1、 Risk Assessment Part 1: Assessment with existing control measures A Business: …TURBINE SYSTEMS Department: …DIMENSIONAL Dept. no.: …2225 Location: …PCF Activity (or area) being assessed: …Dytel/Moore Vernon Gauges B Assessment ref. no. … Date of assessment: …31/03/04 Assessor(s)
2、/team: …P.REEK …G.STICKA S.SARGEANT … People Rolls-Royce: 8 Frequency/duration: 8hs 3shfts affected: Others: 0 Frequency/duration: N/A Q Periodic reviews – maximum intervals for activities with: Medium risk (but AL
3、ARP) - annually Low risk - three-yearly 1st Review Date: 31/03/05 Name: P.REEK Signed: 2nd Review Date: Name: Signed: 3rd Review Date: Name: Signed: 4th Review Date: Name: Signed: D J C E G H Hazard (potential for harm) Hazardous e
4、vent (what happens) Foreseeable cause (cause of hazardous event) F Consequence (outcome) Existing control measures used Probability 1 to 5 Risk 1 to 25 Details of harm Value 1 to 5 Example: Working at height Fall from ladder Loss of balance Broken limbs 3 Ladder in good co
5、ndition, at correct angle and tied off 3 9 medium 1Trapped Hand Fixture closing on components Unsafe working practices Broken fingers 1 Safe procedures,Machine integrated 1 2 2Operation of machine RSI Continuous loading & unloading of components Wrist & backache 2 Intermittent bre
6、aks 3 6 3Visual imparement Examining results on display screens Continuous use of DSE Gradual deteration of eyesight 3 DSE legislation, not a continuous process 2 6 4Noise General factory noise Finish area extraction & machine noise Gradual hearing impairment 3 Area is ppe controlled
7、 & hearing protection must be worn 2 6 5Physical injury Dropping of tooling fixtures unsafe working practices Bruises & abrasions, possible broken fingers 1 Operator training 1 2 6Hand held tooling vibration Vibration white finger from moving parts Continuous use of air tools Vibration
8、 white finger 2 Annual monitoring @ OHD 2 6 Risk Assessment Part 2: Assessment of risk reduction actions Lead Assessor Accountable Manager Signed Name (print) Position Date P M N L K é é é é
9、Re-assess risks to show how proposed actions will be effective in reducing the risk. Also consider whether any new hazards will be introduced . Proposed actions (risk reduction measures) Expected risk after completion of actions Planned action completion date Actual completion date I confi
10、rm that the proposed actions have been completed and that the expected risk reduction has been achieved Consequence Probability Risk Name Signature Date Example (continued): Use tower scaffold or hydraulic access platform ……but remember to consider additional hazards 3 2 6 med 1/1/200
11、1 25/12/2000 J. Bloggs Joe Bloggs 26/12/2000 1 2 3 4 Noise reduction plan in progress 0 0 2 5 6 Better Hand tooling 1 1 1 R Consequence Probability People Assets Environment Reputation
12、 Incredible Extremely unlikely to ever occur Improbable Unlikely but may occur exceptionally Occasional Likely to occur some time Probable Likely to occur often Frequent Regular or continuous occurrence 1 2 3 4 5 Multiple fatalities Extensive damage Significant harm* International
13、impact 5 High Single fatality Major damage Moderate, long-term harm* National impact 4 Medium Major injury Localised damage Moderate, short-term harm* Considerable impact 3 Low Lost time injury Minor damage Low impact, little harm* Limited Impact 2
14、 First aid injury No damage No impact* No Impact 1 * Refer to “Environmental Aspects and Impacts Assessment methodology and EnvAID user’s guide” for explanation of environmental probability and consequence categories. Page 5 Guidance on Completion of Risk Assessmen
15、t Form Box/Column Explanation (for detailed guidance refer to risk assessment guidance document) A Provide details of the activity being assessed and the business and department to which it relates. Where the risk assessment is generic it should be clearly stated. Indicate the people who coul
16、d be affected (including contractors and the public) and the frequency and duration of exposure – precise details are not required. B A unique reference number should be allocated to the assessment, and the date of the initial assessment and the main parties involved should be recorded. C Hazard
17、 The hazard is the thing with the potential for harm, such as a flammable substance, rotating machine or deep water. Record all of the significant hazards associated with the activity being assessed. Ignore any trivial hazard. The form provides space for listing six hazardous events (i.e. outcom
18、es) – if more are needed, continue on an additional sheet. Although the risk assessment matrix covers risks to people, assets, environment and reputation, each of these risk areas should be considered separately, e.g. consider environmental hazards independently. D Hazardous Event: Give a very br
19、ief description of the hazard scenario or event – i.e. what happens that could lead to harm. E Foreseeable cause: Record the plausible causes of each hazard being released or the foreseeable causes of exposure to the hazards. E.g. how the substance is released, how a person becomes trapped in a d
20、angerous machine, how a person comes into contact with deep water. F Consequence: This column is divided into two parts. The first gives brief details of the outcome of the hazardous event, whilst the second part records the value associated with the harm, taken from the risk matrix. Clearly th
21、e description of the harm should relate to the appropriate category in the matrix. First aid injury: local first aid treatment received but no significant lost time. Lost time injury: off-site medical treatment or short-term lost time (e.g. days). Major injury: immediate major trauma long-term
22、lost time (e.g. weeks) It is important to be realistic is considering consequence, and although unlikely events should be considered, they should nevertheless be plausible. Note that if there is more than one plausible outcome from a hazardous event, each will need to be considered separately. Ta
23、ken together, columns C to F should provide an understanding of the hazardous event being considered. G Existing Control Measures: The presence of any existing control measures may reduce both the probability of an incident occurring and the scale of the consequences, and should be recorded to en
24、sure that they are taken into account by the risk assessment and not overlooked. This record of control measures will also be useful when preparing a written safe system of work, which should draw from the risk assessment. Any control measures specified should be those that are actually used, and
25、should be adequate for the purpose and regularly reviewed to ensure that they continue to be maintained as effective controls. If there is doubt about the genuine usage or effectiveness of a control measure it should not be included as a risk reduction measure. H Probability: Using judgement base
26、d on experience and historical evidence, estimate the probability of each hazardous event occurring using the categories given in the risk matrix. In considering the probability account should be taken of the control measures that are in place providing that they are genuinely used and of benefit.
