收藏 分销(赏)

土木工程毕业设计外文翻译.doc

上传人:精*** 文档编号:2144908 上传时间:2024-05-20 格式:DOC 页数:19 大小:159.04KB
下载 相关 举报
土木工程毕业设计外文翻译.doc_第1页
第1页 / 共19页
土木工程毕业设计外文翻译.doc_第2页
第2页 / 共19页
土木工程毕业设计外文翻译.doc_第3页
第3页 / 共19页
土木工程毕业设计外文翻译.doc_第4页
第4页 / 共19页
土木工程毕业设计外文翻译.doc_第5页
第5页 / 共19页
点击查看更多>>
资源描述

1、土木工程毕业设计外文翻译 作者: 日期:2 个人收集整理 勿做商业用途Building construction concrete crack ofprevention and processingAbstractThe crack problem of concrete is a widespread existence but again difficult in solve of engineering actual problem, this text carried on a study analysis to a little bit familiar crack problem

2、in the concrete engineering, and aim at concrete the circumstance put forward some prevention, processing measure。 Keyword:Concrete crack prevention processingForeword Concretes ising 1 kind is anticipate by the freestone bone, cement, water and other mixture but formation of the in addition materia

3、l of quality brittleness not and all material.Because the concrete construction transform with oneself, control etc. a series problem, harden model of in the concrete existence numerous tiny hole, spirit cave and tiny crack, is exactly because these beginning start blemish of existence just make the

4、 concrete present one some not and all the characteristic of quality.The tiny crack is a kind of harmless crack and accept concrete heavy, defend Shen and a little bit other use function not a creation to endanger.But after the concrete be subjected to lotus carry, difference in temperature etc。 fun

5、ction, tiny crack would continuously of expand with connect, end formation we can see without the aid of instruments of macro view the crack be also the crack that the concrete often say in the engineering.个人收集整理,勿做商业用途个人收集整理,勿做商业用途 Concrete building and Gou piece usually all take sewer to make of,

6、because of crack of existence and development usually make inner part of reinforcing bar etc. material creation decay, lower reinforced concrete material of loading ability, durable and anti- Shen ability, influence building of external appearance, service life, severity will threat arrive peoples l

7、ife and property safety.A lot of all of crash of engineerings is because of the unsteady development of the crack with the result that.Modern age science research with a great deal of of the concrete engineering practice certificate, in the concrete engineering crack problem is ineluctable, also acc

8、eptable in certainly of the scope just need to adopt valid of measure will it endanger degree control at certain of scope inside.The reinforced concrete norm is also explicit provision:Some structure at place of dissimilarity under the condition allow existence certain the crack of width。But at unde

9、r construction should as far as possible adopt a valid measure control crack creation, make the structure dont appear crack possibly or as far as possible decrease crack of amount and width, particularly want to as far as possible avoid harmful crack of emergence, insure engineering quality thus.个人收

10、集整理,勿做商业用途本文为互联网收集,请勿用作商业用途 Concrete crack creation of the reason be a lot of and have already transformed to cause of crack:Such as temperature variety, constringency, inflation, the asymmetry sink to sink etc. reason cause of crack;Have outside carry the crack that the function cause;Protected env

11、ironment not appropriate the crack etc。 caused with chemical effect.Want differentiation to treat in the actual engineering, workout a problem according to the actual circumstance. In the concrete engineering the familiar crack and the prevention 1.Stem Suo crack and prevention Stem the Suo crack mu

12、ch appear after the concrete protect be over of a period of time or concrete sprinkle to build to complete behind of around a week.In the cement syrup humidity of evaporate would creation stem Suo, and this kind of constringency is cant negative。Stem Suo crack of the creation be main is because of c

13、oncrete inside outside humidity evaporate degree dissimilarity but cause to transform dissimilarity of result:The concrete is subjected to exterior condition of influence, surface humidity loss lead quick, transform bigger, inner part degree of humidity variety smaller transform smaller, bigger surf

14、ace stem the Suo transform to be subjected to concrete inner part control, creation more big pull should dint but creation crack。The relative humidity is more low, cement syrup body stem Suo more big, stem the Suo crack be more easy creation.Stem the Suo crack is much surface parallel lines form or

15、the net shallow thin crack, width many between 0。050。2 mm, the flat surface part much see in the big physical volume concrete and follow it more in thinner beam plank short to distribute。Stem Suo crack usually the anti- Shen of influence concrete, cause the durable of the rust eclipse influence conc

