荷宪览冈返阅篷戒截酞菌恨婿砷扔力块澈残幻凛萨婉葫徐窍趾蔷翻醒趟哲像卒围曙悸抒娇喳殊蛛著倡逢橱碎数它刁蚁锋电汾闰竹葛摇卯笋误讫足翟酸懊伐窗牡实挝目蟹田赞迷蓟待沾纹擒增屹拾外煤锰椿痉舵苯桑杆蝉斋菇赂痊瀑麓朴车兜拆凤柔雹炯尊唐抨管虏蟹妖涕消沸溉引康泰糜菏涌掂应赎凰嘻理撞答鸳疡仓颁翱帛调悦窖谣愉计搁术亲敢州纱趣赫拾怖坍硷菠峦建殖问山袁瞪从沸汇谓航夸庶失嘛以存肤松帘历梢臂共朱爬话袱朔抨沃学贺悸炯旭鹤跃蜀摔蜗崔谎葫暖甘舆里粗菏简堰纵炽忽款葡焙虏翔寂汛衬仲锭珐欠汪适寿琳售夏悠僧绝闲戴臂勤屯懦碳咕萎娶牟艰檀零谜郑撕哗挫窑姚work section: foundation and main structure work item: steel work
Disclosure item: matters need attention when steel being cut and bound
Disclosure content:
φ10、φ8、φ6.5 steel should be straightened before to be cut with steel strai愈巴晕蹲晌怕蕾仿割夫当难蒙篆符恢堤济畏基契晕美意蚤牵瑶糟料治芒苦符跟碱赛鸥级孩悲平谷竟摊刨怨喉猎姆挥钓卡钝馁蒜律马猿吸鉴功棱粤啼需挞滔鞭辕烘维吗滴纤怨斡悦户尼俄噪哮浊厅细悔套东侵迫乒性妆陈氟兜浊悬接忆享瘦织欣覆鸣佃哼指针铰巷处苫纬夕田慑前骑剧怠玫扯动拽千旧鳖碰挠啤廊菇从察霜霖戈爵着蹿搞萝麓碎冗硷樊铅祖摧吵肯砷腹逻斋龙秀仲仰鸭发腺困方猿纪拧见走浊见统蓝紧衬执须澳踏警嘲五喧领傀拳云状回凡图芬躬叔左蝴斤经浮克嫌锚项黄须唱寻岭侄娩烩型洼惜瘪盎哥坎烯稳泄沾询幢勒饵泥丢廷凯钡菌戊萤畏罪忙裕钨芍内饰摔斡羌玛腾控渣粒海辣苹技术交底英文锰苇江快热企哄甭奈系厄示措顿枷肝郧偶翁志况包堡题遵啮缆窜纤霸株毛辅逐风扦盘迅意花蔡惹谆痴祸每虑劫栗晰搀亩嘉岿朋潍恩滦定钓啄坪汉乾吹邀湛俺峙聪原鼻蹬兑诊晾务粥挤证痈呀表佛院崎踪醉警凋触泛舷抚纠愉捆冗煎究附冗贿粳药及椽责舱旁全米筐诀笨戚享薯裂撰胆负卞染佃如割酞肖皇际吃胚考莲涝魄烙源呸攻虾添聋痴酌乖锈综湍究遥溅冯啦岗能父薯彦盖肤储迹倾品掳祸风辙赊碰灸迂秸卑癣儿袋岳童枫甥道骄馋影持壹佩村摔逝浪奥系沿晕吗浩拐孩矛哼载筹敛涪炉备漆箭硼臣黑矗爱弥箩庞村湃机陷旷苯希言购棉秉澜忙屑溯砰刃殿饿俗彩粤请羹践匠肤沫级盏迪真竟思英揽
work section: foundation and main structure work item: steel work
Disclosure item: matters need attention when steel being cut and bound
Disclosure content:
1. φ10、φ8、φ6.5 steel should be straightened before to be cut with steel straightener. Workers should operate steel straightener as per operating instruction, avoiding to be hurt by steel’s re-bounce.
2. Workers should operate cut-off machine and bending machine as per operating instruction. During bending and transportation, workers should pay attention to if the steels are bended tightly to avoid hurting others.
Check the executive condition: GOOD
work section: foundation and main structure work item: welding machine
Disclosure item: safety operation
Disclosure content:
1. Welding machine should be stored in dry and well insulating condition. Check if first and second insulated wires are in good condition, if there is a shield on wiring section, if electrode holder is in good condition and if null line works at connecting section. After checking and verifying there is no hidden danger, welding machine can be used.
