收藏 分销(赏)

SMEDTPM之快速换模.pptx

上传人:精**** 文档编号:14520431 上传时间:2026-10-05 格式:PPTX 页数:53 大小:846.73KB 下载积分:10 金币
下载 相关
SMEDTPM之快速换模.pptx_第1页
第1页 / 共53页
SMEDTPM之快速换模.pptx_第2页
第2页 / 共53页


点击查看更多>>
资源描述
,*,SMED-Quick Changeover,Contents,Introduction,Background and History,Components and Implementation,Changeover and Changeover Time,Traditional Setup,SMED(Single Minute Exchange of Dies),SMED Process Steps,Ideas for Improvement,Knowledge Check,Introduction,Quick Changeover is one of the core concepts of lean manufacturing,A rapid and efficient way of converting a process from running the current product to running the next product,Also known as“single minute exchange of dies”(SMED)derived from the desire to change over any process within minutes instead of hours,Reduces the waste of inventory by creating shorter production runs that better align with customer demand,Background and History,Developed in the late 1950s and early 1960s by Shigeo Shingo,chief engineer of Toyota,Land costs in Japan were very high,therefore it was not feasible to store large inventories of vehicles,Quick Changeover provided a solution to the economic lot size problem of traditional manufacturing,which promoted large lot sizes,Components and Implementation,Changeover and Changeover Time,Traditional Setup,SMED(Single Minute Exchange of Dies),SMED Process Steps,Ideas for Improvement,Changeover Defined,Definition:,Changeover is the total process of converting a machine or line from running one product to another,Changeover Time Defined,Definition:,Changeover time is the total elapsed time between the last unit of good production of the previous run,at normal line efficiency,to the first unit of good production of the succeeding run,at full line efficiency.,The Objective,Objective:,Reduce changeover from hours to single minutes,Time Out to Roll Your Eyes,Its all been said before,“Be serious”,“Cant really happen”,“What are you smoking”,“Our operation is unique”,“Thats only in low-tech molding or stamping”,“We cant move any faster”,“Were already the best at what we do”,Before SMED,Typical changeover:1 2 hours,Quick Changeover is one of the core concepts of lean manufacturing,Step 1:Observe and Record,Setup time reduction of 90%and more is common,16、少年十五二十时,步行夺得胡马骑。,Step 1 Observe and record.,Problem:“only the last turn of a nut or bolt tightens it and only the first one that loosens it”.,Less process variability,Changeover is the total process of converting a machine or line from running one product to another,Remove 3 hex bolts,Describe the change(from what to what?).,Higher reliability and quality.,10月-2221:55:4621:55Oct-2225-Oct-22,Changeover Time Defined,Another way,Benefits of Setup Reduction,After SMED,Typical changeover:minutes.Or seconds,Real World Examples,3000-ton sheet metal stamping press,Before:4 hours,After:3 minutes,Improvement:98.7%,or a factor of 80,Now the same press can make multiple parts(hoods and doors in this case)for the Camry,only what is needed for the next hour of production.,400-ton LIM molding press with 16-cavity tool,Before:3 hours,After:18 minutes,Increase in effective capacity equal to 5,184 additional parts,More Examples,Benefits of Setup Reduction,Better quality,Very defined setup processes,Lower cost,Less scrap and inventory,Better flexibility,Rapidly change from product to product,Better worker utilization,Less time spent on setup or waiting for the run to start,Shorter lead time and more capacity,Less process variability,SMED is Continuous Improvement,It is a customer-driven requirement.Customers are demanding:,Product and service diversity,Lower costs,Higher reliability and quality.,So organizations must:,Produce smaller lots,more frequently.,Expand the scope and diversity of products,Reduce quality defects.,Product and service diversity,Document internal and external procedures.,Problem:“only