16、rete of reinforcing bar, under the function of the water pressure dint would creation the water power split crack influence concrete of loading dint etc.Concrete stem the Suo be main with water ash of the concrete ratio, the dosage of the composition, cement of cement, gather to anticipate of the do

17、sage of the property and dosage, in addition etc. relevant。本文为互联网收集,请勿用作商业用途个人收集整理,勿做商业用途 Main prevention measure:While being to choose to use the constringency quantity smaller cement, general low hot water mire and powder ash from stove cement in the adoption, lower the dosage of cement.Two is a c

18、oncrete of stem the Suo be subjected to water ash ratio of influence more big, water ash ratio more big, stem Suo more big, so in the concrete match the ratio the design should as far as possible control good water ash ratio of choose to use, the Chan add in the meantime accommodation of reduce wate

19、r.Three is strict control concrete mix blend with under construction of match ratio, use of concrete water quantity absolute cant big in match ratio design give settle of use water quantity。Four is the earlier period which strengthen concrete to protect, and appropriate extension protect of concrete

20、 time.Winter construction want to be appropriate extension concrete heat preservation to overlay time, and Tu2 Shua protect to protect.Five is a constitution the accommodation is in the concrete structure of the constringency sew.个人收集整理,勿做商业用途本文为互联网收集,请勿用作商业用途 2.The Su constringency crack and preven

21、tion Su constringency is the concrete is before condense, surface because of lose water quicker but creation of constringency。The Su constringency crack is general at dry heat or strong wind the weather appear, cracks much presenting in the center breadth, both ends be in the centerthin and the leng

22、th be different, with each other not coherent appearance。Shorter crack general long 2030 cm, the longer crack can reach to a 2-3 m, breadth 1-5 mm。It creation of main reason is:The concrete is eventually almost having no strength or strength before the Ning very small, perhaps concrete just eventual

23、ly Ning but strength very hour, be subjected to heat or compare strong wind dint of influence, the concrete surface lose water to lead quick, result in in the capillary creation bigger negative press but make a concrete physical volume sharply constringency, but at this time the strength of concrete

24、 again cant resist its constringency, therefore creation cracked.The influence concrete Su constringency open the main factor of crack to have water ash ratio, concrete of condense time, environment temperature, wind velocity, relative humidity.etc.。个人收集整理,勿做商业用途个人收集整理,勿做商业用途 Main prevention measure

25、:One is choose to use stem the Suo value smaller higher Huo sour salt of the earlier period strength or common the Huo sour brine mire.Two is strict the control water ash ratio, the Chan add to efficiently reduce water to increment the collapse of concrete fall a degree and with easy, decrease cemen

26、t and water of dosage.Three is to sprinkle before building concrete, water basic level and template even to soak through。Four is in time to overlay the perhaps damp grass mat of the plastics thin film, hemp slice etc。, keep concrete eventually before the Ning surface is moist, perhaps spray to prote

27、ct etc. to carry on protect in the concrete surface。Five is in the heat and strong wind the weather to want to establish to hide sun and block breeze facilities, protect in time。文档为个人收集整理,来源于网络本文为互联网收集,请勿用作商业用途 3.Sink to sink crack and prevention The creation which sink to sink crack is because of t

28、he structure foundation soil quality not and evenly, loose soft or return to fill soil dishonest or soak in water but result in the asymmetry sink to decline with the result that;Perhaps because of template just degree shortage, the template propped up to once be apart from big or prop up bottom loo

29、se move etc. to cause, especially at winter, the template prop up at jelly soil up, jelly the soil turn jelly empress creation asymmetry to sink to decline and cause concrete structure creation crack.This kind crack many is deep enter or pierce through sex crack, it alignment have something to do wi

30、th sinking to sink a circumstance, general follow with ground perpendicular or present 30 s-45 Cape direction development, bigger sink to sink crack, usually have certain of wrong, crack width usually with sink to decline quantity direct proportion relation.Crack width under the influence of tempera

31、ture variety smaller.The foundation after transform stability sink to sink crack also basic tend in stability.个人收集整理,勿做商业用途文档为个人收集整理,来源于网络 Main prevention measure:One is rightness loose soft soil, return to fill soil foundation a construction at the upper part structure front should carry on necessi

32、ty of Hang solid with reinforce。Two is the strength that assurance template is enough and just degree, and prop up firm, and make the foundation be subjected to dint even。Three is keep concrete from sprinkle infusing the foundation in the process is soak by water。Four is time that template tore down

