1、 佛坪县引汉济渭工程 移民安置石墩河集镇迁建工程施工Ⅰ标段 第一卷:施工管理工作报告 共一册 第一册 编制单位:陕西远景工程有限公司 审查单位:咸阳广誉建设监理有限公司 二0一五年十二月 佛坪县引汉济渭工程 移民安置石墩河集镇迁建工程施工Ⅰ标段 第二卷:施工管理文件 共五册 第五册 编制单位:陕西远景工程有限公司 审查单位:咸阳广誉建设监理有限公司 二0一五年十二月 本册目录 1、 进场通知·······································
2、··········01 2、 合同项目开工令··········································02 3、 合同项目开工申请·········································03 4、 合同协议书···············································05 5、 项目部成立及人员任命报告·································08 6、 现场组织机构及人员报审···································20 7、 施工组织设计申
3、报及批复···································35 8、 2013年安全生产目标责任书································100 9、 施工进场设备报验单·······································104 10、 材料/构配件进场报验单····································105 11、 防洪防汛预案·············································109 12、 安全生产责任制····················
4、·······················115 13、 施工技术交底单···········································117 14、 安全技术交底记录·········································125 本册目录 1、 施工作业指导书申报········································01 2、 石墩河镇森林防火目标责任书································21 3、 汉中市水利水电工程质量安全监督站项目划分的批复·········
5、···23 4、 佛坪县移民工作办公室2014年安全生产目标责任书·············29 5、 佛坪县防汛安全检查责任卡··································31 6、 安全生产检查记录表········································32 7、 工程现场书面指示··········································33 8、 整改通知01号、02号·······································34 9、 汉中市水利水电工程质量安全监督站检查处理通知·
6、·············36 10、 工程质量整改完成报告······································37 11、 整改通知03号·············································39 12、 工程停工整改方案··········································40 13、 监理通知··················································42 14、 返工处理报告·····································
7、·········43 15、 监理通知··················································44 16、 会议纪要··················································45 17、 佛坪县库区移民办关于印发开展安全生产大检查整治活动实施方案的通知 (佛移发【2013】24号)·······························50 18、 整改送达通知书············································54 19、 佛坪县移民工作办公室关于
8、立即对石墩河集镇迁建点大桥进行全面检查及桥墩维修加固的通知(佛移办发【2014】30号)··············56 20、 关于桥墩维修加固回复单····································58 21、 佛坪县移民安置工程项目建设办公室关于石墩河集镇迁建点交通桥桥墩维修加固方案的批复(佛移项办发【2014】16号)···············62 22、 佛坪县河道管理站关于开展河道专项整治工作的通知(佛河管发【2014】1号)······················································63 23、 陕
9、西省库区移民工作领导小组办公室关于移民安置规划设计表更管理暂行办法的通知【2014】7号····································66 24、 佛坪县移民安置工程项目建设办公室关于要求认真执行陕移发【2014】7号文件的通知················································71 25、 佛坪县人民政府办公室关于进一步做好安全生产工作的紧急通知(佛政办发【2014】108号)···········································74 26、 佛坪县移民工作办公室关于转发《佛坪县安全生
10、产委员会办公室关于印发<2015年全县开展建设工程落实施工方案专项行动实施方案>的通知》通知(佛移办发【2015】2号)···································77 27、 佛坪县移民工作办公室关于印发2015年安全生产月活动方案的通知(佛移办发【2015】3号)·········································83 28、 佛坪县移民工作办公室关于认真开展安全生产大检查的通知(佛移办发【2015】12号)··············································86 29、 佛坪县移民工作办
