收藏 分销(赏)

建筑工程施工总承包合同范本八篇.docx

上传人:一*** 文档编号:1209752 上传时间:2024-04-18 格式:DOCX 页数:12 大小:40.33KB
下载 相关 举报
建筑工程施工总承包合同范本八篇.docx_第1页
第1页 / 共12页
亲,该文档总共12页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、建筑工程施工总承包合同范本八篇-# 合同一:建筑工程施工总承包合同# 摘要本合同由甲方委托乙方进行建筑工程施工总承包,双方应遵守下列条款约定,以确保工程顺利进行。# 第一条 项目名称及位置甲方将委托乙方承担项目名称为XX建筑工程施工总承包工作,地点位于XX地区。# 第二条 合同价款及付款方式乙方应按约定标准完成工程,并在工程验收合格后甲方按照约定的付款方式支付工程价款。# 第三条 工程质量保证乙方承诺在施工过程中符合相关国家标准,并保证质量符合约定要求。# 第四条 施工期限甲、乙双方应按照约定的工期完成工程,如遇不可抗力因素导致工期延长,应及时沟通并协商解决。# 第五条 竣工验收工程竣工后,乙

2、方应进行工程验收,如发现质量问题应及时整改,直至达到约定标准。# 第六条 违约责任若一方未履行合同义务,应承担相应的违约责任,赔偿对方经济损失。# 结语本合同自双方签字盖章后生效,期间如需修改,须经双方协商一致后签署补充协议。-# Contract One: General Contract for Construction Engineering# AbstractThis contract is commissioned by Party A to undertake the general contract for construction engineering by Party B.

3、 Both parties should abide by the following terms and conditions to ensure the smooth progress of the project.# Article 1: Project Name and LocationParty A will commission Party B to undertake the construction of the XX construction project at the location in XX area.# Article 2: Contract Price and

4、Payment MethodParty B shall complete the project according to the agreed standards, and Party A shall pay the project price according to the agreed payment method after the project is accepted.# Article 3: Quality GuaranteeParty B promises to comply with the relevant national standards during the co

5、nstruction process and guarantees that the quality meets the agreed requirements.# Article 4: Construction PeriodBoth Party A and Party B shall complete the project within the agreed timeframe. In case of force majeure factors leading to an extension of the construction period, they shall communicat

6、e in a timely manner and negotiate a solution.# Article 5: Completion AcceptanceAfter the completion of the project, Party B shall conduct project acceptance. If any quality issues are found, they shall promptly rectify them until they meet the agreed standards.# Article 6: Breach of Contract Liabil

7、ityIf either party fails to fulfill its contractual obligations, they shall bear the corresponding liability for breach of contract and compensate for the economic losses of the other party.# ConclusionThis contract shall come into effect upon the signature and seal of both parties. Any modification

8、s during the contract period shall require a supplementary agreement signed after mutual consultation and agreement.- # 合同二:建筑工程分部分项工程承包合同# 摘要本合同由甲方委托乙方承担建筑工程的分部分项工程承包,并约定了双方在工程中的权利义务及工作内容。# 第一条 项目名称及内容甲方委托乙方承担XX建筑工程的分部分项工程承包,具体内容包括XX工程。# 第二条 承包价格及支付方式乙方应按照承包内容完成工程,并在工程验收合格后,甲方按约定的方式支付承包款项。# 第三条 材料质

9、量及验收乙方应采用符合国家标准的材料,并按照验收标准进行验收,确保工程质量。# 第四条 安全生产在工程过程中,乙方应严格遵守安全生产规定,确保施工安全。# 第五条 竣工验收工程完成后,乙方应邀请甲方进行工程验收,如有问题应及时整改,直至达到验收标准。# 第六条 违约责任若一方违反合同约定,应承担相应的法律责任,不影响对方的合法权益。# 结语本合同经双方签字盖章后生效,定于XX年XX月XX日起至工程竣工验收完毕止。-# Contract Two: Subcontracting Contract for Construction Engineering# AbstractThis contract

10、 is commissioned by Party A to undertake the subcontracting of building projects by Party B, defining the rights and obligations of both parties and the scope of work in the project.# Article 1: Project Name and ScopeParty A commissions Party B to undertake the subcontracting of the XX building proj

