收藏 分销(赏)

外文翻译皮带输送机.doc

上传人:精**** 文档编号:2626921 上传时间:2024-06-03 格式:DOC 页数:14 大小:64.50KB
下载 相关 举报
外文翻译皮带输送机.doc_第1页
第1页 / 共14页
外文翻译皮带输送机.doc_第2页
第2页 / 共14页
外文翻译皮带输送机.doc_第3页
第3页 / 共14页
外文翻译皮带输送机.doc_第4页
第4页 / 共14页
外文翻译皮带输送机.doc_第5页
第5页 / 共14页
点击查看更多>>
资源描述

1、Design Of Belt Conveyor Transporting machine to press the operation way can is divided into:1:The leather belt type transports machine 2:Is spiral to transport machine 3:The Dou type promotes machine 4:The roller transports machine 5:Calculate to transport machine 6:The plank chain transports machin

2、e 7:The net takes to transport machine 8:The chain transports machine.1.Parameter Is general according to various condition of request, material shipping point that the material transports system, relevant of the production craft process and material of characteristic etc. to make sure each main par

3、ameter. Transport ability:The ability of transporting the transporting of machine means unit for time inside transport of material quantity.While transporting to spread a form material, with the quality or physical volume calculation that the per hour transports a material;At transport into a piece

4、product, with the number of items calculation that the per hour transports. Transport speed:The exaltation transports speed to improve the ability of transporting.When being making to lead a piece by belt conveyer and transporting length was more big, transport speed to gradually enlarge.But the tak

5、e type of high-speed operation transports machine to need to notice vibration, Zao voice and start and make etc. problem.For use chain as lead a piece of transport machine, transporting the speed should not lead greatly, in order to prevent the aggrandizement power carry a lotus.Carry on transportin

6、g of craft operation machine at the same time, transporting the speed should press to produce a craft to request an assurance. Reach a size:Transport reaching of machine a size to include belt conveyer width, lath width and anticipate Dou capacity, piping diameter and container all of etc.s.These re

7、ach a sizes to all directly influence to transport machine of transport ability. Transport length and Qing Cape:Transport circuit length and Qing Cape size to directly influence the total resistance of transporting the machine and need of power.2.Transport a machine the spot application way Constitu

8、te to carry on explaining in detail from the take type machine system first:Leather belts transporting machine is to spread a form material to transport and pack to unload an equipments most importantly, can extensively used for the mineral mountain, metallurgy, building materials, chemical engineer

9、ing, electric power, industrial realms like food processing,etc, in the coal mine, metal mineral, the steel business enterprise, port, grounds like cement works,etc a great deal of application that can see skin machine, transporting the machine can not only complete to spread a transporting of form

10、material, but also can transport into a piece material, but basis use location, work environment, transport the dissimilarity of material category, will also have bigger difference in its design and the application; Modernization of transport the machine system has higher request to the dust palliat

11、ive, is this, in each the device that transfer place and establish and sprinkle water and gather a dust, transport machine and follow line in the tape will establish and defend a breeze cover or block an aerofoil, system from list the machine constitute of, to work in the whole machine system of ope

12、rate and fix to say, want and have a foothold and divide the single machine of the tube at oneself, and want to understand mutual contact between systems, list machine again is constitute tofrom many partses, only work well the daily maintenance of each parts maintains and makes it is placed in good

13、 work status so as to ensure the safe movement of equipments; We generally will transport the use place, work environment of machine according to the take type, technique function and transport material category to wait various dissimilarity with satisfy various forms of homework work condition, in

14、addition to in addition to transporting machine, the in general use leather belt of more adoption also various special kind tapes of new structure transport machine and have a mainly having of the representative among them:Big Qing Cape take type machine, deep slot take type machine and press take t

15、ype machine, take care of the form take type, the air cushion take type, the flat surface turn take type, the line friction type, wave-like in shape the belt conveyer type blocking a side transport machine etc. and carry on a thin method for turning and canning exist various classifications and make

16、 following introduction now: Press the use classification, there is in general use ambulation type, under the well choice type, the strip mine is used a fixed type, special kind structure type, can move a place type and transport machine, load machine appropriation redistribution function type, the

17、big Qing Cape type transports machine etc., generally speaking transport machine inside the short distance factory can complete level, up the luck or bottom carries, canning go against the wood grain type leather belt machine can be used for double to transport a material, hang arm machine usually i

18、nstall anticipate on board in the heap, and can turn round, line up the function of soil or cloth by realization, but Gao Jia Ji propped up by in the door usually match with other spread and anticipate and handle an equipments common use, for example give or get an electric shock and constuct a medi

