFC?A document to contain suspect product and return the process/equipment to a productive state as quickly as possible.Composed of defined set of tasks(action items)to be performed in specific orderRequires certain decisions to be made to find solution to the problem and therefore may lead to two or more different solutions depending on the scenario.5RFC Structure”Diagnosis activities are used first to determine the cause of the process instability.For each possible cause,there is a set of remedy activities that are used to fix the problem once the cause has been determined.”Verification activity is the final step.It is performed to make sure that the process problem has been fixed.6Example of an RFC(Flowchart Type)Exposed Copper Monitoring RFCSpec xx-xxxxDecisionActionEndStartContinueForm Rev ACRev Date:12/20/97Page 1 of 1MS/MT/OperatorTechnicianMfg SupervisorTop-up/Dilute chemical per Shift Engr.instruction and document it in chemical analysis recording bookCheck Deflash and Descale concentration YesWithin specwindow?NoCheck 1)Deflash rectifier2)Titanium anode plate3)Oil contamination in HP tank4)Excessive mold/resin bleed outVerify with dummyNoDocument it and inform Shift supt.YesExposed copper?YesNoRectify the problem accordingly&document it in recording bookWithin specwindow?Inform Proc./Equip.EngineerVerify with dummyNoDocument it and inform Shift supt.YesExposecopper?Exposed copperYesWithin specwindow?NoAAABBUpdateon-hold lotsin shiftly reportLast Block:Engg actions/comments:_-_Endorse RFC to Mfg for filing.7Benefits of Using an RFCIdentifies cause of process or equipment failuresControl charts and SPC trend rules tell us only when the process is out-of-control,not why it is out-of-control.They cannot tell us what to do to fix the problem,either.For that,we need the RFC.Leads Mfg Technician/Specialist through steps in solving the problem in the quickest possible timeMinimal need for Engineering involvementDocuments problem cause and resolution history8When Should an RFC be Created?Statistical process control When an out-of-control(OOC)condition occurredProduct quality and yield controlWhen questionable products are detected at any stationWhen low yielding lots are seen at any stationProcess/Equipment failureFor restoring a machine to production after it has been shut down due to a process/equipment related failure9PCSSPCProcess/Equipmentmaintenance and controlsProductQuality and YieldRFCViolations?e.g.,out-of-control(OOC)pointsLow yield ordiscrepant materials?(i.e.,less thandefined/agreedgoals)Failures?e.g.,missing units,process/equipment monitorproblems such as ball shear failure,temperature problems,etc.FMEARFC Model10Who Develops the RFC?Initiated and led by the process or equipment owner(e.g.,Module Engineer)in a team environmentRFC Development Team should include the following:Process/Equipment EngineersProduct EngineersQ&R EngineersMaintenance TechniciansManufacturing personnelqShift Managers,Mfg Supervisors,MS/MT/OperatorStatisticiansContent experts11RFC Development Flow12Step 1:Brainstorm potential causesUsing a Fishbone diagram,brainstorm all the possible causes of out-of-control signals for the process step.Consider 5M+E factors.Use any existing data or experience on causes of out-of-control incidents.Augment the list with all applicable causes from other existing RFCs for similar parameters.Dont forget to include some of the less obvious ones,such as gauge instability,calculation errors,or plotting errors.Use FMEA when available.13Step 1:Brainstorm potential causes(cont)Example:Problem:Missing unitsPotential causes:Incomplete lot identifier Improper staging of lot Counting SOP violation Equipment jamming Wrong information on ticket14Step 2:Assess likelihood and easeEstablish basis for initial ordering of potential causesLikelihood of being the cause of the problemEase of checkingUse Likely/Ease matrixScore each potential cause on a scale of 1 to 5Do not consider difficulty of fixing the problemFor each potential cause,add Likelihood and Ease scores to get an overall score15Example:Missing units Likely/Ease Matrix Scale:Likely1-Likely to be the cause 5-Unlikely to be the causeEase1-Easy to check 5-Difficult to checkPotentialCauseLikelyEaseSumCountingSOP violation314Equipmentjamming325Incompletelot identifiers112Wronginformationon ticket527Improperstaging of lot224Step 2:Assess likelihood and ease(cont)16Step 3:Create overall RFC process flowRank each potential cause according to its total Likely/Ease score(i.e.,lowest total score has highest priority).Examine the prioritized list for logical ordering and grouping.Similar problem causes can be investigated simultaneously or in combined actions.Avoid redundancy.Actions should be grouped by users:MS/MT/Operator,Technician,Engineer.Examine the ordering from other existing similar or related RFCs.One suggestion is to start with calculation and plotting error checking.Next should be measurement