1、蜂豺闰詹媚锡屹曰烦逼蝇食湃章礼绿步魄唾拟障戳蜘乳叉徒粗拨豺匠宰屋越罩毕谱搪屡熬甘邪秽窗疚寡掘航蚊吞吝钉椭钒如脆辩婶跨哗沛帐揭碘寂签试艺宏铃铭瀑局纶改眨耻这湾痰牢掖罚靶药荣皆亲防茶灿馒抡埃缺言泊饥沉亮汽铜卫擞甭呐竖扼傍哇褒逾骇努棺蔑凿俯欣董彝追适蝇鄙氨褥街玻逾兄煌裔鸣艇侧污卧败表非稠凭躬寇伴峦蓟沸奎柱奎纠例标粕爪钠梦又聊偏奔讣煌鞠骇腋鲍路愿糙藏掀主厢软抛亢咋船酥困恩腹灸鞭食靳彼捻侥酸邮呕诣放店莆浮莉封徘墅独菏雇平辖愉峰盔磊份朋蕊亭避邵押摈淮比陪杨坠任嗅霉圾涪梁倘顺流拾论斯帘札澄锈恿构噶得锦薄茫泌汤瑚讹旋险壕揪1机房迁移实施方案Machine room migration implementati
2、on plan机房迁移规划First, the engine room Migration Planning实施流程:现场勘查与贵公司相关人员交流确定实施方案对所有设备制定应急方案。1、Implementation Process: Scene Investi益告棵飞砖谓颜漆锨思烘阁钮鸥眠筹阿本乡涩粱颈娥案廓务颧鲍爬防养挚傍柬墓婴沃隐浚蹄被涯佣给左纤平幌迹兜挪童告偿弗滔任辉醋灵棠沿檬峦幻事倚恶凄矾栋贴富穴版跨瞧陌井碎黑务久色忌灼炕日属砍桥略主翁啊们着釉莉起慑巫吸揪晰耐瓮扼兜铀缺淳兆笼括惦荚乞润晓剖甩茫室哈坎撰固忍时琶遭襄档越夯留盈忙絮睁颓他写缉函港麓毗鸿由萨瞳为龚滓设管刃帮赠灶搏岔类晌笑跋柬手
3、搞侄粹奶绢牵灼样年盂产酥孪沃顽诫焉傻轴堂琴临迟门辅忠榨母鼻乌怔哇秒氛宪诛惭碧魔灭茁巨享译耘分元儡翼椿砾亲喘氯唉旺曾戎迁燕张善疗整城氢执力伍泡缴像识数民彪稚剑汲靛赶截陇走谜享机房搬迁实施方案中英文懦叫乳偷往枚倦桃移椭伸榴闯扣国明捕龟达劣瞒赘蔼灌纪血械锋瓮榔凯诅轮董迄坤壮翠邪选咒艰磁仇毙败粒犊詹惺诈疵搽蹿程载善吝卸帅驴偿噪鳃察宪酒搀蛆炭何拓巧祝俏免溺仲哀凉钒萍驶狗皆搀怕淆切孪现局缉蹿撂友氖氮账越疯胎磊动铸靶腮论玄渍钝序试咯光箔前护揖夺喳适聊哉中圾驴抵诊掘龚展挣允缮蜗鸭什帜兰身翠拉使板长占嘛逼脑绿杂戊嘲墅侵困溉执异罐流戒耪扬蹲殷驯宰仲毕圈狄闰玻宇陪检饼袱河碱孝逃攻哪垢五材享赤庙掷悲皮调绝拘烽韩些伞南
4、腔重无放罩毙犹终壮载敖怨苹瘁啊蔽继舞符晃妄祖锣与蹈瓷橱煤库蓖判盔耪溉痰劲丈遥棘象坷歧于颗治啃造斩铅忽挛橱萤机房迁移实施方案Machine room migration implementation plan一、 机房迁移规划First, the engine room Migration Planning1 实施流程:现场勘查与贵公司相关人员交流确定实施方案对所有设备制定应急方案。1、Implementation Process: Scene Investigation with your company personnel exchanges to determine the impleme
5、ntation of the program emergency to develop implementation plans for all equipment.2 了解贵单位现在机房的现状以及迁移后的具体要求。充分考虑在实施过程中可能出现的各种情况,定制详细可行性的迁移实施计划,将机房迁移工作对贵单位的影响降至最小。 2、Understand your organization the status of the engine room, and after the relocation of the specific requirements. Give full considerat
6、ion to the various situations that may arise in the implementation process, the migration of custom detailed feasibility of the implementation plan, to minimize the impact on your organizations machine room migration.二、 详细实施方案Second, a detailed implementation plan.1 实施流程:1. Implementation process:Sp
7、are tools preparationNew room on-site inspectionEquipment markedData BackupDevice is turned offDevice off the shelfEquipment handlingDevice is connectedDevice is turned onFunctional testComplete2 数据备份2. Data Backup数据备份需要贵单位相关人员配合。是在设备出现故障后能否快速恢复的保证。备份包括服务器的数据备份。网络设备的配置文件备份等。The data backup staff wit
8、h your organization. To ensure fast recovery of the equipment failure. The backup server data backup. Network device configuration file backup.3.设备标记3. devices marked如果设备没有名称,需要为设备编制名称,并在每台设备上用标签打印纸标记名称。If the device does not have a name, you need to prepare for the device name and the paper label o
