收藏 分销(赏)

建筑装饰工程施工合同(中英文).doc

上传人:二*** 文档编号:4693297 上传时间:2024-10-10 格式:DOC 页数:13 大小:74.04KB
下载 相关 举报
建筑装饰工程施工合同(中英文).doc_第1页
第1页 / 共13页
亲,该文档总共13页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、建筑装饰工程施工合同 (中英文)The building decorates engineering a construction contract发包方(甲方):Send report a square(the first party):承包方(乙方):Contract for a square(the second party):按照中华人民共和国合同法和建筑安装工程承包合同条例的规定,结合本工程具体情况,双方达成如下协议。According to the Peoples Republic of China contract method and building gearing the

2、engineering contract for contract regulation of provision, combine a this engineering concrete circumstance, both parties are reached as follows to negotiate.第1条 工程概况 The 1st engineering general situation11工程名称: 1.1 engineering name:12工程地点:1.2 engineering locations:13承包范围:1.3 contract for scope:14承包

3、方式:1.4 contract for a way:15工期:本工程自 年 月 日开工,于 年 月 日竣工。1.5 work periods:this engineering from Year The day of the month starts work, in Year month the day finish construction16工程质量:1.6 engineering qualities:17合同价款(人民币大写):1.7 contract payment(renminbi capital letter)s:第2条 甲方工作The 2nd first party works

4、21开工前 天,向乙方提供经确认的施工图纸或作法说明 份,并向乙方进行现场交底。全部腾空或部分腾空房屋,清除影响施工的障碍物。对只能部分腾空的房屋中所滞留的家具、陈设等采取保护措施。向乙方提供施工所需的水、电、气及电讯等设备,并说明使用注意事项。办理施工所涉及的各种申请、批件等手续。2.1 before starting work Day, provide the construction diagram paper or method elucidation that pass through confirmation toward the second party , And carry

5、on the spot to hand over bottom toward the second party.All 腾s empty or parts of 腾 vacantroom house, the clearance influences the stumbling block of construction.To can parts of 腾s get empty of house in the furniture been detained, display etc. adopt protection measure.Provide the equipmentses such

6、as water, electricity, spirit and tele-communications etc. that the construction needs toward the second party, and explain an usage regulation.Carry out various application that the construction involves, batch piece etc. procedure.22指派 为甲方驻工地代表,负责合同履行。对工程质量、进度进行监督检查,办理验收、变更、登记手续和其他事宜。2.2 partieses

7、 Halt a workplace representative for the first party, be responsible for contract to implement.Carry on a direct check to the engineering quality, progress, carry out acceptance, change, register procedure and other affairs.23委托 监理公司进行工程监理,监理公司任命 为总监理工程师,其职责在监理合同中应明确,并将合同副本交乙方 份。2.3 entrust The supe

8、rintendency company carries on an engineering superintendency, the superintendency company appoints Manage an engineer for the director general, its job is in the superintendency contract should definitely, and hand over contract duplicate the second party .24负责保护好周围建筑物及装修、设备管线、古树名木、绿地等不受损坏,并承担相应费用。

9、2.4 be responsible for a protection good surroundings building and repair, equipments pipeline, ancient tree wood, greenly etc. is free from damage, and undertake to correspond expenses.25如确实需要拆改原建筑物结构或设备管线,负责到有关部门办理相应审批手续。2.5 such as really need to dismantle to change original building structure or

10、 equipments pipeline, be responsible for department concerned to carry out to correspond an examination and approval procedure.26协调有关部门做好现场保卫、消防、垃圾处理等工作,并承担相应费用。2.6 moderate department concerned to work well the spot to protect, fire fight, garbage processing etc. work, and undertake to correspond e

11、xpenses.第3条 乙方工作The 3rd second party works31参加甲方组织的施工图纸或作法说明的现场交底,拟定施工方案和进度计划,交甲方审定。3.1 attend the construction diagram paper or method that the first party organizes explanatory of hand over bottom on the scene, project and progress of the draw-up construction plan, hand over the first party to app

