1、 某公司分户验收实施方案 宁夏正源建设监理有限公司分户验收方案 —续建工程住宅工程分户验收实施方案工程名称:—续建工程5X地装修类型:初装修方案编制:方案审批:编制单位:有限公司编制日期:2014年5月1日 1 宁夏正源建设监理有限公司分户验收方案目录 一、工程概况·······················································································(2) 二、分户验收组织机构······························
2、················································(3) 三、分户验收人员岗位责任制······································································(4) (一)项目分户验收领导小组有关人员岗位责任制···············································(4) (二)项目分户验收专业检查组有关人员岗位责任制············································(4)
3、 四、分户验收专业检查组任务分工表······························································(5) (一)土建专业检查组项目分户验收工作任务分工表············································(5) (二)给水排水及采暖专业检查组项目分户验收工作任务分工表·······························(5) (三)电气专业检查组项目分户验收工作任务表······································
4、············(6) 五、住宅工程质量分户验收操作基本程序························································(6)·六、分户验收的条件与标识········································································(7)·七、分户验收的划分················································································(8)·八、分户验收的一般规定········
5、···································································(8) 九、分户验收项目检验频率、方法及验收标准····················································(8)·十、分户验收测量工具准备计划··································································(10) 十一、分户验收质量保证措施···········································
6、··························(11) 十二、分户验收质量监督措施·····································································(11) 十三、各楼号分户验收计划·······································································(11) 十四、分户验收标识与图章································································
7、·······(12)附图1:室内电气标识············································································(12)附图2:地面净空检测点及墙边素浆色带标识··················································(15)附图3:地面隐蔽管道标识示意图·······························································(15)附图4:检测橡皮图章样图、检测位置章样图·······················
8、····························(16)附图5:各单位分户验收专用章样图·····························································(16) 十五、分户验收资料···············································································(16)附表1住宅工程质量分户验收表·······························································(18)附表2住宅工程
9、质量分户验收记录····························································(19)附表3竣工室内净高、开间尺寸分户验收抽测表·············································(20)·附表4住宅工程质量分户验收汇总表·························································(21) 2 宁夏正源建设监理有限公司分户验收方案 —续建工程5X地 住宅楼工程分户质量验收实施方案 3
10、 宁夏正源建设监理有限公司分户验收方案为贯彻执行《宁夏回族自治区住宅工程质量分户验收管理规定》(宁建(建)[2006]37号),确保—续建工程5X地住宅工程质量,根据宁夏建设工程质量监督总站《关于实施住宅工程分户验收工作的意见》,特编制—续建工程5 地分户质量验收实施方案。 一、工程概况 1、项目名称: 2、建设单位:宁夏房地产开发有限公司 3、设计单位:北京中联环建文建筑设计有限公司4、施工单位: —续建工程5X地 住宅区工程分户验收领导小组 二〇一四年五月一日 4
11、 宁夏正源建设监理有限公司分户验收方案5、建设地点:XX市XX县区德胜商住区西北侧6、占地面积:69747㎡7、总建筑面积:266427㎡ 8、栋数、层数:本项目共八栋楼,其中5—4X、5—5X、5—9X楼为18层, 一、二层带商网。5—10X至5—14X楼为32层, 9、结构类型:框架-剪力墙结构11、计划开工日期:本项目划分为i、ii两个标段,i标段为5-4X、5-5X、5-9X、5-10X、5-11X楼,ii标段为12X~14X楼。i标段计划开工日期为2012年月日,ii标段计划开工日期为2012年月日。 12、计划竣工日期。i标段计划竣工
12、日期为201年月日,ii标段计划竣工日期为201年月日。 13、工程总工期。i标段为天、ii标段为天。 14、合同质量等级:合格15、工程现场条件及特点: 本工位于XX市XX县区德胜商住区西北侧,本项目西侧为唐徕渠,北侧为北三环,东侧为天鹅湖小镇,南侧为艾依河。5X地位于整个项目的东北侧。地基处理为砂夹石换填,全程降水方能确保基础施工。施工前期土方开挖、换填、降水、同时施工作业,且土方工程为当地农民,质量、安全管理协调难度大。建设单位前期手续不全也给工程进展带来不利影响。室外自然地坪普遍较低,后期回填土土方量大。建筑物外立面造型较为复杂,一二层外立面为石材干挂 5 某公司分户验收实施方案.doc免费为全国范文类知名网站,下载全文稍作修改便可使用,即刻完成写稿任务。 支付6元已有11人下载 下载这篇word文档 第8页 共8页