1、 YANPET BENZENE MITIGATION PROJECT CORRECTIVE ACTION PROCEDURE 11108-PI0311-Q-005 B0 20SEP REVISED AS COMMENT Hou YS A 24JUL ISSUED FOR REVIEW Hou YS Yao X Cai YS REV DATE DESCRIPTION PREP'D CHK'D APP'D Contents 1 SCOPE
2、2 2 REFERENCES 2 3 RESPONSIBILITIES 2 4 WORKING PROCEDURE 3 5 ATTACHMENT 7 1 SCOPE 1.1 This document is formulated to eliminate cause of nonconformity to prevent their recurrence and continually improve Wison’s Quality Management System on YANPET BENZENE MITIGATION PROJECT. 1.2 This do
3、cument specifies the requirement of corrective action establishment, review, implementation and verification. 1.3 This document is applicable to prevent recurrence of major nonconformities and respective minor nonconformities discovered during implementing Quality Management System. 2 REFERENCES
4、 The following normative documents contain provisions which, through reference in this text, constitute provisions of this document. For dated references, subsequent amendments to, or revisions of, any of these publications do not apply. However, for updated references, the latest edition of the n
5、ormative document referred to applies. Project Quality Plan 11108-PI0302-Q-001 Project Quality Audit Procedure 11108-PI0311-Q-003 Nonconformance Procedure 11108-PI0311-Q-004 ITB4.7 ISO 9001: 3 RESPONSIBILITIES 3.1 QA/QC GROUP The main responsibilities o
6、f QA/QC Group are as follows: a) Conduct analyzing cause of major nonconformities and respective minor nonconformities discovered during implementing Quality Management System; b) Conduct analyzing cause of major nonconformities found in Quality Special Inspection by the Project; c) Assist determ
7、ining corrective actions for nonconformities found during Quality Management System and Quality Special Inspection conducted by the Project; d) Conduct verifying effectiveness of corrective actions taken for nonconformities found during implementing Quality Management and Quality Special Inspection
8、 conducted by the Project. 3.2 Other Group The main responsibilities of other groups are as follows: a) Collect nonconformities and communicate information to relevant groups; b) Analyze cause of major nonconformities and respective minor nonconformities discovered in the group; c) Determine Co
9、rrective actions for nonconformities which is the duty of this group and implement corrective actions; d) Organize verifying effectiveness of corrective actions taken for nonconformities related to this group; e) Assist relevant group to analyze cause, determine and implement corrective actions.
10、4 WORKING PROCEDURE 4.1 Collecting Nonconformities 4.1.1 Nonconformities discovered during implementing Quality Management System shall be disposed according to requirements of 11108-PI0311-Q-004 Nonconformance Procedure and ITB 4.7. Moreover, corrective actions shall also be taken to preve
11、nt recurrence of nonconformities for the following cases: a) Major nonconformities; b) Respective minor nonconformities; c) Nonconformities discovered in management system audit activities. 4.1.2 Sources of nonconformities mainly include the following aspects: a) Complaints from interested p
12、arties, such as clients; b) Nonconformity report, management review report; c) Nonconformities discovered during executing project; d) Result from inspections and measurement activities; e) Result from monitoring and measurement activities, such as results from all levels and all kinds of inspec
13、tions and assessments. 4.1.3 Various groups shall actively collect nonconformities and communicate relevant information to responsible group. The division of responsibilities are as follows: a) Quality group shall be responsible for collecting and communicating nonconformities during whole process
14、 of project execution; b) Quality group shall be responsible for collecting and communicating nonconformities from audit and review of management system; c) Other groups shall be responsible for collecting and communicating nonconformities related to this group; d) Group which conducts inspectio
15、ns and assessments shall be responsible for collecting nonconformities found in all kinds of inspections and assessments, and communicating them to relevant groups. 4.1.4 All groups shall summarize and analyze nonconformities to determine the need for taking corrective actions. 4.2 Analyzing caus
16、e and determining corrective actions 4.2.1 Responsible group shall analyze cause of nonconformities with relevant group and carry out the investigation as needed when receiving nonconformities. Cause analysis can be considered from several aspects such as personnel, machinery, material, method, wor
17、k environment, etc. Statistic techniques, such as cause and effect diagram, can be adopted to analyze cause as appropriate. 4.2.2 Responsible group shall put forward corrective actions corresponding to cause of nonconformities and review them with relevant groups, so as to: a) Further determine n
18、ecessity and pertinence of corrective actions proposed; b) Evaluate adequacy, suitability and effectiveness of corrective actions proposed. 4.2.3 Corrective actions shall be appropriate to nonconformities’ severity, impact, possibility of recurrence, difficulty degree of implementation and economi
19、cal efficiency. Person in charge of implementing corrective actions, responsibilities, time limit, other resources requirements, involved changes and alterations shall be made necessary arrangements. 4.2.4 Responsibilities assignment of organizing cause analysis and determining preventive actions s
20、hall refer to clause 4.1.2. 4.3 Implementing and verifying corrective actions 4.3.1 After corrective actions are determined, responsible group shall implement corrective actions with the assist of relevant group as required. 4.3.2 Quality group shall organize verifying effectiveness of corrective
21、 actions taken for nonconformities discovered during implementing Quality Management System and in Quality Special Inspection conducted by the Project after the corrective actions being completed on schedule. Responsible groups shall organize verifying effectiveness of corrective actions taken for n
22、onconformities discovered in the group. Verification involves the following aspects: a) Determine that corrective actions have been completed as required; b) Demonstrate that analysis of cause is accurate; c) Judge that corrective actions are effective and corrective actions taken can prevent rec
23、urrence of nonconformities. 4.3.3 If corrective actions can not be completed within scheduled time, responsible group shall report to group in charge and give reasonable reasons. After application is approved by group in charge, reasonable group shall reschedule implementation plan. 4.3.4 Correcti
24、ve actions that haven’t achieved expected effect after verification can be divided into following to situations. If it is caused by implementation deviation, reasonable group shall implement original corrective actions; if it is caused by inappropriate actions, responsible group shall re-analyze cau
25、se, re-determine corrective actions and implement the new corrective actions. For above two situations, it is necessary to implement verification. 4.4 Other Requirements 4.4.1 Group in charge and responsible group shall keep records related to nonconformities collection, cause analysis, corre
26、ctive actions determination and implementation. The forms of records can be as follows: a) Corrective Action Record; b) Special report / notification; c) Inspection report / summary; d) Meeting minutes; e) Nonconformity report, etc. 4.4.2 Corrective actions for nonconformities discovered
27、 in internal audit shall be taken according to requirements of Project Quality Audit Procedure 11108-PI0311-Q-003 and this document. Corrective actions for improvement items determined in management review shall be taken according to requirements of Management Review and this docum
28、ent. 4.4.3 If corrective actions shall cause modification of management system document, Quality group shall collect feedback from relevant groups and conduct document modification according to requirements of Procedure for Document Control. 4.4.4 Various groups shall summarize correct
29、ive actions taken by the group into management review presentation materials. Quality group shall gather corrective actions taken by Project Management Teams and input them into management review. It can provide basis for continual improvement of management system. 5 ATTACHMENT Attchment-1 Form QF0141 CORRECTIVE ACTION REPORT Attchment-2 Form QF0142 CORRECTIVE ACTION REPORT LOG