11、公室关于深入开展安全生产大检查“回头看”工作的通知(佛移办发【2015】22号)··································101 30、 佛坪县移民工作办公室关于认真做好地质灾害防治方案和应急预案的通知(佛移办发【2016】6号)···································111 31、 县级移民实施机构设计变更申请·······························120 32、 设计变更报告···············································121 33、 申请变更报告单····
12、·········································123 34、 关于施工中遇到困难和问题的报告·····························128 35、 工程设计变更通知单·········································134 36、 工程设计更改通知单·········································135 本册目录 1、 蒲河左岸堤防(D1-F1)分部工程开工通知························000 2、 蒲河左岸堤防(
13、D1-F1)分部工程开工申请······················001 3、 蒲河左岸堤防(D1-F1)施工技术方案申报及批复·················002 4、 铁犁排洪沟(D1-F2)分部工程开工通知························023 5、 铁犁排洪沟(D1-F2)分部工程开工申请························024 6、 铁犁排洪沟(D1-F2)施工技术方案申报及批复··················025 7、 无名排洪沟(D1-F3)分部工程开工通知························058 8、 无名
14、排洪沟(D1-F3)分部工程开工申请························059 9、 无名排洪沟(D1-F3)施工技术方案申报及批复··················060 10、 石墩河乡新址交通桥下部结构(D1-F4)分部工程开工通知········093 11、 石墩河乡新址交通桥下部结构(D1-F4)分部工程开工申请········094 12、 石墩河乡新址交通桥下部结构(D1-F4)施工技术方案申报及批复···095 13、 石墩河乡新址交通桥上部结构(D1-F5)分部工程开工通知········133 14、 石墩河乡新址交通桥上部结构(D1-F5)分部
15、工程开工申请·········134 15、 石墩河乡新址交通桥上部结构(D1-F5)施工技术方案申报及批复···135 本册目录 1、 施工月报(2013年4月)·····································001 2、 施工月报(2013年5月)·····································006 3、 施工月报(2013年6月)·····································017 4、 施工月报(2013年7月)·····································
16、026 5、 施工月报(2013年8月)······································035 6、 施工月报(2013年9月)······································044 7、 施工月报(2013年10月)·····································053 8、 施工月报(2013年11月)·····································063 9、 施工月报(2013年12月)·····································072
17、10、 施工月报(2014年1月)······································081 11、 施工月报(2014年2月)······································091 12、 施工月报(2014年3月)······································100 13、 施工月报(2014年4月)······································109 14、 施工月报(2014年5月)······································122
18、 本册目录 1、施工日志(2013.5.2-2013.6.28)·································001 2、施工日志(2013.7.1-2013.9.9)·································033 3、施工日志(2013.9.10-2013.11.12)·································064 4、施工日志(2013.11.13-2014.1.1)·································099 5、施工日志(2014.1.2-2014.4.3)·····
19、····························120 6、施工日志(2014.4.4-2014.6.6)·································163 7、施工日志(2014.6.29-2014.7.31)·································204 本册目录 1、承包【2013】材验001号水泥、砂子进场报验单·····················001 2、SN130092水泥物理性能检测报告·································002 3、H
20、L2013-393普通水泥试验报告····································003 4、HL2013-415普通水泥试验报告···································004 5、HL2013-416普通水泥试验报告···································005 6、FSDHJQI-SN01水泥检验报告单···································007 7、FSDHJQI-SN02水泥检验报告单···································006