11、ect, including specific works like XX.# Article 2: Contract Price and Payment MethodParty B shall complete the project according to the subcontracting scope and receive payment from Party A after the project is accepted and qualified.# Article 3: Material Quality and AcceptanceParty B shall use mate

12、rials that meet national standards and conduct acceptance according to the specified criteria to ensure project quality.# Article 4: Safety ProductionDuring the project, Party B shall strictly adhere to safety production regulations to ensure construction safety.# Article 5: Completion AcceptanceUpo

13、n project completion, Party B shall invite Party A for project acceptance. If any issues are found, they shall rectify them promptly until meeting acceptance standards.# Article 6: Breach of Contract LiabilityIf either party violates the contract terms, they shall bear the corresponding legal liabil

14、ity without affecting the legitimate rights and interests of the other party.# ConclusionThis contract shall come into effect upon the signature and seal of both parties and shall remain valid from XX date to the completion acceptance of the project.- # 合同三:建筑工程设备安装工程承包合同# 摘要该合同约定了甲乙双方在建筑工程设备安装工程承包中

15、的权利和义务,旨在确保工程安全、质量。# 第一条 项目名称及范围甲方将XX设备安装工程委托予乙方承担,具体工程范围包括XX。# 第二条 价款及支付方式乙方应按工程要求完成设备安装工程,并在验收合格后,甲方按约定方式支付应付的价款。# 第三条 安装要求乙方应符合相关安装标准及规范,保证设备安装牢固可靠,符合要求。# 第四条 安全管理工程安装过程中,乙方应负责实施相关安全管理措斀,确保施工现场安全。# 第五条 质量保证乙方承诺设备安装工程质量符合约定标准,负责任保修service。# 第六条 竣工验收工程完成后,乙方应邀请甲方进行验收,如有问题,应及时处理,直至达到验收标准。# 结语双方签字盖章后

16、本合同生效,自XX日期起至验收合格完毕。-# Contract Three: Contract for Installation of Construction Engineering Equipment# AbstractThis contract defines the rights and obligations of both parties in the subcontracting of construction engineering equipment installation, aiming to ensure project safety and quality.# Art

17、icle 1: Project Name and ScopeParty A entrusts Party B with the installation of XX equipment in the construction project, including specific scope like XX.# Article 2: Price and Payment MethodParty B shall complete the equipment installation according to project requirements and receive payment from

18、 Party A after acceptance and qualification.# Article 3: Installation RequirementsParty B shall comply with relevant installation standards and specifications to ensure that the equipment installation is sturdy, reliable, and meets the requirements.# Article 4: Safety ManagementDuring the installati

19、on process, Party B shall be responsible for implementing safety management measures to ensure construction site safety.# Article 5: Quality AssuranceParty B promises that the quality of equipment installation meets the agreed standards and is responsible for warranty service.# Article 6: Completion

20、 AcceptanceUpon project completion, Party B shall invite Party A for acceptance. If any issues arise, they shall handle them promptly until meeting acceptance standards.# ConclusionThis contract shall come into effect upon the signature and seal of both parties, remaining valid from XX date until co

21、mpletion acceptance.-# 合同四:建筑工程设计合同# 摘要甲方委托乙方进行建筑工程设计的合同约定了双方在设计阶段的权益与责任,确保设计质量。# 第一条 项目名称及内容甲方委托乙方进行XX建筑工程设计,具体设计范围包括XX。# 第二条 设计费及支付方式乙方应按照实际设计工作量收取设计费,甲方在验收合格后按约定方式支付设计费用。# 第三条 设计标准乙方应符合国家相关设计标准,确保设计符合规范要求,保证设计质量。# 第四条 设计修改如设计方案需变更,乙方应及时与甲方沟通,经双方确认后进行相应修改。# 第五条 知识产权保护设计过程中产生的相关知识产权归乙方所有,甲方不得擅自使用、传

22、播。# 第六条 完工验收设计完成后,乙方应提交设计成果供甲方验收,保证设计符合甲方要求。# 结语双方签字盖章后本合同自XX日起生效,至设计验收合格结束。-# Contract Four: Design Contract for Construction Engineering# AbstractThis contract, commissioned by Party A to Party B for the design of construction engineering, defines the rights and responsibilities of both parties du