12、rove officially.32指派 为乙方驻工地代表,负责合同履行。按要求组织施工,保质、保量、按期完成施工任务,解决由乙方负责的各项事宜。3.2 partieses Halt a workplace representative for the second party, be responsible for contract to implement.According to request organization construction, protect quality, protect quantity, according to the date complete cons

13、truction mission, solve various affairs which the second party is responsible of.33严格执行施工规范、安全操作规程、防火安全规定、环境保护规定。严格按照图纸或作法说明进行施工,做好各项质量检查记录。参加竣工验收,编制工程结算。3.3 carry out construction norm strictly, safety operation rules distance, fire prevention safety provision, environmental protection provision.Ca

14、rry on a construction according to the diagram paper or the method elucidation strictly, work well various quality check a record.Attend to finish construction acceptance, draw up engineering balance of accounts.34遵守国家或地方政府及有关部门对施工现场管理的规定,妥善保护好施工现场周围建筑物、设备管线、古树名木不受损坏。做好施工现场保卫和垃圾消纳等工作,处理好由于施工带来的扰民问题及

15、与周围单位(住户)的关系。3.4 obey nation or local government and department concerned manage on the scene to the construction of provision, appropriate protection good construction the spot surroundings the building, equipments pipeline, ancient tree wood is free from damage.Work well a construction to protect

16、on the scene with the garbage eliminate etc. work, handle like because the construction brings of the 扰 peoples problem and with surroundings the relation of the unit(inhabitant).35施工中未经甲方同意或有关部门批准,不得随意折改原建筑物结构及各种设备管线。3.5 under construction havent yet the first party to agree or the department conce

17、rned grant, can not fold to change original building structure and various equipments pipeline at will.36工程竣工未移交甲方之前,负责对现场的一切设施和工程成品进行保护。3.6 engineerings finish construction dont before handing over the first party, the whole facilities and engineering finished product which be responsible for to th

18、e spot carry on a protection.第4条 关于工期的约定Article 4 the engagement of the concerning work period41甲方要求比合同约定的工期提前竣工时,应征得乙方同意,并支付乙方因赶工采取的措施费用。4.1 first parties request be recruited when comparing the work ofwith contract engagement expects to finish construction in advance the second party agree, and pa

19、y the second party to adopt because of getting work done faster of measure expenses.42因甲方未约定完成工作,影响工期,工期延误。4.2 because the first party didnt agree on completion a work, influencing work a period, work period delay.43因乙方责任,不能按期开工或中途无故停工,影响工期,工期不顺延。4.3 because of the second partys responsibility, acco

20、rding to the date cant start work or cease work without cause midway, influence work period, the work expects not to postponed.44因设计变更或非乙方原因造成的停电、停水、停气及不可抗力因素影响,导致停工8小时以上(一周内累计计算),工期相应顺延。4.4 because the design changes or not the second partys reason result in of power failure, stop water and stop sp

21、irit and irresistible force factor influence, cause to cease work more than 8 hour(a with in the week total amount calculation), the work period corresponds to postponed.第5条 关于工程质量及验收的约定Article 5 engagement concerning the engineering quality and the acceptance51本工程以施工图纸、作法说明、设计变更和建筑装饰工程施工及验收规范(JGJ73

22、-91)、建筑安装工程质量检验评定统一标准(GBJ300-88)等国家制订的施工及验收规范为质量评定验收标准。5.1 engineering with construction diagram paper, method elucidation, the design change with construct adornment engineering to start construction and check and accept norm (JGJ73-91), building install engineering quality the examination assess t

23、o unify standard (GBJ300-88)etc. nation establish of construction and acceptance the norm assess acceptance for the quality standard.52本工程质量应达到国家质量评定合格标准。甲方要求部分或全部工程项目达到优良标准时,应向乙方支付由此增加的费用。5.2 engineering qualities should attain national quality to assess qualified standard.When the first party requ

24、ested part of or all engineering items to attain good standard, the expenses shoulded pay to increase from here toward the second party.53甲、乙双方应及时办理隐蔽工程和中间工程的检查与验收手续。甲方不按时参加隐蔽工程和中间工程验收,乙方可自行验收,甲方应予承认。若甲方要求复验时,乙方应按要求办理复验。若复验合格,甲方应承担复验费用,由此造成停工,工期顺延;若复验不合格,其复验及返工费用由乙方承担,但工期也予顺延。5.3 A, B both parties s

