1、xxxxx projectStation Time ChartRevisionDOCUMENT NO.xxx lineSHEETS (PAGE)of Cycle Time=xx sec.(xxJPH)Sheet:1OP.OperatorCycle DescriptionSpotsSealingTime secCycle Time:xxsecBeginDurationEndStation No.OP010 LoadingOP010Rob1Unload 1 C/M from APC 1088Unload rear rail LH from APC 281018Unload rear rail LH
2、 from APC 3181230move to GEO fixture30232Load parts onto fixture32840Change gripper40040Operator1walk to rack SAG0.011take 2 part1.067Move to APC7.018load parts8.0816Operator1/2walk to rack S/M16.0319take 1 part by hoist19.01029move to APC29.0332load parts32.0436push button36.0238Sealing lengthSpot QTY80706050403020100