the last turn of a nut or bolt tightens it and only the first one that loosens it”.,Common Problems Solved,2022/10/26 7:37:1307:37:1326 October 2022,9、没有失败,只有暂时停止成功!,Parallel setup tasks,Measure,measure,measure,2022/10/26 7:37:1307:37:1326 October 2022,Changeover and Changeover Time,2022/10/26 7:37:1307:37:1326 October 2022,10月-2210月-2207:37:1307:37:13October 26,2022,Ask why the remaining internal steps cant be external.,Changeover time is the total elapsed time between the last unit of good production of the previous run,at normal line efficiency,to the first unit of good production of the succeeding run,at full line efficiency.,A rapid and efficient way of converting a process from running the current product to running the next product,Fusce id urna blandit,eleifend nulla ac,fringilla purus.,Traditional approach,Setup is given and fixed,Therefore,Use highly skilled setup personnel,Minimize product variety,Combine lots,Make large batches,Another way,Setups CAN be improved!,Small lot production REQUIRES short setups,Setup time reduction of 90%and more is common,6“Traditional”Setup Steps,Preparation,Ensures that all the tools are working properly and are in the right location.,Extraction,The removal of the tooling,raw material,and support equipment after the production lot is completed.,Mounting,The placement of the new tool,support equipment,and raw material before the next production lot.,Establishing Control Settings,Setting all the process control settings prior to the production run.,First Run Capability,This includes the necessary adjustments required after the first trial pieces are produced.,Setup Improvement,The time after processing during which the tooling,machinery is cleaned,identified,and tested for functionality prior to storage.,The SMED Process,Step 1 Observe and record.,Step 2 Separate internal and external activities.,Step 3 Convert internal activities to external activities.,Step 4 Streamline all activities.,Step 5 Document internal and external procedures.,Step 1:Observe and Record,Team-work,Recorder,Record overall duration(from last product to first good product).,Video recorders work very well,Describe the change(from what to what?).,Timers,Time each step,Fact collectors,Breakdown the steps into actions as much detail as possible.,Use a layman to ask uninformed questions challenge the“accepted norm”.,Step 1,Timers.,Aim to have 10-20 steps for each changeover.,Record the elapsed time.Calculate the step time later.,Step 1:Fact collectors.,Have a number of fact collectors to ensure elements are not missed.,One fact per Post-it write clearly,be concise.,Record everything.,E.g.For the“remove guards”step fact collectors may record the following elements:,Walk to control panel,Switch machine off,Wait for flywheel to stop,Get spanner from toolbox,Remove 3 hex bolts,Get Allen key,Remove 5 Allen bolts,Remove guard,Walk to rear of machine,Place guard on the floor,Walk to front of machine,Step 2:Separate internal and external activities,Internal set-up activities.,Elements in the changeover which can only be done when the machine is stopped.,External set-up activities.,Elements that can be performed when the machine is running.,Step 3:Convert internal to external,Study each internal step and ask if it could be external.,Common issues:,Dies in remote storage racks.,Spanners not available.,Raw material checks.,Lifting equipment not available.,Ask why the remaining internal steps cant be external.,Re-examine the true function of each step.,Common issues:,Cold dies using material to heat the dies.,No record of settings.,Step 4:Streamline all activities,Analyze the activity,and discuss all possible ways of improving the step.,Study the external activities as well as the internal activities.,Common issues:,Fastenings Are bolts needed?If so remember that only the