procedure/equipment checking.It is best to rule out possible data/plotting/measurement errors first,before we tamper with the machine or process itself.If the FMEA has been used as a basis in Step 1,the FMEA occurrence number should also be used as a reference in assigning likelihood and ease scores.17Step 3:Create overall RFC process flow(cont)Example:Missing units Initial flow based on Likely/Ease overall score:1.Incomplete lot identifiers highest priority2.Counting SOP violation3.Improper staging of lots4.Equipment jamming5.Wrong information on tickets lowest priority18EXERCISE 1In groups of 4 to 5 people:Identify a problem common to the groupCreate an initial RFC using Steps 1 to 3Choose a reporterPresent to the class after 20 minutes19Definition of TermsACTION-specific instructions telling the RFC User what tasks to perform nextAvoid redundant actions,be specificClarify ownership of the actionCluster ownership of actions,avoid bouncing between ownersDATA-information collected by the RFC UserIncludes observations and measurements20Definition of TermsQUESTION-requires the RFC User to evaluate the data against specific criteriaUse questions that require yes/no responseAvoid subjective questionsRESPONSE-what action should the RFC User take based on the evaluation of the dataEnsure all responses lead to an action21Step 4:Create detailed RFC process flowList all steps required for the following:Determine if potential cause existsFix potential causeTest and verify fixUse flow diagram to communicate the logical flow of the RFC.When creating flow for fixing the problem,Utilize synergy from other RFCs in wording and descriptions.Actions must be absolutely clear.Avoid ambiguity.The decision flow may stop when all Operator-verifiable causes have been exhausted.Many checklists may continue through Technician-verifiable(or even Engineer-verifiable)causes as well.Examine the overall decision flow for completeness and logic.Check for infinite loops and dead ends.Modify if needed.22Check/verifyall lot identifiersAll lot identifiers tally?NoYesContinue productionMake necessary changeson wrong identifier/sDispo lot through proper channel(next potential cause)All lot identifiers tally?NoYes(next potentialcause)Example:Missing unitsStep 4:Create detailed RFC process flow(cont)23Step 5:Compose the RFCTranslate the detailed flow created in Step 4 into an RFC draft.An action for verifying if process/equipment is up for production when a final solution is achieved should always be included in the RFC.Include instructions for re-starting the process.If the accept criteria specified in the verification procedure have been satisfied,it is safe to assume that the problem has been solved.Otherwise,it must be assumed that the problem has not yet been fixed.If out-of-spec processing could have occurred,the RFC may reference the applicable spec or disposition procedures.However,the disposition procedure should not appear in the RFC.Verification of process/equipment status can be done in two ways:qRun a certain number of unitsqUse 2-sigma limit rule24Step 5:Compose the RFC (cont)Block 16Process 100 units froma production lot.Block 16Is the total numberof rejects/=1?YesNo(next steps)Last Block:Engg actions_Endorse RFC to Mfg for filing.Running a certain number of unitsQuantity to be processed for verification is determined by the RFC Development Team and should be specified in the RFCVerification/monitoring should be required after running the units to determine whether to resume production or not.25Step 5:Compose the RFC (cont)Out-of-control Point“Verification”Point+3 Sigma-3 Sigma+2 Sigma-2 SigmaCenterline“VerificationZone”2-Sigma Limit RuleIf next control chart point is within 2-sigma limits,it is safe to assume that the problem has been solvedqAll succeeding control chart points will follow the standard 3-sigma limit ruleOtherwise,it must be assumed that the problem has not been fixed and continue using the RFC to diagnose and fix the problem26Step 5:Compose the RFC (cont)Last Block:Engineering actions_Endorse RFC to Mfg for filing.The last RFC action should state whether the RFC was successful in finding the problem cause.It describes final engineering actions taken when the RFC is not successfulDesignates that the action owner is the EngineerIf applicable,it instructs the Engineer to return the RFC to the MS/MT/OperatorUse the hexagon toolExample:27Step 5:Compose the RFC(cont)The RFC Development Team is responsible for determining if the RFC actions taken need to be documented for passdown and traceability purposes.For RFC actions taken that need to be documented:Create a cover sheet only if requirement is paper-based documentation.qThe following information are required to be supplied by the primary RFC User if applicable:equipment number,lot numbers affected,lead count,date/shift/time problem was encountered,Employee ID of MS/MT/Operator and/or Technician.qThe cover sheet should contain