19、um application in water, can install standard in the center frame, the machines mounting places on the track Zhen, easy to move and place; Press the category of transporting the material to categorize, have the generally lax material is used of, the strong and tough material is used of and list piec

20、e the leather belt used in material transport machine etc. and press the rubber conveyance takes a loading segment of position to categorize, include a leather belt loading segment at top of and loading segment at underneath of and at the same time loading segment at up underneath of double to trans

21、port machine three, the use double can distinguish to transporting machine at up branch and bottom branch transport a material, but for keeping material contact noodles dont produce a change and need to bring in to go to the rubber to be periodically inside out.3.Categorize Transporting machine gene

22、rally and pressing already didnt lead piece to carry on a classification and had to lead a transporting of piece machine to generally include to lead a piece, loading to reach a piece, drive device, bring to the stretch device and change to accept an etc. to the device and.Lead a piece to in order t

23、o deliver to lead dint, can adopt belt conveyer and lead chain or steel wire rope;The loading reaches a piece to in order to accept to put a material and has already anticipated Dou and bracket or mourns to have.etc.;Drive device to transport machine with the power, generally from electric motor, de

24、celerate a machine and make machine(stop a machine) etc. to constitute;Bring to the stretch to equip to generally have the Luo pole the type and heavy hammer type 2 kind, can make to lead a piece to keep certain tension and hang a degree, transport machine by assurance normal operation;Pay to accept

25、 a piece to in order to accept to give to lead piece or loading to reach a piece, can adopt to give Gun and roll an etc.Having the structure characteristics that lead the transporting of piece machine is:Be delivered a material and pack reaching with the loading leading a link together inside the pi

26、ece, or directly pack in leading a piece(is like belt conveyer), led a piece to once round each roller or the chain round beginning and end and connect with each other, formation include and deliver a having of material carry branch and dont deliver a material of have never carried shutting of branc

27、h and match wreath road, make use of lead continuous sport of piece and transport a material.This type ofly transporting model is numerous, there is mainly a take type transporting a machine, plank type and transporting a machine, small car type and transporting machine, escalator, automatic sidewal

28、k, paring off plank and transporting machine, covering up and paring off plank and transporting a machine, Dou type and transporting a machine, Dou type and promoting machine and hanging and transporting machine and build on stilts a cableway.etc. The structure that didnt lead transporting of piece

29、machine constitutes each not same, use to the work of transporting the material to reach a piece as well not same.Their structure characteristicses are:Make use of a work to reach a revolving of piece to exercise or the back and forth exercise, or make use of lie quality to make the material transpo

30、rt forward in the fluxion in the piping.For example, the Gun son transports the work of machine to reach the piece as a series of Gun son, the Gun son makes to revolve sport to transport a material;Is spiral to transport the work of machine to reach a piece for spiral, helix at anticipate and make t

31、o revolve sport in the slot with follow anticipate slot to push to send a material;The vibration transports the work of machine to reach piece in order to anticipate slot, anticipate slot to make back and forth sport with transport Be placed to among them of material etc.Install (1)The fixed type tr

32、ansports machine should by rule gearing method gearing at fix of foundation up.The ambulation type transports machine formally before circulating and should live wheel with the wedge Xie or uses to make a machine to stop.So as not to take place to take a stroll in the work, there is the passage that

33、 many sets , between machine and machine, there shoulded be one meter between wall and machine while transporting a parallel homework of machine. (2)The beard checks an each operation part, tape to take to button up to equip with loading before using whether normal, whether protection equipments is

34、well-found.The tape rises a tight degree beard before starting the adjustment is to suitable extent. (3)Leather belts transporting machine should get empty to carry a start.Waiting to revolve normal rear can go into to anticipate.Drive after forbiding to go into first to anticipate. (4)There are few

35、 set that when transport machine to establish to circulate should from unload to anticipate to carry a beginning, the sequence starts.After revolving as usual all, the square can go into to anticipate. (5)Appear in the movement when the tape runs to be partial to a phenomenon should park the car adj

36、ustment, can not force an use, so as not to wear away edge and increment burden. (6)Work environment and be sent material temperature not to must be higher than 50 and be lower than-10 .Can not transport the material of having sour alkaline oil and organic melting agent composition. (7)Forbid pedest

37、rian or multiply by a person on the belt conveyer. (8)Have to stop going into first to anticipate before parking the car, wait leather belt up save to anticipate to unload to the utmost a square can park the car. (9)Transporting the machine electric motor has to insulate good.The ambulation type tra

38、nsports machine electric cable to pull and drag along indiscriminately.The dynamoelectric confidential credibility connects ground. (10)The leather belt beats slippery strictly forbid to by hand pull leather belt, so as not to take place trouble.5.Adjust to try (1) Each equipments with meticulous ca

