1、资料内容仅供您学习参考,如有不当之处,请联系改正或者删除。 Procedure Document/程序文件Control Procedure for Process design and Development工艺设计和开发控制程序Document NO/ 编号: TY-QP7.3-01-15Revision /版本: Checked by/校对: Verified by/审核: Approved by/批准: Controlled Condition/受控状态: Distribution No./分发号: 质量管理体系更改记录表Record Chart of Changes in Quali
2、ty Management System of Quality ManualTY-QR-TQD-031A更改单编号Change Order Number文件编号Document Number处数Section Changed标志Rev更改日期Release Change更改人Change ExecutorControl Procedure for Process design and Development/工艺设计和开发控制程序1 Purpose/目的This procedure is used to normalize the management of new product proce
3、ss design and development of the company so as to ensure that all the tasks on new product process design and development of the company are implemented effectively.本程序为了规范公司新产品工艺设计和开发的管理, 确保公司新产品工艺设计和开发的各项工作得到有效实施。2 Scope/范围This procedure is applicable to control of new product process design and d
4、evelopment of the company. The content: The company doesnt cover the product design, just focusing on process design based on customer drawings.本程序适用于公司新产品工艺设计和开发的控制。但包括产品进行设计和开发。3 Terms/术语3.1 Process design output: the result of process design. Through the process design and development, the bases
5、of process design are transformed into a series of process technical data of the process design output./工艺设计输出: 指工艺或过程设计的结果。经过对工艺设计和开发, 将工艺设计的依据转化为工艺设计输出的一系列工艺技术资料。3.2 Process review: the process design is reviewed formally, roundly and systemically and the review result is documented./工艺评审: 对工艺设计进行
6、的正式、 全面和系统的审查, 并把审查结果形成文件。3.3 Overall process program: based on product design requirement, production program and productivity, the guidance document is used to put forward the technology and prepare for concrete tasks and measures./工艺总方案: 根据产品设计要求、 生产纲领和生产能力, 提出工艺技术准备具体任务和措施的指导性文件。3.4 First articl
7、e (batch) inspection: after the ready condition of trial-manufacture is qualified through check, the first batch of trial-manufactured components and parts are checked for overall process and finished products in accordance with the requirements of product drawings and technological procedure to det
8、ermine whether the production process and equipments can guarantee that the products conforming to design requirements are produced./首件( 批) 鉴定: 在生产试制准备状态检查合格后, 对首批试制生产的零、 部( 组) 件按产品图和工艺规程的要求进行全面的过程和成品检查, 以确定生产工艺和设备能否保证生产出符合设计要求的产品。3.5 Process planning: responsibilities and authorities for process de
9、sign are distributed and interface management at every stage of product process design is defined on the basis of technical documents such as product design drawing of the customer in accordance with schedules of product design and development, in order to guarantee that the process design, validati
10、on, etc are carried out as scheduled./工艺策划: 按照产品设计和开发的进度要求, 根据客户产品设计图样等技术文件, 对产品工艺设计职责和权限进行分工, 明确产品工艺设计各阶段接口管理, 保证工艺设计和验证等活动按计划进行。4 Responsibility/职责4.1 Technical Quality Department shall be responsible for centralized management of process design and development and having the process design and de
11、velopment for new product implemented;/技术质量部是公司工艺设计和开发过程的归口管理部门; 负责公司新产品工艺设计和开发工作的组织实施; 4.2 Technical Quality Department shall be responsible for business management of process design and development and having the process design and development for new product implemented;/技术质量部门负责工艺设计和开发过程的业务管理; 负
12、责新产品工艺设计和开发工作的组织实施; 4.3 All the related units of the company shall be responsible for cooperation in accomplishing all the tasks on the process design and development./公司各有关单位负责配合完成工艺设计和开发过程的各项工作。5 Working Procedure/工作程序5.1 Process Design and Development Planning/工艺设计和开发策划5.1.1 Source of Process Des