23、ring the design phase to ensure design quality.# Article 1: Project Name and ScopeParty A commissions Party B for the design of XX construction engineering, including specific design scope like XX.# Article 2: Design Fee and Payment MethodParty B shall charge design fees according to the actual desi

24、gn workload, and Party A shall pay the design fees after acceptance according to the agreed method.# Article 3: Design StandardsParty B shall comply with relevant national design standards to ensure that the design meets regulatory requirements and guarantees design quality.# Article 4: Design Modif

25、icationsIf design changes are necessary, Party B shall promptly communicate with Party A and make corresponding modifications after mutual confirmation.# Article 5: Intellectual Property ProtectionAny intellectual property rights generated during the design process belong to Party B, and Party A sha

26、ll not use or disseminate them without authorization.# Article 6: Completion AcceptanceUpon design completion, Party B shall submit the design results for Party As acceptance, ensuring the design meets Party As requirements.# ConclusionThis contract shall come into effect upon the signature and seal

27、 of both parties, remaining valid from XX date until the completion acceptance of the design.-# 合同五:建筑工程监理合同# 摘要监理合同约定了甲方委托乙方进行建筑工程监理工作的各项事宜,确保工程顺利进行。# 第一条 项目名称及内容甲方委托乙方进行XX建筑工程监理工作,具体内容包括对施工工艺、工程质量等进行监督。# 第二条 监理费用及支付方式乙方应按照约定标准收取监理费用,甲方在工程验收合格后支付监理费用。# 第三条 工程监督乙方应对施工现场进行定期监督,发现问题及时提出整改要求,保证工程质量。# 第

28、四条 技术服务乙方可提供工程设计咨询服务,协助甲方解决工程设计过程中遇到的问题。# 第五条 违约责任若一方未按要求履行监理义务,应承担相应的违约责任,包括赔偿甲方直接经济损失。# 第六条 完工验收工程竣工后,乙方应协助甲方进行工程验收,确保工程完工符合要求。# 结语双方签字盖章后本合同自XX日期起生效,至工程验收合格结束。-# Contract Five: Supervision Contract for Construction Engineering# AbstractThe supervision contract defines the matters related to Party

29、 A entrusting Party B with construction engineering supervision work to ensure the smooth progress of the project.# Article 1: Project Name and ScopeParty A commissions Party B for the supervision of XX construction engineering, including supervision of construction processes and project quality.# A

30、rticle 2: Supervision Fee and Payment MethodParty B shall charge supervision fees according to the agreed standard, and Party A shall pay the supervision fees after project acceptance.# Article 3: Engineering SupervisionParty B shall conduct regular supervision at the construction site, identifying

31、issues and making timely rectification requests to ensure project quality.# Article 4: Technical ServicesParty B may provide engineering design consultation services to assist Party A in addressing any issues encountered during the design process.# Article 5: Breach of Contract LiabilityIf either pa

32、rty fails to fulfill the supervision obligations as required, they shall bear the corresponding liability for breach of contract, including compensating Party A for direct economic losses.# Article 6: Completion AcceptanceAfter the project completion, Party B shall assist Party A in project acceptan

33、ce to ensure that the project meets the required standards upon completion.# ConclusionThis contract shall come into effect upon the signature and seal of both parties, remaining valid from XX date until completion acceptance of the project.-# 合同六:建筑工程施工合同# 摘要本合同约定了甲方委托乙方进行建筑工程施工的各项工作,包括工程验收、支付方式等内容。# 第一条 项目概

展开阅读全文
部分上传会员的收益排行 01、路***(¥15400+),02、曲****(¥15300+),
03、wei****016(¥13200+),04、大***流(¥12600+),
05、Fis****915(¥4200+),06、h****i(¥4100+),
07、Q**(¥3400+),08、自******点(¥2400+),
09、h*****x(¥1400+),10、c****e(¥1100+),
11、be*****ha(¥800+),12、13********8(¥800+)。
相似文档                                   自信AI助手自信AI助手
搜索标签

当前位置:首页 > 应用文书 > 合同范本

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服