1、附件1: 岩土工程勘察费用计算表 序号工作内容类别工作量单价调整系数技术工作费比例工程勘察实物收费(元)工程勘察技术服务费工程勘察收费基准价数量单位(元)/(%)1工程测量定点测量勘探点12组日10001.0221.002640.001911561.02断面测量(比例1:200)简朴46km10161.02246736.0010281.922岩土工程勘察工程地质测绘(比例1:500)中等2.5Km2114751.310037293.7537293.75钻探D10932m711.310086023.6086023.60268m711.810034250.4034250.40233m1171.31
2、0035439.3035439.3067m1171.810014110.2014110.20335m3011.8100181503.00181503.0010D20185m3771.8100125541.00125541.00超重型圆锥动力触探D10565m4131.3100303348.50303348.5010D2011m5161.31007378.807378.80原则贯入试验D20150次1081.310021060.0021060.00取样取土D30扰动取土45件151.3100877.50877.50D30固定活塞薄壁取土65件3601.310030420.0030420.00取水样D30/12件401.3100624.00624.003室内试验土工试验颗粒分析筛析法45件701.0103150.00315.00土常规试验65组2531.01016445.0016445.00土旳腐蚀性分析12件2201.0102640.00264.00水质分析水质简分析12组2201.0102640.00264.004岩土工程验槽/12组日1000/1.00/5进出场费钻机包干30000.00/合计1003481.05908079.97