1、专业能源人才求挑战性工作英文的简历 SUMMARY OF QUALIFICATIONS: Structural design and construction of nuclear facilities at DOE Los Alamos National Laboratory. Analysis and design of special equipment and facilities for recovery of spent nuclear fuel elements at DOE Hanford Site. Structural design of Pit 9 recovery bu

2、ilding for DOE Idaho National Engineering & Environmental Laboratory. Structural/seismic design of diesel generator building for upgrade of process canyons at DOE Savannah River Site. Experienced and knowledgeable of code requirements and standards for steel, concrete and masonry structures. OBJECTI

3、VE: Practice as a professional engineer with an organization that offers challenging projects to work on, provides a climate of fairness for employees and pays a fair wage. WORK EXPERIENCE: For each of the following assignments I served as the licensed Engineer of Record. Neutron Tube Target Loading

4、 Project, Los Alamos National Laboratory, 1995-1997 Designed and supervised design and drafting for new tritium facility including reinforced masonry shear wall building, modification and upgrade of an existing reinforced concrete building and foundation for a new steel building. Conducted seismic l

5、ateral load analysis for entire facility. Wrote design criteria and prepared construction specifications and drawings. Developed structural test and inspection plans and integrated structural design with electrical, mechanical and architectural disciplines. Reviewed and approved vendor submittals, m

6、anaged construction documents, supported change control process and prepared as-built project records. K-Basin Spent Nuclear Fuel Project, Hanford Site, 1997-1998 Conducted structural analysis and design for the Cold Vacuum Drying System and the Hot Conditioning Facility. Conducted seismic analysis

7、of the 25 ton Hot Conditioning System process steel enclosure. Pit 9 Remediation Project, Idaho National Engineering & Environmental Laboratory Site, 1996-1997 Designed a large retrofit peration in an existing concrete partition wall in the facility. Performed seismic dynamic analysis to demonstrate

8、 concept feasibility. Prepared detailed engineering sketches for input to drafting construction drawings. Conducted structural analysis and design of steel frame and concrete deck mezzanine floor for the shredder/separator cell. Designed and supervised drafting of main steel construction drawings fo

9、r the Pit 9 retrieval building. This unique structure spans Pit 9 and moves along skid beams on Hillman rollers. An open bottom provides aess for waste retrieval equipment in the building. Canyons Upgrade Project, Savannah River Site, 1997-1998 Developed structural design criteria, building structur

10、al concept and supervised static/seismic analysis, design and drafting for construction drawings for the reinforced concrete shear wall building housing the diesel/electric generator power system. Typical Project Support Experience at Los Alamos National Laboratory, 1998-xx Conducted seismic analysi

11、s of the nitric acid tank farm expansion for Building PF-4 in TA-55. Designed structure for tanks and piping support and anchorage. Performed evaluation of Building TA-53-0006 (3-story reinforced masonry office building) and Building TA-21-1001 (unreinforced masonry one-story records storage warehou

12、se) to requirements of FEMA-178. Remended seismic upgrades for both structures and designed roof support repair for the records storage warehouse. Conducted conceptual and detailed design of a Weapons Engineering Tritium Facility upgrade for rack storage of tritium canisters in Building TA-16-205A,

13、including fabrication drawings and specification, and seismic analysis of the bined storage racks and existing on-grade reinforced concrete floor slab. Designed a high-seismic performance storage vault for the Beryllium Technology Facility including seismic analysis, drilled pier foundation, reinforced masonry shear walls and light concrete filled steel deck roof. EDUCATION & CERTIFICATION: BSME Northwestern University GPA 3.8/4.0 Tau Beta Pi, Pi Tau Sigma MS Structural Engineering Purdue University GPA 6.0/6.0 Sigma Xi Ph.D. Aeronautics/Astronautics Stanford 1 2 下一页 上一页 1 2 模板,内容仅供参考

展开阅读全文
相似文档                                   自信AI助手自信AI助手
猜你喜欢                                   自信AI导航自信AI导航
搜索标签

当前位置:首页 > 应用文书 > 办公模板

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服