资源描述
1.Short orders review
Functions / Sub-Functions ID :
Module - Functions Name :APS-FP
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
short orders review
Dependencies / Prerequisites
ICP后存在short order
注意:
1、 订单short的主要原因是制造件无bom或无routing、采购件无供应商。目前FP查询到欠料的订单和欠料的物料,但不能直接查询到原因。在订单的demand order plan可以查询订单的物料需求明细,在short qty栏目可以查询到订单所有欠料的物料。在item表中查欠料item的vendors、routings的值大于0,可以确认是否有供应商和工艺路线。在bom_components_data中可以查询item是否有bom(建议在ERP环境查询是否有清单,FP查询时需要打开整个bom表,查询困难)。
Responsibility
(required to execute this test case)
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Test Defect number
1
查看short order的基本情况
Functions/ Problem Analysis/ Problem List
点击Functions/ Problem Analysis/ Problem List,在打开的Problem summary表中shortorder一栏即说明了short order的概况。Total Count中数值是所有需求订单数量,Problem Count中是short order的数量
记录下short order的数量
2
检查short order的demand order plan:Problem List/Problem summary
1、 在Problem List/Problem summary表中点击Short Orders,
2、 在打开的short orders表中点击任何一个订单,在弹出的菜单中选择Demand Order Plan,进入此订单的Demand Order Plan界面
3、 点击filter漏斗,在过滤条件中输入short qty>0条件,点击apply and return
4、 点击表头,在弹出的菜单中点击Export to Spreadsheet,将输出的XLS格式文件保存在本地
记录下该short order的订单名称和下载只有短缺物料的demand order plan表
3
按订单order查询short order
Functions/Problem Analysis/Short Orders By Order
1、 点击Functions/Problem Analysis/Short Orders By Order
2、 点击表头demand order,在弹出的菜单中选择find,输入步骤2中查询的订单名称,点击find first
记录该订单下短缺的物料(demand part)、该物料短缺数量(short),并与步骤2中下载的表单比较是否一致
4
按短缺物料part查询,输出短缺物料清单
Functions/Problem Analysis/Short Orders By Part
1、 点击Functions/Problem Analysis/Short Orders By Part
2、 点击custome按钮,将UD Planner Code、make or buy、Vendors、Routings等字段加入,点击apply and return
3、 点击表头,在弹出的菜单中选Export to Spreadsheet,将输出的XLS格式文件保存在本地
可以从下载表中得出制造件routings=0、采购件vendors=0的物料清单
5
Test Case Author:
褚小四
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
2. Review Freeze Horizon
Function / Sub-function ID :
Review Freeze Horizon
Module - Function Name :
FP-Review Freeze Horizon
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
审视冻结期计划
Dependencies / Prerequisites
在ERP中选择三个WIP(JPZC0311412/JPZC0310614/JPZC0310511),全部都用到资源DSAPCB/RL028。
目前冻结期设置为2天,现在的系统开工时间为1.19日。
Responsibility
(required to execute this test case)
HW SIT FP
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Test Defect number
1
在系统文件中检查
查看Data Files-> production_schedule_data
1. 选择Filter,确定Resource= DSAPCB/RL028
这个操作只能在VB环境中完成
在Mfg Order Id中可以找到三个任务令JPZC0311412/JPZC0310614/JPZC0310511,并且顺序如上排列
2
返回ERP检查WIP的资源使用时间
1、 在ERP的View Discrete Jobs的中分别输入上面的三个任务令号,可以查到他们在这个资源对应工序的开工时间(First Unit Start Date)
2、 比较三个任务令的开工时间,开工的顺序与前面在FP的数据文件中的顺序相同
1、 JPZC0311412的开工时间:21-JAN-2003 06:48:00
2、 JPZC0310614的开时间:21-JAN-2003 17:18:00
3、 JPZC0310511的开工时间:24-JAN-2003 11:04:00
3
在FP的上一界面
1、 在Resource选定后,左键选择Load Graph
2、
1、可以查看到三个任务令在资源中的开始时间会重新排列,尽可能早的开工。以保证物料优先分配
4
5
6
Test Case Author:
叶怡志
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
叶怡志 on 11/18/2002
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
3.ATO WO write back
Function / Sub-function ID :
整机任务令回写
Module - Function Name :
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
Dependencies / Prerequisites
回写FP计划给ERP中WIP未开工工序的计划开始时间和完工时间;及未开工工序的资源;BOM是不回写的(整机不设替代物料);这个逻辑适用于RELEASED、UNRELEASED、HOLD状态的所有任务令(整机先在ERP中创建的任务令不存在在FP中创建MFG ORDER)
Responsibility
(required to execute this test case)
FP计划
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Remarks including performance problem
Defect Number
1
FP中的MFG ORDER
释放未完工:JF211720477
释放HOLD :JF211720483
未释放未HOLD:JF211720479
未释放HOLD :JF211720480
FP这些任务令的工序情况、资源情况
记录回写前最新FP的未开工工序的开始完成时间、每道工序的主资源占用时间段(开始-完成时间)、及并行附资源的时间(在ROI集成时回写)
2
验证ERP与FP排产后的结果一致性
进入WIP下OPERATION、ROUTING下查寻结果
1、 工序、主资源时间一致
2、 付资源的时间<=主资源的时间
Test Case Author:
王文恒
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
4. Review Capacity Plan
Function / Sub-function ID :
APS
Module - Function Name :
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
CAO后手工调整,将工单移到其他资源和bucket.