13、ign and Development Project/工艺设计和开发项目的来源a) After the new product contract or technical agreement signed by Marketing Department and the customer, or market demand is reviewed, Marketing Department shall fill in Application for Setup of Process Design and Development Project and submit it to related
14、departments and personnel for confirmation. After it is approved by General Manager, it shall be issued to Chief Engineer./营销部与顾客签订的新产品合同或技术协议, 或市场需求, 经过评审后, 由营销部填写工艺设计开发立项申请书, 经相关部门、 人员确定后报总经理批准后下发到总工程师。b) After receiving Application for Setup of Process Design and Development Project, Chief Engine
15、er shall transmit Assignment Book for Process Design and Development to lower levels and send the technical data concerning new product to Technical Quality Department./接到工艺设计开发立项申请书后由总工程师下达工艺设计和开发任务书, 并将与新产品有关的技术资料转交技术质量部。5.1.2 Chief Engineer shall determine the project leader based on the above pr
16、oject sources and transform the output of process design and development planning into Process Design and Development Plan. The plan shall include the following contents:/总工程师根据上述项目来源, 确定项目负责人, 将工艺设计和开发策划的输出转化为工艺设计和开发计划书。计划书内容包括: a) Division of the stages such as input, output, review, verification
17、and confirmation of process design and development and main work content;/工艺设计和开发的输入、 输出、 评审、 验证、 确认等各阶段的划分和主要工作内容; b) Responsibilities and authorities at all the stages, requirement of schedule and supporting unit;/各阶段人员职责和权限, 进度要求和配合单位; c) Requirement for resource allocation, e.g., personnel, info
18、rmation, equipment, fund guarantee and other related content./资源配置需求, 如人员、 信息、 设备、 资金保证等及其它相关内容。5.1.3 The output document of process design and development planning shall be revised appropriately with the schedule of design and development in accordance with the related provisions of Control Procedu
19、re for Document./工艺设计和开发策划的输出文件随着设计和开发的进展, 在适当时予以修改, 应执行文件控制程序的有关规定。5.1.4 Interface Management between Different Groups of Process Design and Development/工艺设计和开发不同组别之间的接口管理Different groups of process design and development may concern different functions or levels of the company, and the exterior of
20、 the company.工艺设计和开发的不同组别可能涉及到公司不同职能或不同层次, 也可能涉及到公司外部。a) For the communication of important design and development information between the groups, the design and development personnel shall fill in Contact Form for Process Design and Development Information. After the contact form is approved by the
21、 project leader, it shall be issued to the groups. If some tasks need to be harmonized by the director of Technical Quality Department, they cannot be harmonized until they are approved by the director of Technical Quality Department./对于组别之间重要的设计和开发信息沟通, 设计开发人员填写工艺设计开发信息联络单, 由项目负责人审批后发给相关组别, 需要技术质量部
22、主管进行协调工作的, 由技术质量部主管审批后组织协调。b) Marketing Department shall take charge of contact with the customer and information transfer to the customer./营销部负责与顾客的联系及信息传递。5.2 Process Design and Development Input/工艺设计和开发输入5.2.1 The process design and development input should include the following contents:/工艺设计开发输
23、入应包括以下内容: a) Main characteristics and performance requirements for the product. These requirements are mainly from the demand and expectation of the customer or market, normally included in the contract, order or project recommendation;/产品主要特点、 性能要求。这些要求主要来自顾客或市场的需求与期望, 一般应包含在合同、 定单或项目建议书中; b) Appli
24、cable laws and regulations and mandatory national standards shall be met;/适用的法律、 法规要求, 对国家强制性标准一定要满足; c) Applicable information provided by previous similar process design and development;/以前类似的工艺设计和开发提供的适用信息; d) Other requirements necessary for process design and development./工艺设计和开发所必须的其它要求。5.2.2