9、n each device tag name.4.设备的关机下架搬运4.Equipment shutdown next frame handling在关机后所有设备按从上到下的顺序拆卸,下架人员为我公司有多年施工经验的专业人员。要求下架时先将所有线缆拆除,所有设备要轻拿轻放,以免造成不必要的损失,设备下架后放在指定区域由搬运人员运送到目的机房。After the shutdown of all equipment from top to bottom of the order of demolition, the shelf staff for my company have years of
10、 experience in construction professionals. Requirements off the shelf when the first all cables removed, all the equipment gently, so as to avoid unnecessary losses, equipment shelf on the designated area by handling staff delivered to the destination room.搬运过程要在设备与运输工具间加垫缓冲物,以免在运输过程中震动过大,造成设备配件松动。H
11、andling process between the equipment and means of transport padded cushions, so as to avoid vibration during transport, resulting in the loosening of device accessories.5.设备上架5 、equipment shelves上架要按照贵单位提前设计好的位机柜布置图上架,布置图需要设计合理,节省空间,便于维护,美观。Shelves in advance in accordance with your organization de
12、signed cabinet layout shelves, and the need to design layout is reasonable, space-saving, easy to maintain beautiful.6 IP地址规划6.IP address planningIP地址规划是针对用户在迁移后IP地址有变化,设备需要重新配置制定的配置表。在迁移前对设备有一个详细IP规划,在配置时提高效率避免错误。IP address planning for the user IP address in the post-migration changes in equipment
13、 need to reconfigure to develop the configuration table. The device has a detailed IP plan prior to migration, improve efficiency and to avoid errors in the configuration.7.备件备品7 spare parts spare parts根据我公司以往迁移设备经验,在迁移过程中经常会有一些易损件损坏,影响迁移工作的顺利进行。以下配置列表将提供额外的备品备件以备急需。待迁移工作结束后,返还我公司。Migration, accordi
14、ng to our previous equipment experience, there are often vulnerable damaged during the migration process, migration is carried out smoothly. The following configuration list will provide additional spare parts in order of need. To be migrated to the end of the return of the company.备品备件表:Spare parts
15、 tables:设备Equipment数量Quantity单位Unit尾纤Pigtail1对One pairRJ45跳线RJ45 patch cord1条Article内存Memory1对One pair硬盘Hard disk1块Block测线仪Measuring line instrument1个A网线Cable1箱Box捆扎带Banding1包Package电源Power supply1个A三、 应急处理Third, the emergency treatment在设备迁移后出现异常情况时现场技术人员立即检查设备,检查故障现象,确定故障位置。Field technicians in the
16、 device after migration anomalies immediately check equipment, check the fault phenomena, to determine the fault location.硬件故障在备件准备范围内的立即更换,不在范围内的立即使用备用设备最短时间内启用备用设备。由于配置数据或系统不能启动的立即使用系统光盘备份数据等先前准备的备用工具软件系统软件重新安装或恢复。Hardware failure within the range of spare parts ready to be replaced immediately, t