Dependencies / Prerequisites
Responsibility
(required to execute this test case)
FP
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Remarks including performance problem
Defect Number
1
FP-àFunctionsàProblem List
1.查看Capacity Shortages
有多个资源超负荷.
2.将CAO Options
中选项No Duedate Violation前的(√)去掉.
.运行CAO
CAO正常运行.
3. 重新查看Capacity Shortages
有超负荷的资源存在.
4.选择该资源,查看Load Grouph上的负荷情况.
5.选中超负荷的bucket,点击View tasks.
6.选中需要move的demand order。
点击Move and propagate
选择目的bucket!
工单移动到该Bucket.
7. 重新选择一个含有替代资源的资源。
点击VIEW TASKS
再选中需要move的demand order。
点击Move to alternate resource.
选择目的bucket!
工单移动到该Bucket.
Test Case Author:
李永志
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
5.PH WO write back
Function / Sub-function ID :
APS
Module - Function Name :
FP
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
ERP中手工下达的PH加工任务令经FP排产后回写到ERP系统WIP模块.
FP模块自动产生的PH加工任务令不回写!
Dependencies / Prerequisites
1.Item 02300073为PH项目,加工任务令JPZ30113011已经在ERP中手工定义,routing为手工定义.
2.订单1330200中的PTO1 01010082含有的0230073为PH项目,FP产生的任务令MG00003.
3.FP信息可以正常回写ERP.
Responsibility
(required to execute this test case)
计划员
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Remarks including performance problem
Defect Number
1
FPèFactory model->MFG ORDER
1.点击Find,输入JPZ30113011查找.
JPZ30113011在FP中存在.
2. 点击Find,输入查找MG00003..
MG00003.在FP中存在.
2
ERPàWIP--.>Discrete jobs
1.输入jobs= JPZ30113011
点击FIND
JPZ30113011在
ERP中存在.
2.点击Operations,查看Dates.
将WIP中的计划与FP中的
mfg order plan比较.
二者计划相同.
1.输入jobs= MG00003
点击FIND
MG00003在WIP中不存在
Test Case Author:
李永志
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
6.Check the FP plan result exporting to ERP
Function / Sub-function ID :
APS.ERP.
Module - Function Name :
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
Sales order1330214的shipset1经FP排产后的计划发货日期输出到ERP的OM模块对应Shipset1的Schedule ship date栏内,检查二者数据是否一致.
Dependencies / Prerequisites
Sales Order1330214 的Shipset1在ERP中的要求到货日期为2002/10/29日.运输方式为汽运.运输时间为5天.
Sales Order1330214 的Shipset1在FP中对应的Demand Order Part Id为 SO-sales Order1330214-shipset1
Responsibility
(required to execute this test case)
计划员
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Remarks including performance problem
Defect Number
1.
FP-àFunctionsàFactory Model
1.点击 Orders,
在demand orders界面查看 Demand Order Part Id为 SO-1330214 -shipset1对应的sales order1330214的due date时间,
Completion Date.
Sales Order1的due date为2002/10/29.
Sales Order1的Completion date为2003/1/22.
2.
ERP->OM Inquiry->View Sales Order
1在Find Orders界面输入:
Order Number为1330214.点击FIND.
2.在Order Organizer界面点击OPEN Order.
3.点击Line Items.