25、The process design and development input shall be documented, List of Process Design and Development Inputs shall be completed and all kinds of relevant data shall be attached./工艺设计和开发的输入应形成文件, 填写工艺设计和开发输入清单, 并附上各类相关的资料。5.2.3 The director of Technical Quality Department shall arrange the related pro
26、cess design and development personnel and associated departments to review the process design and development input and clarify the imperfect, vague or inconsistent requirements in order to ensure that the design and development input meets the requirements of the assignment book./技术质量部主管组织有关工艺设计和开发
27、人员和相关部门对工艺设计和开发输入进行评审, 对其中不完善、 含糊或矛盾的要求做出澄清和解决, 确保设计开发的输入满足任务书的要求。5.3 Process Design and Development Output/工艺设计和开发的输出5.3.1 The process design and development personnel shall launch the process design and development on the basis of Process Design and Development Plan and the program, and work out c
28、orresponding document on process design and development output, i.e., List of Process Design and Development Outputs./工艺设计和开发人员根据工艺设计和开发计划书及方案等开展工艺设计开发工作, 并编制相应的工艺设计和开发输出文件, 即工艺设计和开发输出清单。5.3.2 The document on process design and development output should be expressed in the form that it can be verifi
29、ed for process design and development input to prove that the input requirement is met and to provide suitable information for the production. The document on process design and development output shall vary with different products, including the parameters and documents for production guidance, e.g
30、., conversion drawing, process document, part list, control plan, inspection and test plan, inspection work instructions, list of purchased materials and design drawings of tooling and fixtures./工艺设计和开发输出文件应以能针对工艺设计和开发输入进行验证的形式来表示, 以便于证明满足输入要求, 为生产运作提供适当的信息。工艺设计和开发输出文件因产品不同而不同, 包括指导生产等活动的参数和文件: 如转换图
31、纸、 工艺文件、 零件明细表、 控制计划、 检验和试验计划、 检验作业指导书、 物资采购清单、 工装夹具设计图纸等。5.3.3 Technical Quality Department shall assign a person specially for checking the process data, especially checking whether the process data meet the product design requirement, the content is complete and correct, the working processes are
32、 harmonized and the processing is feasible and checkable./技术质量部指定专人负责校核工艺资料, 重点校核工艺资料能否满足产品设计要求; 内容完整、 正确; 工序之间是否协调、 加工的可行性和可检查性。5.3.4 Full (part) time standardization personnel of Technical Quality Department shall take charge of checking the data on process design and development output for standa
33、rdization./技术质量部门的专( 兼) 职标准化员负责本部门对工艺设计和开发输出资料标准化检查。5.3.5 The project leader shall review the process output document and fill in List of Process Design and Development Outputs. The output document cannot be issued until it is approved by Chief Engineer./由项目负责人对输出工艺文件进行审核并填写工艺设计和开发输出清单, 总工程师批准输出文件后才
34、能发放。5.4 Review of Process Design and Development/工艺设计和开发的评审5.4.1 The systemic and comprehensive reviews proposed by the project leader of process design as usual should be carried out at the suitable stage of process design and development./在工艺设计和开发的适当阶段应系统的、 综合的评审, 一般由工艺设计项目负责人提出。5.4.1.1 The instru
35、ction process documents such as process design and development planning, overall process program (process route) and production instructions should be process reviewed before concrete process design and development./工艺设计和开发策划、 工艺总方案( 工艺路线) 及生产说明书等指令性工艺文件的工艺评审应在工艺具体设计和开发前进行。5.4.1.2 Technological proc
36、edure for new process, key article, important article and key process (working process) and special process document shall be reviewed before first article inspection./新工艺, 关键件、 重要件、 关键过程( 工序) 的工艺规程以及特殊工艺文件的评审在首件鉴定前进行。5.4.2 Review Content/评审内容5.4.2.1 Review of Overall Process Program/工艺总方案的评审a) The