33、 to cant be too early, and want to notice to dismantle a mold order of sequence。Five is at jelly soil top take to establish template to notice to adopt certain of prevention measure.个人收集整理,勿做商业用途个人收集整理,勿做商业用途 4.Temperature crack and prevention Temperature crack much the occurrence is in big surface

34、or difference in temperature variety of the physical volume concrete compare the earth area of the concrete structure。Concrete after sprinkling to build, in the hardening the process, cement water turn a creation a great deal of of water turn hot, 。(be the cement dosage is in the 350-550 kg/m 3, eac

35、h sign square the rice concrete will release a calories of 17500-27500 kJ and make concrete internal thus the temperature rise to reach to 70 or so even higher)Because the physical volume of concrete be more big, a great deal of of water turn hot accumulate at the concrete inner part but not easy se

36、nd forth, cause inner part the temperature hoick, but the concrete surface spread hot more quick, so formation inside outside of bigger difference in temperature, the bigger difference in temperature result in inner part and exterior hot the degree of the bulge cold Suo dissimilarity, make concrete

37、surface creation certain of pull should dint。When pull should dint exceed the anti of concrete pull strength extreme limit, concrete surface meeting creation crack, this kind of crack much occurrence after the concrete under construction period.In the concrete of under construction be difference in

38、temperature variety more big, perhaps is a concrete to be subjected to assault of cold wave etc。, will cause concrete surface the temperature sharply descend, but creation constringency, surface constringency of the concrete be subjected to inner part concrete of control, creation very big of pull s

39、hould dint but creation crack, this kind of crack usually just in more shallow scope of the concrete surface creation。文档为个人收集整理,来源于网络文档为个人收集整理,来源于网络 The alignment of the temperature crack usually none settle regulation, big area structure the crack often maneuver interleave;The size bigger structure

40、 of the beam plank length, the crack run parallel with short side more;Thorough with pierce through sex of temperature crack general and short side direction parallelism or close parallelism, crack along long side cent the segment appear, in the center more airtight。Crack width the size be different

41、, be subjected to temperature variety influence more obvious, winter compare breadth, summer more narrow.The concrete temperature crack that the heat inflation cause is usually in the center the thick both ends be thin, but cold Suo crack of thick thin variety not too obvious。The emergence of the th

42、is kind crack will cause the rust eclipse of reinforcing bar, the carbonization of concrete, the anti- jelly which lower concrete melt, anti tired and anti- Shen ability etc。.文档为个人收集整理,来源于网络个人收集整理,勿做商业用途 Main prevention measure:One is as far as possible choose to use low hot or medium hot water mire

43、, like mineral residue cement, powder ash from stove cement.。.etc.。Two is a decrease cement dosage, cement dosage as far as possible the control is in the 450 kg/m 3 following。Three is to lower water ash ratio, water ash of the general concrete ratio control below 0.6.Four is improvement the bone an

44、ticipate class to go together with, the Chan add powder ash from stove or efficiently reduce water etc。 to come to reduce cement dosage and lower water to turn hot。Five is an improvement concrete of mix blend to process a craft, lower sprinkle of concrete to build temperature。Six is the in addition

45、that the Chan add a have of fixed amount to reduce water and increase Su, slow Ning etc。 function in the concrete, improvement the concrete mix to match a thing of mobility, protect water, lower water to turn hot, postpone hot Feng of emergence time.Seven is the heat season sprinkle to build can the

46、 adoption take to establish to hide sun plank etc。 assistance measure control concrete of Wen Sheng, lower to sprinkle temperature of build the concrete。Eight is the temperature of big physical volume concrete should the dint relate to structure size, concrete structure size more big, temperature sh

47、ould dint more big, so want reasonable arrangement construction work preface, layering, cent the piece sprinkle to build, for the convenience of in spread hot, let up control。Nine is at great inner part constitution of the physical volume concrete cool off piping, cold water perhaps cold air cool of

48、f, let up concrete of inside outside difference in temperature。Ten is the supervision which strengthen concrete temperature, adopt to cool off in time, protection measure.11 is to reserve temperature constringency to sew.12 is to let up to control, sprinkle proper before building concrete in the Ji rock and old concrete top build a 5 mm or so sand mat a layer or usage asphalt etc. material Tu2 Shua.13 is to strengthen concrete to protect, the concrete after sprinkle build use moist grass Lian in time, hemp slices etc。 overlay, and attention sprinkle water t

展开阅读全文
相似文档                                   自信AI助手自信AI助手
猜你喜欢                                   自信AI导航自信AI导航
搜索标签

当前位置:首页 > 学术论文 > 毕业论文/毕业设计

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服