点击Shipping
查看shipset为shipset1的订单行的Schedule ship date.
Schedule arrival date
Request date.
Schedule ship date为2003/1/22.
Schedule arrival date 为2003/1/27
Request date.为2002/10/29.
Test Case Author:
李永志
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
7.Test the reservation data from ERP to FP
Function / Sub-function ID :
APS
Module - Function Name :
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
一个订单包含以下订单行:
1.已全部预留的订单行一个.
2.已部分预留的订单行一个.
3.未预留的订单行一个.
Dependencies / Prerequisites
订单已经book,定单已经预留.
Responsibility
(required to execute this test case)
WIP
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Remarks including performance problem
Defect Number
1
FP-àFunctionsàFactory Model
1.点击Orders,在Demand Orders界面查看,
查看order1的各订单行的物料需求情况。
1.已预留,未发料的订单行一个.
该订单行需求数量为全部需求。
2.已预留,已全部发料的订单行一个.
该订单行需求数量为0。
3.已预留.部分发料订单行一个.
该订单行需求数量为全部需求减去已发数量
4.未预留的订单行一个.
该订单行需求数量为全部需求
Test Case Author:
李永志
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
8.The plan for one part have bom/routing/supplier
Functions / Sub-Functions ID :
Module - Functions Name :APS-FP
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
Bom/routing/supplier都有的part的物料计划
Dependencies / Prerequisites
1、ERP中采购件04024575/04023246有供应商及BOM、ROUTing,有加工任务令和PO,04024575采购提前期长于工艺路线对应的加工提前期,04023246相反,二者各有100的wip;04024575的下层物料25070030/14040153有部分库存
2、31130602供应商有BOM,无routing,其下层物料31160610/31040486/31020501/31180363无库存
3者有连续的需求(有预测需求),且有早于最小提前期的需求未被已有供应满足。
注意:
1、 FP逻辑,如果一个器件有供应商的,FP会首先检查是否有对应的供应商,如果有则产生建议PR,没有再检查Bom和Routing。如果订单延迟或short且制造完工日期比采购的快,则调整为工单。
2、 有BOM,无routing项目集成时会虚拟一个routing-H80#DUMMY_ITEM,虚拟routing提前期为零
Responsibility
(required to execute this test case)
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Test Defect number
1
查看供应商leadtime
Functions /Validate Data/Factory Data Files
1、在Functions /Validate Data
下点击Factory Data Files,点击打开supplier_part_data,在展开的窗口查找04024575/04023246/31130602/25070030/14040153,记录下其leaditime
记录其leaditime
04024575的leadtime为17和20天;04023246的leadtime为1天;31130602的leadtime为10天;
25070030:13/10天;14040153:17/14
Pass
2
查看routing数据
Functions /Validate Data/Factory Data Files
1、在Functions /Validate Data
下点击Factory Data Files,点击打开routing_data,在展开的窗口Routing字段查找H80#04024575/04023246/31130602,记录下其leaditime
记录下其Unit Runtime、Preop Time
H80#04024575的5工序Unit Runtime为1.0E-4hr,合计Preop Time为56小时;H80#04023246的4工序Unit Runtime为1.0E-4hr,合计Preop Time为62.5小时;无H80#31130602的routing
Pass
3
查看04024575的part buffer
Functions->Factory Model
1、在Functions/Factory Model 下点击items,展开的窗口查找04024575,点击后在弹出的菜单中选择:part buffer,在part buffer窗口中选择supply窗口
2、记录下供需匹配情况
在物料25070030、14040153充分时,对延迟订单产生工单,其余需求产生PR
与期望一致
Pass
4
查看04023246的part buffer
Functions->Factory Model
1、在Functions/Factory Model 下点击items,展开的窗口查找04023246,点击后在弹出的菜单中选择:part buffer,在part buffer窗口中选择supply窗口
2、记录下供需匹配情况
只产生PR
与期望一致
Pass
5
查看31130602的part buffer
Functions->Factory Model
1、在Functions/Factory Model 下点击items,展开的窗口查找31130602,点击后在弹出的菜单中选择:part buffer,在part buffer窗口中选择supply窗口
2、记录下供需匹配情况