25、hould carry out concealment engineering in time and in the center engineering of check and check and accept a procedure.The first party doesnt attend concealment engineering on time and in the center the engineering check and accept, the second party can check and accept by oneself, the first party

26、should to acknowledgement.If the first party request while replying to check, the second party should press to request to carry out to reply to check.If reply to check qualified, the first party promises a load to reply to check expenses,resulting in from here lockout, the work period postponeds;If

27、reply to check unqualified, it replies to check and return work expenses is undertaken by the second party, but the work expect to be also to postponed.54由于甲方提供的材料、设备质量不合格而影响工程质量,其返工费用由甲方承担,工期顺延。5.4 because the first party provides of the material, equipments quality is unqualified but influence eng

28、ineering quality, its returning work expenses is undertaken by the first party, the work period postponeds.55由于乙方原因造成质量事故,其返工费用由乙方承担,工期不顺延。5.5 result in because of the second partys reason quality trouble, its returning work expenses is undertaken by the second party, the work expects not to postpon

29、ed.56工程竣工后,乙方应通知甲方验收,甲方自接到验收通知 日内组织验收,并办理验收、移交手续。如甲方在规定时间内未能组织验收,需及时通知乙方,另定验收日期。但甲方应承认竣工日期,并承担乙方的看管费用和相关费用。5. 6 engineerings finish construction, the second party should notify the first party checks and accepts, the first party from receive the notice of acceptance The organization in the day check

30、s and accepts, and carry out acceptance and hand over a procedure.Can not organize acceptance in the provision time such as the first party, need to notify the second party in time, another settle acceptance date.But the first party promise to recognize to finish construction date, and undertake the

31、 second party to put in the custody of expenses with related expenses.第6条 关于工程价款及结算的约定Article 6 engagement concerning the engineering payment and the balance of accounts61双方商定本合同价款采用第 种;6.1 both parties agree after negotiation a this contract payment adoption grow(1)固定价格。(1)Fix price.(2)固定价格加 %包干风险系

32、数计算。包干风险包括 内容。(2)Fixing the price adds %Wrap the stem risk coefficient a calculation.Wrapping the stem risk includes Contents.(3)可调价格,按照国家有关工程计价规定计算造价,并按有关规定进行调整和竣工结算。(3)Adjustable price, account a price provisions calculation to build price according to relevant engineering in the nation, and press

33、 to carry on adjusting and finish construction balance of accounts concerning the provision.62本合同生效后,甲方分 次。按下表约定支付工程款,尾款竣工结算时一次结清。6. 2 contracts take effect, the first partys cent Time.The engagement of pressing the form pays an engineering style, a close account for tail style to finish constructio

34、n balance of accounts.拨款分 次进行The cent of the appropriation The time carries on拨款 %Appropriation%金 额Gold Sum63工程竣工验收后,乙方提出工程结算并将有关资料移交甲方。甲方自接到上述资料理 天内审查完毕,到期未提出异议,视为同意。并在 天内,结清尾款。6. 3 engineerings finish construction acceptance, the second party puts forward engineering balance of accounts and will h

35、and over the first party concerning the data.The first party from receive above-mentioned property cuisine Reviewing inside the day completes, expired and dont put forward objection, see as agree.Combine at Day inside, settle a tail style.第7条 关于材料供应的约定Article 7 the engagement of the concerning mater

36、ial supply71本工程甲方负责采购供应的材料、设备(见附表一),应符合设计要求的合格产品,并应按时供应到现场。凡约定的由乙方提货的,甲方应将手续移交给乙方,由乙方承担运输费用。由甲方供应的材料、设备发生了质量问题或规格差异,对工程造成损失,责任由甲方承担。甲方供应的材料,经乙方验收后,由乙方负责保管,甲方应支付材料价值 %保管费,由于乙方保管不当造成损失,由乙方负责赔偿。7.1 engineering the first parties are responsible for the material, equipments(see attach table a) which buys