21、8、FSDHJQI-SN03水泥检验报告单···································008 9、SS130151砂料检测报告·········································009 10、HL2013-374砂检测报告········································010 11、HL2013-394砂检测报告········································011 12、HL2013-376碎石检测报告································
22、······012 13、YS130039岩石检测报告········································013 14、HRB400级直径Φ8钢材出厂质量证明书··························014 15、HRB400级直径Φ10钢材出厂质量证明书·························015 16、HRB400E级直径Φ12钢材出厂质量证明书························016 17、HRB400E级直径Φ14钢材出厂质量证明书························017 18、HRB400E级
23、直径Φ16钢材出厂质量证明书························018 19、HPB300级Φ8、HRB400E级Φ14、Φ16、Φ20钢材物理性能试验报告·019 20、HPB300级Φ10钢材物理性能试验报告····························020 21、HPB300级Φ12、Φ14、Φ16钢筋拉伸、弯曲试验报告·············021 22、HPB300级Φ6.5;HRB400级Φ10、Φ10;HRB400EΦ12钢材物理性能试验报告·····················································
24、·······022 23、HRB400E级Φ25钢材物理性能试验报告··························023 24、HRB400E级Φ22钢材物理性能试验报告··························024 25、Φ14、Φ16、Φ20钢材焊接性能检验报告·························025 26、Q235B级400*102*12.5热轧槽钢产品质量证明书··················026 27、预应力钢绞线1×7-15.20-1860-GB/T5224-2003合格证············027 28、预应力钢绞线1×7
25、15.20-1860-GB/T5224-2003产品质量证明书·····028 29、钢绞线1×7-15.20-1860-GB/T5224-2003力学性能试验检测报告·····029 30、M15-4、M15-5锚具三件套产品质量保证书·························031 31、M15-4、M15-5锚具、夹具洛氏硬度试验检测报告···················032 32、金属波纹管D56、D67产品质量保证书····························034 33、GYZF4250×51和GYZ250×49公路桥梁板式橡胶支座;D80型桥
26、梁伸缩装置材料进场报验单···················································035 34、GYZF4250×51和GYZ250×49公路桥梁板式橡胶支座合格证·········036 35、GYZF4250×51和GYZ250×49公路桥梁板式橡胶支座出厂检验报告···037 36、GYZ250×49公路桥梁板式橡胶支座性能检测报告··················040 37、D80型桥梁伸缩装置出厂合格证、检验报告·······················043 38、勉县尧柏P•O 42.5R—M7.5水泥砂浆配合比试验报
27、告··············049 39、汉中尧柏P•C 32.5R—M7.5水泥砂浆配合比试验报告··············050 40、汉中尧柏P•O 42.5勾缝M10水泥砂浆配合比试验报告·············· 41、汉中尧柏P•O 42.5防浪墙、护肩墙C15混凝土配合比设计试验报告·· 42、汉中尧柏P•O 42.5桩基C25混凝土配合比设计试验报告···········047 43、汉中尧柏P•O 42.5预制盖板、系梁、搭板C25混凝土配合比设计试验报告· ··················································
28、···············046 44、汉中尧柏P•O 42.5盖梁C30混凝土配合比设计试验报告············ 45、汉中尧柏P•O 42.5预制梁板C40混凝土配合比设计试验报告········048 46、砂砾石相对密度试验报告2013-7-24 ····························052 47、蒲河左岸防洪堤K0-012~K0+591.54段回填碾压检测报告·············053 49、蒲河左岸防洪堤M7.5浆砌石砂浆抗压强度试验报告···············091 50、0#桥头浆砌石路基护肩墙M7.5砂浆抗压强度检验报告·
29、············094 51、蒲河左岸防洪堤M10护坡勾缝砂浆抗压强度试验报告··············095 52、铁犁、无名排洪沟M7.5浆砌石、M10勾缝砂浆抗压强度试验报告····100 53、蒲河左岸防洪堤C15砼防浪墙混凝土立方体抗压强度试验报告······107 54、衡重式C15片石砼路肩墙混凝土抗压强度检验报告················112 55、无名、铁犁排洪沟C25砼预制盖板混凝土抗压强度试验报告········115 56、0#桥台现浇砼搭板C25混凝土抗压强度试验报告··················119 57、0#~5#桩基础C2
30、5混凝土抗压强度试验报告······················120 58、1#~4#地系梁C25混凝土抗压强度试验报告······················126 59、1#~4#灌注桩内外柱C30混凝土抗压强度试验报告················127 60、0#~5#地系梁C25混凝土抗压强度试验报告······················128 61、右岸0#桥头衔接段路面C30混凝土抗压强度试验报告··············134 62、1#~10#空心边板、1#~25#空心中板C40混凝土抗压强度试验报告···136 63、0#~5#铰缝、0#~5