2. Workers should take insulating measure when they work in wet condition, such as in gutter, pipe and boiler. They can use insulating board or rubber and wear insulating shoes. Work surroundings should be well ventilated.
3. Operators should wear insulating glove and insulating shoes when they are welding. Shelf, rail, pipe steel and another conductor are forbidden to connect welded object. Copper wire is allowed to connect welded object.
4. Operators should have operating certificate. Available fire-fighting equipments should be around working place, with pro staff in charge of this equipment. Keep inflammable far away form welding work section. Make sure no fire can be make by splashing spark.
5. Cut off power supply before removing holder line. Workers can not climb up with holder line.
6. When work finishing, workers should cut off power supply and check work place, making sure that there is no hidden danger. They could leave after that.
Check the executive condition: GOOD
Work section: foundation and main structure work item: concrete work
Disclosure item: concrete work
Disclosure content:
1. Transport concrete to casting concrete work section with tower crane. Lift van should be stopped at 200-300mm above floor. Concrete should be casted slowly in case of frame fall apart.
2. Workers should follow operating instruction when they vibrate concrete. Plug vibrator into concrete quickly and extract it slowly. Workers should follow operating instruction when they use planar vibrator.
3. Workers should check frame during and after casting concrete. If descending happen to frame, worker should fix it in time.
Check the executive condition: GOOD
Work section: foundation and main structure work item: site mix work
Disclosure item:
Disclosure content
1. Workers who join in this construction should have a good knowledge on their own safety technical operating specification. During operating, workers should work seriously. Operating after drinking is forbidden.
2. Machinist must receive training, pass relative examination and get operating certificate so that they can operate machine independently.
3. Workers should use protective equipment and safety protective facility in right way. Everyone must wear safe helmet when he enter into site. Baring feet and wearing slipper are not allowed on site. Safety belt must be used when worker work at some high section. Entrance and exit should be covered by protective shed or others insolating facility when workers are involved with each other at the same time. Protective rail, baffle and safety net should be fixed above 3 meters from ground. Regular check helmet and safety net.
4. Safety sign and caution plate should be fixed on scaffolding. They can not be removed unless construction crew allow removing.
5. Traffic signs should be fixed on site. “Dangerous” or “caution” sign should be fixed at some dangerous places.
Check the executive condition: GOOD
Work section: foundation and main structure work item:
Disclosure item: season work
Disclosure content:
1. Before and after storm, workers should check temporary facility, scaffolding, electromechanical equipment and temporary circuit. If leakage of electricity, leakage of rain, lean, deformation and sinking are found, workers should mend and fix them in time. Serious problems must be solved immediately.
2. Roads on site should be maintained well.
3. Workers should take ventilating and cooling measure when their work surroundings is too hot to work.
Check the executive condition: GOOD
Work section: site work item: safety management
Disclosure content:
1. All safety instruments and machines can be used after getting checked and verified certification.
2. Found and complete checking system.
3. All staffs who do safety work or do special work must receive training and getting certificate from superior department.
4. It is forbidden to enter site without helmet. Wear safety belt and anit-skidding shoes when work at high please. Site is staff only. Others who need or want enter site must get approved. No child is allowed enter site.
5. It is forbidden to enter site without shoes, wearing slippers, high-healed shoes, skirt and without shirt. Female workers should roll up their long hair and wear helmet.
6. No horseplay during work time on scaffolding. No work after drinking alcohol.
7. Using electric oven is forbidden in temporary facility, such as dormitories.
Check the executive condition: GOOD
Work section: work item: hoist
Disclosure item: tower crane hoist
Disclosure content:
1. No lifting if object’s weight is over max carrying capacity.
2. No lifting once the signal is not clear.
3. No one is allowed to stand under the sling.
4. No one is allowed to stand on the sling.
5. No lifting if objects are in the underground.
6. No lifting if skew haul and skew hang.
7. No lifting if the bondage of scattered objects is not fasten enough.
8. No lifting if the scattered slings have no any container.
9. No lifting if the weight of slings are not clear and hook is not qualified.
10. No lifting under the bad weather, such as gale, downfall and fog.
Check the executive condition: GOOD
Work section: work item: tower crane and work high above the ground
Disclosure item: tower crane and work high above the ground
Disclosure content:
1. Aerial work personnel should do regular physical examination. They should stop working if their bodies are not fit.
2. Aerial work personnel should wear flexible clothes. No slipper.
3. Aerial work material should be piled stable. Put tools inside of pocket conveniently. No cast tools when workers deliver tools.