37、 a supply, should meet the qualified product ofwith designrequest, and should supply the spot on time.Any engagement of is lifted goods by the second party, the first party should hand over the procedure to the second party, is undertaken a conveyance expenses by the second party.The material, equip

38、ments supplied by the first party took place quality problem or specification difference, bringing loss to engineering, the responsibility is undertaken by the first party.The material that the first party supplies, after the second party checking and accepting the second party is responsible of pre

39、servation, the first party should pay material value %,Storage fee, because the second party takes care of not appropriate result in loss, the second party is responsible of indemnification72凡由乙方采购的材料、设备,如不符合质量要求或规格有差异,应禁止使用。若已使用,对工程造成的损失由乙方负责。7.2 any material, equipments which is bought by the seco

40、nd parties, if not agree with to match quality request or specification contain difference, should forbid an usage.If have already used, to the engineering result in of the second party is responsible for loss.第8条 有关安全生产和防火的约定The Article 8 relevant safety produces and fires prevention of engagement8

41、1甲方提供的施工图纸或作法说明,应符合中华人民共和国的消防条例和有关防火设计规范。8.1 first parties provide of construction diagram paper or method explain, should match the fire fight regulation of the Peoples Republic of China with the relevant fire prevention design norm.82乙方在施工期间应严格遵守建筑安装工程安全技术规程、建筑安装工人安全操作规程、中华人民共和国的消防条例和其它相关的法规、规范。8.

42、2 second parties should obey strictly during the period of starting construction building install engineering safe technique rules distance , building Anne the worker is safe to operate a rules distance , the fire fight regulation of the Peoples Republic of China with other related laws, norms.83由于甲

43、方确认的图纸或作法说明,违反有关安全操作规程、消防条例和防火设计规范,导致发生安全或火灾事故,甲方应承担由此产生一切经济损失。8.3 because the first party confirms of diagram paper or method explain, breaching to operate rules distance, fire fight regulation and fire prevention to design norm concerning the safety, causing occurrence safety or a fire trouble, th

44、e first party promises a load to produce the whole economy loss from here.84由于乙方在施工生产过程中违反有关安全操作规程、消防条例,导致发生安全或火灾事故,乙方应承担由此引发的一切经济损失。8.4 breach concerning the rules distance, fire fight regulation of the safety operation in the construction the production line because of the second party, cause occu

45、rrence safety or a fire trouble, the second party promises a load of whole economy loss which causes from here.第9条 奖励和违约责任The 9th reward and default responsibility91由于甲方原因导致延期开工或中途停工,甲方应补偿乙方因停工、窝工所造成的损失、每停工或窝工一天,甲方支付乙方 元。甲方不按合同的约定拨付款,每拖期一天,按付款额的 %支付滞纳金。9.1 because the first partys reason causes the

46、holdover start work or ceases work midway, the first party should compensate the second party because of cease work, the loss resulted in by nest work, cease work each time or nest work a day, the first party pays the second party Dollar.The first party doesnt press the engagement of contract to app

47、ropriate a payment, dragging along to expect for a day each time, pressing payment a sum % Payment fine for delayed payment92由于乙方原因,逾期竣工,每逾期一天,乙方支付甲方 元违约金。甲方要求提前竣工,除支付赶工措施费外,每提前一天,甲方支付乙方 元,作为奖励。9.2 because of the second partys reason, overdue finish construction, exceed the time limit for a day each time, the second party pays the first party Dollar penalty fee.

展开阅读全文
部分上传会员的收益排行 01、路***(¥15400+),02、曲****(¥15300+),
03、wei****016(¥13200+),04、大***流(¥12600+),
05、Fis****915(¥4200+),06、h****i(¥4100+),
07、Q**(¥3400+),08、自******点(¥2400+),
09、h*****x(¥1400+),10、c****e(¥1100+),
11、be*****ha(¥800+),12、13********8(¥800+)。
相似文档                                   自信AI助手自信AI助手
百度文库年卡

猜你喜欢                                   自信AI导航自信AI导航
搜索标签

当前位置:首页 > 应用文书 > 合同范本

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服