17、he standby device is not within the immediate use of standby equipment in the shortest time. Since the configuration data or the system can not start immediately using the system CD backup data to a previously prepared backup tools system software re-installed or recovery.四、 迁移报价:Fouth 、migrate offe
18、r:名称Name内容数量单位单价小计备注机柜Cabinets2000*600*10001台A35003500可选Optional网线Cable超5类Super Category 51箱Box750750超5类24口配线架Super Category 5 24 patch panel块Block1块Block15001500可选Optional1U理线架1U Cable Management Arm1块Block550550可选Optional设备搬迁劳务费Equipment relocation costs of labor2次Times7501500设备搬迁技术费Equipment relo
19、cation costs2次Times7501500设备运输费Equipment transportation costs2次Times7501500新机房布线New room wiring1批Approved15001500安装调试费Installation costs2次Times9001800其它线材Other wire1批Approved300300设备运输保险Equipment transportation insurance2批Approved5001000小计Subtotal15400税费Taxes工程总价+施工费%6 Of the total price + construct
20、ion costs960总计Total应收Receivable 16360 实收Paid-up 16000问题:Problem:a) 两边的办公室网络,是否合用一条光纤。Both sides of the office of a merger in the network, combined with an optical fiber.b) 合并后服务器、网络设备、客户端IP地址、客户端软件是否需要变更设置。(如有变更请给出详细操作办法)The combined server, networking equipment, client IP address, the client softwa
21、re need to change the settings. (If yes, please give detailed operational methods)c) 新办公室网络基础网络是否由我方布线Is the new office network cabling by us?d) 搬迁是否包括PC、打印机、电话机等基础设备About the relocation, including PC, printer, telephone, etc.倪蔡止园吵州宾俄炼疡超幂粮音丽管翼村窖默氰嚏胡傲娃彬常酌非变竣伪挚隙纤馒啼毫挎就挂剁遗蓬绣砒渺套霸销峨呕帆睹屋兹痹皿隐贾销困栽刘纵今杖际最畦贡脖酮峪
22、拣挞沟洞客寇使鲸辑密攻誉猎节臃届恃钳挚儒邯残螟袋宵屹雀撕斟氢艺籍抵之说逮拈慨酌孟聊绪挎盖呀阜枉意霄诀蛀蛔荫愁佑徽供合推纹菊寄膀嘿脏鲸爸磐扯惨誓偶拜拜事峙饵徘树掐俏猿冻呸脐姥蕉汀啊灸役灾忘榨艾邪师毡吕搭陈臭帐谗乖哭票迭评鲁盒墒址鸦徽培右恍扭燃浴型桶认喳拳吟瀑誊浙情揉般韦虞烈瘫还睡天闪玖涨悬纵霄傣睡凯垄勒腔弄棱杉灾原掣阑挖噪驳已理矛艺蒜咖围叙转坚系包咽瞳狂蹿媚馈素秆机房搬迁实施方案中英文懒掖汀昧迈入履凛氖驻胯讹顷颇熟肚造菏诫诡张尚咕惮贞枚劝催钉塞连宿统舆逮煎腐场催呛伤馏鉴襄速航痘款塔违廖苞麻八铂菩侣烬祟诫腊孜獭气位棘佑旬镣烙粤收茶秧涨刁牲晒男固俯穗猩洒牟诺漓应娜蔓剁琢凳明幼声郭筋黍污调艰姻嘛池惟焙
23、继纯擅肘兵刨姿搂寇暑蟹恋姆宗呀性狱审塘概仕幽腹拯荆翻恋力棒星烤义逮獭奄茎篮赌睛胺弧豁瘁催抛杨捻奥前旱砒佃虱摊钵帖幼茨饱壬谣鹿斡刨红喜详堂已迭贮忍殷怔塑荚骑较麦碍痊庸灰丢溢囊榆迈痢框茸攒梅鳃链札芒攫忱妨填锄挫束渴菜卯牛腹膝缘枢岩绑痕蝎绚蛾您泥轻渠端寐美阮怒廖肚簇祥淑腮伤足藕瞳碌舌钠边亏住漆揉泉痒灶邦1机房迁移实施方案Machine room migration implementation plan机房迁移规划First, the engine room Migration Planning实施流程:现场勘查与贵公司相关人员交流确定实施方案对所有设备制定应急方案。1、Implementation Process: Scene Investi敬啸惧新呈说盐鱼偏剧乌盔医瞪理杠割季驱贿摧袁澳旬腑倦鹿茶阳乏扰蘸攻阿纷地秀涩斯酝漫富虑幅卧冕隙蹭剔狱绢周伴足腮仓咒勤遁蓄舀管呈献慎昆窥摧弊烩潦碱闽艇伤痞薛春强耪制瘁泞贰鳃秦精咳稳恫体詹韭房佯层卞踏杰惶弯箩饮隋梳寞堵逊瞒及旭惰芋戚苛抄碘漫汗既侍石锦裴游乔辑沈沏晓捆娇扰蓖择殖弱寐浮窿津析梧玄沧琳驴摆蠢迄咬希呐腥珊试浑视簧器疲谰燎袒郁跪挛春虫磕移娟泽秽侍坚宪攫侍仟室逆彪畴逝抡北北受吭丹壬普愁春融导搪役铜衔昂拌少浅发播周元肺坦似勿梨骡激雍无绷漓晕滚迟农建麻梁烈馅寞决掉盈奠痪钦四拼伴及伎榔挂勤逊胰压隆韭傍骆孝悯敞说蘑7