required RFC instructions as well as include RFC trigger point,i.e.,when to use the RFC.If electronic documentation (e.g.,automated RFC tool,EDC)is required,it should capture the same information as listed above.28Example of an RFC Cover Sheet29Example of a Flowchart RFC(Column Type)DecisionActionEndStartContinueForm Rev ACRev Date:12/20/97Page 1 of 1MS/MT/OperatorTechnicianMfg SupervisorTop-up/Dilute chemical per Shift Engr.instruction and document it in chemical analysis recording bookCheck Deflash and Descale concentration YesWithin specwindow?NoCheck 1)Deflash rectifier2)Titanium anode plate3)Oil contamination in HP tank4)Excessive mold/resin bleed outVerify with dummyNoDocument it and inform Shift supt.YesExposed copper?YesNoRectify the problem accordingly&document it in recording bookWithin specwindow?Inform Proc./Equip.EngineerVerify with dummyNoDocument it and inform Shift supt.YesExposecopper?Exposed copperYesWithin specwindow?NoAAABBUpdateon-hold lotsin shiftly reportLast Block:Engg actions/comments:_-_Endorse RFC to Mfg for filing.30Splash checklist-confirm rejectsLast block:Engg actions/comments:_Endorse RFC to Mfg for filing.Form Rev AARev Date 12/16/97Page 1 of 1Hermetic Lid Seal Splash RFCSpec 15-608Example of a Flowchart RFC(Conventional Type)31EXERCISE 2Using the same grouping as in Exercise A:Complete the RFC flow following Steps 4 to 5Choose a reporterPresent to the class after 20 minutes32Step 6:Development Team ReviewReview the RFC to ensure correctnessReview for logic,typographical and other errors,clear and consistent wording,ease-of-use,correct formatting,infinite loops,and dead ends.33Step 7:Publish the RFCIncorporate RFC into a spec and publishThe entire RFC should be documented within the module operating spec or as an attachment.Conduct RFC training to all users and stakeholders34Documentation of RFC ResultsIf requirement is paper-based documentation:For every action item completed,RFC User toSign outside of the tool diagram for a flowchart type RFCSign outside of the“Initial”column for a tabular type RFCWhether requirement is paper-based or electronic documentation,RFC User should document the last RFC action completed and corresponding corrective actions.Example:qIn paper control charts,documentation is written on the back of the chart together with comments for the OOC points.qIn EDC,documentation is done in the Annotation portion of the EDC screen.35RFC Storage and RetentionManufacturing,or whichever group the primary RFC User belongs to,is responsible for creating a storage and retention system for documented RFC actions.Retention period for documented RFC actions must be defined.36RFC Continuous ImprovementRFC has to be reviewed periodically for improvement on documented periodic basis or whenever there is any change in the process/equipment.Check effectiveness of defined RFC action itemsEvaluate performance of machine affectedReview overall RFC usageAssess success of RFC in finding the problemRFC Owner is responsible for reviewing the RFC.RFC must be revised/updated when found to be ineffective or insufficient during the review.37 A B C D E F Last Action Completed in RFCFrequencyContinuous Improvement GuidelinesCheck effectiveness of defined RFC Action ItemsMake a frequency chart to show how many times the RFC stopped at each action item.qDoes a high frequency Last Action Completed indicate a processing,procedural,or equipment change is in order to prevent the problem?qShould a specific Action be moved closer to the front of the RFC?qDoes the problem description and solution listed under the Last Action Completed accurately reflect the actual problem and what was done to resolve it?38Continuous Improvement Guidelines(cont)Evaluate performance of machine affectedDoes the same machine#have all or most of the problems?Are the problems spread equally among all the machines?Look if there are time patterns.What do these indicate?Example:Do most of the RFCs in March stopped at Action C?Do most of the RFCs from Shift 1 stopped at Action E?39Continuous Improvement Guidelines(cont)Review overall RFC usageIs it time to remove“never used”Action Items from the RFC?Could process improvement be made based on the RFC data?Does the report highlight something that should not be part of the RFC?40Continuous Improvement Guidelines(cont)Assess success of RFC in finding the problemHow many times where the MS/MT/Operator successful in bringing the process/equipment“back up to production”without Engineering assistance?%Effectiveness=100*(#of RFC fixes by MS/MT/Operator)Total#of RFCs usedCan some skills/responsibilities be transferred from MS/MT/Operator to Engineering or vice versa?Does the RFC work successfully?Do
展开阅读全文

开通  VIP会员、SVIP会员  优惠大
下载10份以上建议开通VIP会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 包罗万象 > 大杂烩

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        抽奖活动

©2010-2026 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服