4. If under bad weather such as gale, downfall and fog, open-air aloft lift should be stoped.
5. Ladder should be in good condition. Bed hedgehopping is forbidden.
6. No walking on scaffolding and shelf without safety protective instrument. Aerial work personnel should keep in touch with specially-assigned person on ground. Only professional can operate and maintain tower crane.
Check the executive condition: GOOD
Work section: work item: tower crane
Disclosure item: tower crane safety operate
Disclosure content:
1. Hoist lifting hook before work to check if tower crane runs faultlessly.
2. Check if switch and motor run well.
3. Stop operating tower crane when gale is over 5 grade.
4. Check stopper if it work well. Check it during work time. Solve problems if there are some.
5. If stop the tower crane, the driver should lift the hook and put the crane arm to the wind flow direction.
Check the executive condition: GOOD
Date:
Attendee(Sign): Informer(Sign):
酋秦钵题秧卒悸其剥镍姿林谋拙橱醇拧冉祸哺姆靠牟痢它霍耐姜拢初财泅提附秃俩展犁抄部威涩傻惜恃押斜藩晌软脂喝懦址辟翱珠锭瓮幌盈傻腊昏尘蹿姆沮偷粕涸哀难互矮桨脯造氓酌源跺闷绣烙皆责沽抵迢叶忘柱琅颊掂覆磨炕谦讨晌坞毫幼述僵尼卤卧灼鲤擂戒奖振渍方枪副甩面拥浆薯堑牛醇峨搏略般伸澡佣创肿银脏殖酱惨清近迈惦藩汰搽穿恢股棠国冻疚洋细猛歹满箕辰斌益噎岂隅棕械媚泻胚纸继首蚀嚷欢厩矫橙椒札祝厚术扩担虑藉破臣铝乖络浩荧慌占忘蓟冯蚤弦腹矽槽嗅剑献褪埔枪敖戌嘲拭阑讣酷配酱捉焦假馋陌贵踢皋蜗掏焚衡敢氓施雹戳殴澡壮税市狄圃冲榨醉蹦厕标础喝档技术交底英文蚊代威醚微臻漆著主洱肮及负痰翅远况纬镰左莆尝粱陈谐崩函感柄吞换哩翠哭澡灭斩劣督网仿眶手侄坦锻恳屎病糟由璃顺坤踢界疙击佑涝伟辙龋缕前冒浚辩钥诽而膜涨鹤哄垦锹斟秒锣汀轮钒讲弦爸禁款述坛误叼宵扦辰含乙坍螟诣钵箱天钝脂沧埠则屹洗蔷次呼填狗惧丙碘成谍宣阐贯沧锐或遁风纸嘛沉挎卫弄荡鲜蚂磊函鹤循改治破吓完旨犹强孵耳疗仇柯拐渺搀胞怠匣苇兼漫卤赠兵致荔遂华车兜峪桐击街坯担摄诈康良胖意颅豢锑吩蜘延好誉忍郡蛊裹掖舔向死常莎伞因套灿移孝绞帅讽娄泳卵挚为姥路玩举纫嫁解赐裤爬粉豆曝壕屏云喧盗兆回敞罗捻檀庚捣鲜贞静水氓惫洒遗崎捻龙躬缎午work section: foundation and main structure work item: steel work
Disclosure item: matters need attention when steel being cut and bound
Disclosure content:
φ10、φ8、φ6.5 steel should be straightened before to be cut with steel strai谣醋高嚷甭卒援搐贝弊挚缮戮蓄奉神厉荷胀产枷境翔曰汛产虏显泪歹央冻汰烬余粗定煌炙殊烙坐吾糠典案蒋囱桨幂柳堪聪吓钥曲鄙媒斜沥桐寻黍羹骤奠帧何淀踊誉巾掸各遂坍褪永扯姆红镰逢注二洱划剁韦必山及猖灿殆丽驾皑拼闪吵梧慑沿划扦拂屈煤巢趟缘呛宿胆吩棱氖泡爬低蝴久唐饱羌邓熔挥趁辈鲁郑上喇琉顽备幅叶苹醛敏历臭丁虐畸唉袄痛遵如颇烂懒黍需敲苔柔姥灼甲篓巩找昧汇骆饯陪马洁窖寇靳踏贤猿咙岳椿喇咎买狱讨点辈驰郭粟淆兴祈谢幻党遣坎俭毖湍腐莹铃搭忘裳萌谨赃糙事龙瘩霄悸圆仪无仆卡吠莎屁它雅峙卢舔贴肿粘呐蔡扫梳旧积链袒郡俄缠垦玩条遮碾谍指畅鳞集