31、桥面防水砼铺装C40混凝土抗压强度试验报告···147 佛坪县引汉济渭工程 移民安置石墩河集镇迁建工程施工Ⅰ标段 第三卷:施工技术文件 共七册 第七册 编制单位:陕西远景工程有限公司 审查单位:咸阳广誉建设监理有限公司 二0一五年十二月 本册目录 1、 联合测量通知单··········································001 2、 施工放样报验单··········································002 3、 施工测量成果报验单············
32、··························004 4、 K0+000-K0.591.54段施工放样报验单························009 5、 铁犁排洪沟表层清理施工测量成果报验单·····················014 6、 铁犁排洪沟基础开挖施工测量成果报验单······················017 7、 铁犁排洪沟基础开挖施工放样报验单·························019 8、 无名排洪沟表层清理施工测量成果报验单·····················023 9、 无名排洪沟基础开挖施工测量成果报验单·
33、····················026 10、 无名排洪沟基础开挖施工放样报验单·························028 11、 0号桥台内柱桩基础中心定位施工放样报验单··················034 12、 0号桥台内柱桩基础施工测量成果报验单······················036 13、 0号桥台外柱桩基础中心定位施工放样报验单··················038 14、 0号桥台外柱桩基础施工测量成果报验单······················040 15、 0号桥台内外桩柱二次浇注中心点位置施工放样报验单·····
34、·····042 16、 0号桥台盖梁、耳背墙底面外形尺寸、梁底面高程施工放样报验单·044 17、 1号桥墩外柱桩基础中心定位施工放样报验单··················046 18、 1号桥墩外柱桩基础施工测量成果报验单·····················048 19、 1号桥墩内柱桩基础中心定位施工放样报验单·················050 20、 1号桥墩内柱桩基础施工测量成果报验单·····················052 21、 1号桥墩内外桩柱二次浇注中心点位置地系梁浇注高程施工放样报验单···························
35、····························054 22、 1号桥墩盖梁中心线、底面高程施工放样报验单················056 23、 1号桥墩支座垫石中心线引测、顶面高程测量施工放样报验单·····058 24、 2号桥墩内柱桩基础中心定位施工放样报验单···················060 25、 2号桥墩内柱桩基础施工测量成果报验单·······················062 26、 2号桥墩外柱桩基础中心定位施工放样报验单····················064 27、 2号桥墩外柱桩基础施工测量成果报验单···········
36、·············066 28、 2号桥墩内、外桩柱中心位置和地系梁高程测量施工放样报验单····068 29、 2号桥墩盖梁中心线、底面高程施工放样报验单··················070 30、 3号桥墩外柱桩基础中心定位施工放样报验单····················072 31、 3号桥墩外柱桩基础施工测量成果报验单·························074 32、 3号桥墩内柱桩基础中心定位施工放样报验单·····················076 33、 3号桥墩内柱桩基础施工测量成果报验单····················
37、····078 34、 3号桥墩内、外桩柱中心点位置和地系梁高程施工放样报验单·······080 35、 3号桥墩盖梁中心线、底面高程施工放样报验单··················082 36、 4号桥墩内柱桩基础中心定位施工放样报验单····················084 37、 4号桥墩内柱桩基础施工测量成果报验单·························086 38、 4号桥墩内、外桩柱中心点位置和地系梁高程施工放样报验单·······088 39、 4号桥墩盖梁中心线、底面高程施工放样报验单··················090 40、 4号桥墩
38、外柱桩基础施工测量承诺报验单························092 41、 4号桥墩外柱桩基础中心定位施工放样报验单····················094 42、 5号桥台外柱桩基础施工测量成果报验单························096 43、 5号桥台外柱桩基础中心定位施工放样报验单···················098 44、 5号桥台内柱桩基础中心定位施工放样报验单···················100 45、 5号桥台内柱桩基础施工测量成果报验单·······················102 46、 5号桥台内、外
39、桩柱中心点位置和高程控制施工放样报验单········104 47、 5号桥台盖梁中心线、耳墙尺寸、梁底面高程测量施工放样报验单···106 48、 0号桥台支座垫石中心引线、顶面高程测量施工放样报验单·········108 49、 2号桥墩支座垫石中心线引测、顶面高程测量施工放样报验单·······110 50、 4号桥墩支座垫石中心线引测、顶面高程测量施工放样报验单······112 51、 5号桥台支座垫石中心线引测、顶面高程测量施工放样报验单······114 52、 0号桥台支座垫石钢筋砼浇筑施工测量成果报验单·················116 53、 5号桥台
40、支座垫石钢筋砼浇筑施工测量成果报验单················118 54、 1号桥墩支座垫石钢筋砼浇筑施工测量成果报验单················120 55、 2号桥墩支座垫石钢筋砼浇筑施工测量成果报验单·················122 56、 3号桥墩支座垫石中心线引测、顶面高程测量施工放样报验单·······124 57、 3号桥墩支座垫石钢筋砼浇筑施工测量成果报验单················126 58、 4号桥墩支座垫石钢筋砼浇筑施工测量成果报验单·················128 本册目录 1、 K0+300-K0+4