39、re adjusts to try to transport machine after installing and satisfies a drawing request. (2) Each deceleration machine exercises parts to add to note to correspond lubricant. (3) The gearing after transporting machine to attain to request each single set equipments carries on beginning to work to ma

40、ke run-in, and knot to put together to adjust to try to transport machine to satisfy an operative request. (4) Adjust to try the electricity part of transporting the machine.Include to connect adjusting of line and action to try to the normal regulations electricity, make the equipments have good fu

41、nction, attain the function and status of design.6.Transport machine to block knothole 2 kinds of boring crafts (1)Blow up boring:The material after the irradiation of continuous laser and centrally forms one cave pit, then from and laser beam the coaxial oxygen flow to clean meltdown material and f

42、orm one bore very quickly.The size of general bore is as thick relevant as plank, blow up to bore hole the average diameter as thick plank half, therefore blow up to bore hole bore path bigger to thicker plank, and not circle, should not in requesting higher spare parts use(if the petroleum Shai sew

43、s a tube), can be used for a waste up.In addition because of bore hole use of oxygen pressure with incise homology, splash a little bit greatly. (2)Pulse boring:The pulse laser that adopts high peak value power makes a little amount material melt or vaporizes, in common use air or nitrogen spirit ar

44、e to lend support to air and oxidize to make bore expand because of putting heat by decrease, the air pressure more incises of the oxygen pressure is small.The particle jet with small creation of each pulse laser gradually goes deep into, therefore slab boring time takes several seconds.Once bore ho

45、le completion, immediately change assistance air into oxygen to carry on incising.Boring hole diameter like this is smaller, its boring quality is better than to blow up boring.Not only should have higher exportation power for the laser machine used by this;The time and space characteristic that mor

46、e important time ties, therefore the general crosscurrent carbon dioxide laser machine can not adapt to the request that the laser incises.In addition the pulse bores hole to also have the more dependable spirit road the control system to carry out cutting over of air category, air pressure and bore

47、 hole a horary control.皮带输送机 输送机械按运作方式可以分为:1:皮带式传输机2:螺旋输送机3:斗式提升机4:滚筒运送机5:计量运输机6:板链式运送机7:网带输送机8:链条运输机。1.参数 一般是根据各种条件的要求,材料运输点,物料输送系统、相关的工艺和材料的生产过程特性等来确定各主要参数。 输送能力:输送机的运送能力是单位时间内输送的物料量。传播形式以材料、物理与质量或体积计算:输送成件物品时,每小时运送材料以运输件数计算, 输送速度:提高输送速度提高输送能力。以输送带作牵引件通过传送带或输送长度大时,运输速度将逐渐增大。但是高速运输的操作机器需要注意振动、噪音、启动

48、和制动等问题。使用链条作为牵引件的输送机等,输送速度不应导致极大,以防止增大动力载荷。运输艇操作机器的同时,输送速度应该压制以产生工艺要求的保证。 构件尺寸:运输到达机器的尺寸包括输送带宽度,板条宽度和料斗容积、管道直径和容器大小等。所有大小直接影响输送机的输送能力。 运输长度和倾角:输送线路长度和倾角大小直接影响总的电阻和运输机器时,需要的功率。2.运输机现场应用方式 首先从带式机系统的组成进行讲解:皮带运输机最重要的是材料的运输与装卸设备,可以广泛用于矿物山、冶金、建材、化工、电力、工业领域、食品加工等,在煤矿、金属矿产、钢铁商业企业、港口、水泥等均有进行大量的应用,运输机械不仅能够完成散

49、状物料的输送,还可以输送成件材料,但依据使用地点、工作环境、不同类别的材料运输,还将有较大的差异,其设计和应用; 现代化的运输机系统对防尘具有更高的要求,为此,在每个装置的转接处设有洒水和一个灰尘收集装置,在运输和后续在线机器带将建立和保卫防风罩,系统是由单机构成的,对在整机系统中工作的操作和修理者来说,要立足于自己分管的单机,并了解更多的相互触点之间的系统,单机又是由许多部件组成的,只有做好日常的维护和保养各部件使得它被放置在良好工作状态,才能确保市场备的安全运行; 我们通常根据运输机使用场所,工作环境,技术功能和运输类等各种材料满足各种形式的作业的工作状态,除较多采用的通用皮带输送机外,还有多种新型结构的特种胶带输送机,其中具有代表性的主要有:大倾角带

展开阅读全文
相似文档                                   自信AI助手自信AI助手
猜你喜欢                                   自信AI导航自信AI导航
搜索标签

当前位置:首页 > 包罗万象 > 大杂烩

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服