27、If in doubt about which category to select, err on the side of caution. Further guidance on the selection of probability categories relates to the assessment teams’ experience, as follows: Incredible: No one in the team/workgroup has heard of this occurring in the industry. Improbable: One person
28、 in the team/workgroup knows of someone who has experienced this. Occasional: One person in the team/workgroup has experienced this at least once in the last two years. Probable: All persons in the team/workgroup experience this at least once a year. Frequent: All persons in the team/workgroup ex
29、perience this more often than not when doing this activity. J Risk: The value of risk is determined by combining (multiplying) the values sexed for consequence and probability for a given hazardous event. The risk matrix facilitates this and results in one of three risk categories being selected
30、 i.e. High, Medium or Low. K Proposed Actions: The tolerability of the risk assessed in column H will determine whether further actions are required for risk reduction. High risks cannot be tolerated under any circumstances and will require immediate action to reduce the level of risk to ‘as
31、 low as reasonably practicable’. If necessary this may require temporary suspension of an activity or the installation of temporary control measures. Medium risks - judgement will need to be made on the urgency of further action to reduce the risk to a level that is ‘as low as reasonably practicab
32、le’. In specifying actions for further control measures, consider both immediate (interim) actions and long-term (permanent) solutions. Low risks are broadly tolerable but should be kept under review and reduced further wherever reasonably practicable. However the principle of continuous improvemen
33、t should be employed to continue to drive down risk where economically valid. In deciding what action to take to reduce risks a hierarchical approach should be taken, further details of which are given in Section 2.3.3 of the main document. L Expected risk after completion of actions: Once actio
34、ns have been selected the risks should be reassessed to ensure that the required risk reduction will be achieved, i.e. that the revised level of risk is tolerable. If it is not, alternative or additional actions will be required. Note that actions intended to reduce risks may also introduce furthe
35、r hazards and therefore risks – it is therefore important to consider any additional hazards in the reassessment. M Planned action completion date: When a satisfactory means of risk reduction has been determined through appropriate actions, it is important that they are actually carried out to an
36、 acceptable timescale. The planned completion date will need to be carefully considered, and if the activity is allowed to proceed in the meantime, additional precautions may need to be put in place temporarily. N/P Actual completion date and confirmation of completion: When a risk reduction act
37、ion has been completed, the date should be recorded and the action signed-off. This is an important part of the process as any actions not enforced will render the risk assessment useless. The sign-off will also provide an auditable record. If the initial risk assessment for a given hazard has co
38、ncluded that no additional actions are necessary, columns L, M, N and P will not need to be completed. Temporary control measures need to be in place before the activity begins. Q Periodic reviews: The completed risk assessment should be reviewed periodically to ensure that it remains up-to-date
39、 and relevant to the activity. Maximum intervals for review relates to the level of residual risk associated with the activity, and are as follows: · Medium Risk (which have been justified as ALARP) – annually · Low Risk – every 3 years. Clearly high risks are not tolerable and so activities wil
40、l not have a high residual risk. In addition to periodic reviews, risk assessments should be revisited: · whenever significant changes in circumstances occur (including changes to the operation of the activity or in light of new legislation and other requirements); · following any incident. R S
41、ign-off: On completion of the risk assessment the form should be signed-off by the assessor and by the manager who is accountable for the working activity or area which has been assessed. Sign-off may be before box P is signed to verify that actions have been completed. Indicate if any of the fo
42、llowing apply to the work activity (check relevant boxes) (ensure that site-specific hazards are included) Plant and Equipment Place of Work Crushing Buried services Impact Emergency escape route Puncture Falling objects Trapping Housekeeping/tidiness Contact (cutting, fr
43、iction, abrasion) Obstruction Display Screen Equipment Overhead cables Electrical (shock/burn/explosion) Safe means of access Entanglement Slips and trips Ejection (work piece/tool, etc.) Structural integrity Hand tools Trespassers Noise/Vibration Work near liq
44、uids Pressure (release of energy) Working at height (e.g. roof, ladder, scaffold) Radiation (ionising, non-ionising) Materials and Substances Stability/overload Asphyxiants Stored Energy (spring, hoist, suspended load) Combustible materials Thermal Corrosives/irritants
45、 Vehicles and traffic movement Dust fires & explosions Work Organisation Flammable/explosive substances Lone working Gases, fumes & vapours Stress Health hazards by ingestion Working hours Oxidising substances Work in public areas Particles & mists Methods of Work
46、Working Environment Ergonomics Confined space Manual Handling Fire Posture Lighting Repetitive movements Noise Other Temperature Environmental aspects (e.g. waste disposal) Ventilation Natural hazards (e.g. weather) Table 1 Hazard Checklist