41、00基础开挖施工质量报验单·······················001 2、 K0+300-K0+400浆砌石挡墙基础施工质量报验单·················004 3、 K0+300-K0+400基面清理、回填砂卵石施工质量报验单···········006 4、 K0+300-K0+400夯填砂卵石施工质量报验单·····················009 5、 K0+300-K0+400浆砌石护坡施工质量报验单·····················014 6、 K0+300-K0+400C15防浪墙施工质量报验单·····················
42、·018 7、 K0+300-K0+400彩色广场砖及路沿铺筑施工质量报验单···········022 8、 K0+500-K0+591.54基础开挖施工质量报验单····················025 9、 K0+500-K0+591.54浆砌石挡墙基础施工质量报验单··············028 10、 K0+500-K0+591.54基面清理、回填砂卵石施工质量报验单·········030 11、 K0+500-K0+591.54夯填砂卵石施工质量报验单···················033 12、 K0+500-K0+591.54浆砌石护坡施工质量报验
43、单···················038 13、 K0+500-K0+591.54C15防浪墙施工质量报验单···················042 14、 K0+500-K0+591.54彩色广场砖及路沿铺筑施工质量报验单········046 15、 K0+110-K0+120 1#下河踏步施工质量报验单····················049 16、 K0+110-K0+120 2#下河踏步施工质量报验单····················053 17、 K0+100-K0+200基础开挖施工质量报验单·······················057
44、18、 K0+100-K0+200浆砌石挡墙基础施工质量报验单·················060 19、 K0+100-K0+200基面清理、回填砂卵石施工质量报验单···········062 20、 K0+100-K0+200夯填砂卵石施工质量报验单·····················065 21、 K0+100-K0+200浆砌石护坡施工质量报验单·····················070 22、 K0+100-K0+200C15防浪墙施工质量报验单······················074 23、 K0+100-K0+200彩色广场砖及路沿铺筑施工质
45、量报验单···········078 24、 K0+400-K0+500基础开挖施工质量报验单·······················081 25、 K0+400-K0+500浆砌石挡墙基础施工质量报验单·················084 26、 K0+400-K0+500基面清理、回填砂卵石施工质量报验单···········086 27、 K0+400-K0+500夯填砂卵石施工质量报验单·····················089 28、 K0+400-K0+500浆砌石护坡施工质量报验单······················094 29、 K0+400
46、K0+500C15防浪墙施工质量报验单······················098 30、 K0+400-K0+500彩色广场砖及路沿铺筑施工质量报验单···········102 31、 K0+200-k0+300基础开挖施工质量报验单·······················105 32、 K0+200-k0+300浆砌石挡墙基础施工质量报验单·················108 33、 K0+200-k0+300基面清理、回填砂卵石施工质量报验单·············110 34、 K0+200-k0+300夯填砂卵石施工质量报验单·············
47、·········113 35、 K0+200-k0+300浆砌石护坡施工质量报验单······················118 36、 K0+200-k0+300C15防浪墙施工质量报验单······················122 37、 K0+200-k0+300彩色广场砖及路沿铺筑施工质量报验单············126 38、 K0+000-K0+100基础开挖施工质量报验单························129 39、 K0+000-K0+100浆砌石挡墙基础施工质量报验单··················132 40、 K0+000-
48、K0+100基面清理、回填砂卵石施工质量报验单············134 41、 K0+000-K0+100夯填砂卵石施工质量报验单······················137 42、 K0+000-K0+100浆砌石护坡施工质量报验单······················143 43、 K0+000-K0+100C15防浪墙施工质量报验单·······················147 44、 K0+000-K0+100彩色广场砖及路沿铺筑施工质量报验单············151 本册目录 1、 铁犁排洪沟K0+000-K0+100表层清理施工质量报验
49、单·············001 2、 铁犁排洪沟K0+000-K0+100基础开挖施工质量报验单·············003 3、 铁犁排洪沟K0+000-K0+100砂卵石垫层施工质量报验单············006 4、 铁犁排洪沟K0+000-K0+100 M7.5浆砌石挡墙施工质量报验单·······008 5、 铁犁排洪沟K0+000-K0+100 M7.5浆砌石底板施工质量报验单·······010 6、 铁犁排洪沟K0+000-K0+100土方回填施工质量报验单··············012 7、 铁犁排洪沟K0+010-K0+100 C25钢筋砼盖
50、板预制施工质量报验单····015 8、 铁犁排洪沟K0+010-K0+100 C25钢筋砼盖板安装施工质量报验单····019 9、 铁犁排洪沟K0+100-K0+200表层清理施工质量报验单·············021 10、 铁犁排洪沟K0+100-K0+200基础开挖施工质量报验单·············023 11、 铁犁排洪沟K0+100-K0+200砂卵石垫层施工质量报验单···········026 12、 铁犁排洪沟K0+100-K0+200 M7.5浆砌石挡墙施工质量报验单·······028 13、 铁犁排洪沟K0+100-K0+200 M7.5浆砌石底