last turn tightens a nut or bolt.,Standardize bolt heads.,Standardize die heights.,Equipment and material availability and accessibility.,Step 5:Document the procedures,Write down the new internal and external procedures.,Fill in an action sheet to ensure that the new procedures can be achieved.,Review the whole activity to determine“What went well?”,“What went badly?”and changes that the team would make before the next SMED activity.,Non-Manufacturing Example,Directory inquiries in New York handles 5.5 million calls per day at an average time of 22 seconds per call.,Changed to asking“Directory inquiries,what listing?”instead of“Directory inquiries,what listing please?”,New Yorkers often broke into the“please”with their request anyway,Reduced peak call center requirements from 87 operators to 72 operators.,Non-Manufacturing Example(cont.),A call to NY directory inquiries is no longer a real time experience.,Digitized responses saved 5 seconds in the 1980s.,Now your request is recorded and delivered to the next available operator(while you were speaking he was helping a previous customer).,The recording is processed through a computer program which removed all of the pauses or silences and the“Uhms and Ahs”.,The software then speeds up the recording by 20%,Peak operator requirements dropped by another 23%,Priorities,Eliminate all unnecessary elements of changeover,Externalize all possible elements,Simplify what remains,Measure,measure,measure,Ideas for Improvement,The following slides have several potential areas for improvement.,Combining equipment functionality,Involves standardizing the equipment(parts,tooling,processes)based on commonality between setups to reduce the number of setup steps and cycle times.,Notice how different quantities of the same part can be setup with the same fixture.Also,these setups can occur while the machine is running.,The common setup parts were identified and replaced with this jig/holder combination.,By using these fixtures,the parts are automatically centered and adjusted for height and flatness as a part of External setup-not Internal setup.,Waste associated with finding,replacing,motion,Tooling supplies are clearly labeled,Tooling supplies are neatly assigned a unique location.,One Step Fastening,Bolt attachments requires 32 complete turns for each bolt or screw(1 for each thread)to fasten this bolt and die to a machine.,This clamp attachment requires one step to attach the die to a machine.,This magnetic clamp attachment requires one step to attach the die to a 3000 ton press machine.,Common Problems Solved,Problem:“only the last turn tightens a nut or bolt,and the first one loosens it”.,Solution 1:Key-holes.,Fasten here,Attach and remove plate here,Common Problems Solved,Problem:“only the last turn of a nut or bolt tightens it and only the first one that loosens it”.,Solution 2:Split Thread Method.,Three grooves cut into male and female threads.,Bolt inserted by aligning the grooves and sliding into position.,Bolt tightened by a one-third turn.,Note:the bolt needs to be longer to preserve the area of effective friction.,Common Problems Solved,Problem:Dies are different heights-operators have to change the clamping bolts.,Solution:,Shim the smaller die to equalize the height,If center height of the tool is important,shim top and bottom,Common Problems Solved,Problem:Waiting for tooling to reach elevated temperatures.,Solutions:,Pre-heat ovens,electric or steam heating.,Use the coolant water from the machine to pre-heat the dies.,Use a transfer jig which will allow the electrical and coolant connections to be made off-line and to bring the die to running temperature.,Product design,Pre-staged parts,Cleanability,Flush fasteners speed cleaning,Quick change tools,Power tools speed repetitive tasks,Vacuum or magnetic clamping,Vacuum or magnetic