只产生PR
与期望一致
Pass
Test Case Author:
褚小四
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
9.no standard WO and material requirement
Functions / Sub-Functions ID :
Module - Functions Name :APS-FP
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
非标任务令供应及物料需求
Dependencies / Prerequisites
1、Released非标任务令WIP0006CXS (03032262*100pcs,MRP net数量为80、开工时间24-DEC-2002 17:12:00完工时间03-JAN-2003 17:59:00,物料需求是40060036/03032262各100pcs,已各分配2pcs,任务令本身设置了工艺路线,03032262有标准的清单和工艺路线),
2、Unreleased非标任务令CXS0011WIP (03030597*100pcs,MRP net数量为60、开工时间16-DEC-2002 00:00:00完工时间07-JAN-2003 00:00:00,物料需求是03030597*100pcs,未分料,任务令本身无工艺路线,03030597有标准的清单和工艺路线)。检查
1、是否产生新的物料需求(包括标准清单中的需求)
2、是否作为供应,可供应的数量是否80pcs
2、 完工日期、时间是否一致
3、 检查是否占用资源
注意:
对非标任务令,集成时将其ERP开工时间集成在FP的MFG hold date,
Responsibility
(required to execute this test case)
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Test Defect number
1
Functions /Manufacturing Orders表
从Mfg Order栏目查找WIP0006CXS,点击它,在弹出菜单中选Demand Order Plan
检查PST、PCT是否与ERP开/完时间一致
与ERP开工时间一致
一致
Pass
检查展开的下层物料,是否其Required By Demand大于零
等于零
一致
Pass
检查Planned qty/Wip qty是否等于ERP mrp net数量
等于
一致
Pass
2
Functions /Manufacturing Orders表
退至Mfg Order栏目查找WIP0006CXS,点击它,在弹出菜单中选Mfg Order Plan,检查速所有资源上的Stretched Runtime是否等于零
等于零
一致
Pass
3
Functions /Manufacturing Orders表
查找WIP0011CXS,重复以上步骤
同上
一致
Pass
Test Case Author:
褚小四
Test Case Reviewed by:(inc. date)
Test Executed by: (inc. date)
Output attached: (yes/no)
Test Retested by: (inc. date)
Results Reviewed by:(inc. date)
Sign off
10.Different material issue scenario
Functions / Sub-Functions ID :
Module - Functions Name :APS-FP
Test Name (TBA by BD)
Test ID (TBA by BD)
Test Condition /
Test Scenario:
Different material issue scenario
ODS获取ERP数据后,库存可用数据、PO到货时间发生变化
Dependencies / Prerequisites
1、 原材料21130825原库存314pcs,全部隔离
2、 半成品03032262库存417pcs,今天收到临时技术更改需要返工,预计返工的完工日期是10天以后
3、 原材料03012353,PO JP2L618SG2共2004pcs 采购通知到货时间延迟一周
注意:发生上述情况时,在审视ICP计划结果时可以通过净改变net change来修改供应数据,由于净改变所需时间较长,影响较小时不推荐
Responsibility
(required to execute this test case)
Step #
Navigation
Action
Expected Results
Actual Results
Pass /
Fail
Test Defect number
1
修改21130825库存数据
Functions->Factory Model
1、在Functions/Factory Model 下点击items,展开的窗口查找原材料21130825,点击后在弹出的菜单中选择:part buffer,点击supply
2、选择supply为unspecified,supply qty等于314的供应,在此供应行前打勾,点击edit receipt按钮,进入修改界面,修改数量为0,Replan Using This Part和
Replan Short and Late Orders两选项前打勾,点击submit
修改方法还有如下几种:
a、 在此供应行前打勾,点击delete receipt按钮,提示是否删除的选择yes
b、 点击需要修改数量的供应supply qty,在表单下列的edit栏目中修改数量314为0,点击update,提示supply modified,点击ok确认
(按a/b方式,Replan Using This Part和
Replan Short and Late Orders两选项都是。另外,用add receipt可以增加一条供应)
供应数量修改为零,涉及的order重新分配
完成净改变的时间为5~10分钟,且严重影响FP的处理速度,但结果与预期一致
Pass
2
修改03032262
Functions->Factory Model
1、在Functions/Factory Model 下点击items,展开的窗口查找原材料03032262菜单中选择:part buffer,点击supply
2、选择supply为unspecified,supply qty等于416的供应,,在表单下列的栏目中时间arrival time改为10天之后,点击update,提示supply modified,点击ok确认
供应时间修改为10天之后,涉及的order需求重新分配
完成净改变的时间为5~10分钟,且严重影响FP的处理速度,但结果与预期一致
Pass