37、overall process program shall be reviewed for correctness, advancement, economy and feasibility;/审查工艺总方案的正确性、 先进性、 经济性和可行性; b) The overall process program shall be reviewed to determine whether it meets the requirements of product design and production program;/审查工艺总方案是否满足客户产品设计及生产纲领的要求; c) The prod
38、uct process division and route shall be determined reasonably and feasibly;/产品的工艺分工和工艺路线的确定是否合理、 可行; d) The bases used to determine special tooling factors shall be reviewed;/审查专用工装系数的确定依据; e) The bases and rationalities for new process, new technique and new equipment;/新工艺、 新技术、 新设备采用的依据及合理性; f) Th
39、e requirements for standardization of process technical documents;/工艺技术文件的标准化要求; g) The principles for determination and control of material consumption quota shall be reviewed./审查材料消耗定额确定及控制的原则。5.4.2.2 Review of Key Article and Important Article/关键件、 重要件的评审a) The control factors and contents of the
40、 process documents on key processes (working processes) of key article and important article shall be reviewed for correctness, rationality and inspectability;/审查关键件、 重要件中关键过程(工序)工艺文件的控制因素及内容的正确性、 合理性、 可检查性; b) The process capability index of key process (working process) shall be verified;/核实关键过程(工
41、序)的工序能力指数; c) The process methods and detection requirements for key processes (working processes) of key article and important article shall be reviewed for rationality and feasibility;/审查关键件、 重要件中关键过程(工序)的工艺方法、 检测要求的合理性和可行性; d) The setup of associated working procedure and inspection process relat
42、ed to formation of quality characteristic of key process (working process) shall be reviewed for correctness, rationality and feasibility;/审查与关键过程(工序)的质量特性形成, 涉及的关联工序及检验工序设置的正确性、 合理性、 可行性; e) The technical breakthrough measure for key process (working process) shall be reviewed;/审查关键过程(工序)的技术攻关措施; f
43、) The content of key process (working process) shall be reviewed for completeness./审查关键过程(工序)目录的完整性。5.4.3.1 Technical Quality Department shall issue the review content or related data to the reviewing units./技术质量部将评审内容或有关的资料送交各参评单位。5.4.4 Organization and Responsibility of Review/评审组织及职责5.4.4.1 Revie
44、w Organization/评审组织The process review group shall be composed of reviewers of which the chief is competent technical leader or his/her representative.由参评人员组成工艺评审组, 组长由主管技术领导或由她指定的委托人担任。5.4.4.2 Responsibilities of Review Group Chief/评审组长职责a) Preside over the meeting;/主持会议; b) Collect the problems and
45、 suggestions put forward in the review, give opinions and make conclusions;/汇集评审提出的问题和建议, 写出评语和结论; c) Assign a recorder to sort and work out the process review reports;/指定记录人员整理、 写出工艺评审报告; 5.4.4.3 Responsibilities of Reviewer/评审人员职责a) Ready for the review in advance;/提前做好参评准备; b) Give opinions fully
46、./充分发表意见; 5.4.5 Review Steps/评审步骤5.4.5.1 The review group chief shall describe the meeting and assign a recorder;/评审组组长作会议说明并指定记录人员; 5.4.5.2 The process design representative shall introduce the process design;/工艺设计代表介绍工艺设计情况; 5.4.5.3 The reviewers shall give the opinions on the review;/参评人员发表评审意见;
47、5.4.5.4 The review group chief shall define the items and contents to be improved on the basis of collected opinions, and summarize the review results to give his/her opinion or make a conclusion;/评审组组长在集中意见的基础上, 明确需要改进的项目和改进内容, 对评审结果总结形成评语或结论; 5.4.5.5 The recorder shall sort the meeting records and
48、 fill in Report on Process Design and Development Review./记录人员整理会议记录, 填写工艺设计和开发评审报告。5.4.6 Measure Implementation and Data Perfection/落实措施, 完善资料Technical Quality Department shall earnestly analyze the problems and improvement opinions put forward in the review meeting, work out the measures, have them taken and perfect the process data.技术质量部认真分析评审会议提出的问题和改进意见, 制定并落实