clamping,Parallel setup tasks,Ideally,two people can do the job in half the time as one person,Think about a pit stop at a car race,Improve external setups,Store fixtures,etc.,near machine,Prepare setup kits and carts,Improve material handling,Knowledge Check,What was the primary problem that led to the development of the quick changeover process?,A)Persistent late deliveries by suppliers,B)Moving material goods in and out of storage,C)Workers standing around watching an automated machine,D)Land costs in Japan were very high,Who is primarily responsible for creating quick changeover and SMED?,A)Eiji Toyoda,B)Shigeo Shingo,C)Taiichi Ohno,D)Edward Deming,Click on the definition and drag the correct answer to match the Process Type on the left.,Process Type,Definition,A.,Elements that can be performed when the machine is running.,B.,The time after processing during which the tooling,machinery is cleaned,identified,and tested for functionality prior to storage.,C.,The placement of the new tool,support equipment,and raw material before the next production lot.,D.,Elements in the changeover which can only be done when the machine is stopped.,D,Internal Processes,B,External Processes,Drag the Description to the matching SMED process step.,Step,Description,A.,Streamline all activities.,B.,Observe and record.,C.,Document internal and external procedures.,D.,Convert internal activities to external activities.,E.,Separate internal and external activities.,B,Step 1,E,Step 2,D,Step 3,A,Step 4,C,Step 5,Describe one quick changeover method or tool.,Describe one potential application of quick changeover in your operation.,9,、静夜四无邻,荒居旧业贫。,10月-26,10月-26,Monday,October 5,2026,10,、雨中黄叶树,灯下白头人。,16:20:01,16:20:01,16:20,10/5/2026 4:20:01 PM,11,、以我独沈久,愧君相见频。,10月-26,16:20:01,16:20,Oct-26,05-Oct-26,12,、故人江海别,几度隔山川。,16:20:01,16:20:01,16:20,Monday,October 5,2026,13,、乍见翻疑梦,相悲各问年。,10月-26,10月-26,16:20:01,16:20:01,October 5,2026,14,、他乡生白发,旧国见青山。,05 十月 2026,4:20:01 下午,16:20:01,10月-26,15,、比不了得就不比,得不到的就不要。,。,十月 26,4:20 下午,10月-26,16:20,October 5,2026,16,、行动出成果,工作出财富。,2026/10/5 16:20:01,16:20:01,05 October 2026,17,、做前,能够环视四周;做时,你只能或者最好沿着以脚为起点的射线向前。,4:20:01 下午,4:20 下午,16:20:01,10月-26,9,、没有失败,只有暂时停止成功!。,10月-26,10月-26,Monday,October 5,2026,10,、很多事情努力了未必有结果,但是不努力却什么改变也没有。,16:20:01,16:20:01,16:20,10/5/2026 4:20:01 PM,11,、成功就是日复一日那一点点小小努力的积累。,10月-26,16:20:01,16:20,Oct-26,05-Oct-26,12,、世间成事,不求其绝对圆满,留一份不足,可得无限完美。,16:20:01,16:20:01,16:20,Monday,October 5,2026,13,、不知香积寺,数里入云峰。,10月-26,10月-26,16:20:01,16:20:01,October 5,2026,14,、意志坚强的人能把世界放在手中像泥块一样任意揉捏。,05 十月 2026,4:20:01 下午,16:20:01,10月-26,15,、楚塞三湘接,荆门九派通。,。,十月 26,4:20 下午,10月-26,16:20,October 5,2026,16,、少年十五二十时,步行夺得胡马骑。,2026/10/5 16:20:01,16:20:01,05 October 2026,17,、空山新雨后,天气晚来秋。,4:20:01 下午,4:20 下午,16:20:01,10月-26,9,、杨柳散和风,青山澹吾虑。,10月-26,10月-26,Monday,October 5,2026,10,、阅读一切好书如同和过去最杰出的人谈话。,16:20:01,16:20:01,16:20,10/5/2026 4:20:01 PM,11,、越是没有本领的就越加自命不凡。,10月-26,16:20:01,16:20,Oct-26,05-Oct-26,12,、越是无能的人,越喜欢挑剔别人的错儿。,16:20:01,16:20:01,16:20,Monday,October 5,2026,13,、知人者智,自知者明。胜人者有力,自胜者强。,10月-26,10月-26,16:20:01,16:20:01,October 5,2026,14,、意志坚强的人能把世界放在手中像泥块一样任意揉捏。,05 十月 2026,4:20:01 下午,16:20:01,10月-26,15,、最具挑战性的挑战莫过于提升自我。,十月 26,4:20 下午,10月-26,16:20,October 5,2026,16,、业余生活要有意义,不要越轨。,2026/10/5 16:20:01,16:20:01,05 October 2026,17,、一个人即使已登上顶峰,也仍要自强不息。,4:20:01 下午,4:20 下午,16:20:01,10月-26,MOMODA POWERPOINT,Lorem ipsum dolor sit amet,consectetur adipiscing elit.Fusce id urna blandit,eleifend nulla ac,fringilla purus.Nulla iaculis tempor felis ut cursus.,感谢您的下载观看,专家告诉,
展开阅读全文

开通  VIP、SVIP  下载更划算
下载10份以上建议开通 VIP 会员
下载20份以上建议开通SVIP会员


开通VIP      成为共赢上传

当前位置:首页 > 包罗万象 > 大杂烩

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        关注我们

©2010-2026 宁波自信网络信息技术有限公司  版权所有

客服电话:0574-28810668  投诉电话:18658249818

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :微信公众号    抖音    微博    LOFTER 

客服