收藏 分销(赏)

国外建筑工程分包合同英文版-附中文翻译.doc

上传人:精*** 文档编号:2301551 上传时间:2024-05-27 格式:DOC 页数:7 大小:47.51KB
下载 相关 举报
国外建筑工程分包合同英文版-附中文翻译.doc_第1页
第1页 / 共7页
国外建筑工程分包合同英文版-附中文翻译.doc_第2页
第2页 / 共7页
国外建筑工程分包合同英文版-附中文翻译.doc_第3页
第3页 / 共7页
国外建筑工程分包合同英文版-附中文翻译.doc_第4页
第4页 / 共7页
国外建筑工程分包合同英文版-附中文翻译.doc_第5页
第5页 / 共7页
点击查看更多>>
资源描述

1、 AGREEMENTFOR XXXXXXXXXXXXXXXXXXX BETWEEN AND THIS AGREEMENT is made onXX/XX/2011,by and between . (hereinafter called “The employer”) and _ Company Ltd. (hereinafter called “The contractor”).WHEREAS:1. The employer is desirous of carrying out the (hereinafter referred to as “The Works”)2. The contr

2、actor has agreed to execute the said work in strict compliance with the terms of this Agreement.NOW IT IS HEREBY AGREED AS FOLLOWS:1. Commencement: This Agreement shall commence on the date first above written.2. Location of work: The employers worksite in .3. Scope of work:The contractor shall unde

3、rtake the .4. Period of completion:The work shall be completed within a period of days from the date first above written as commencement date in this agreement.5. Contract sum:The total value of the contract shall be the sum of N _Naira only.6. Mode of payment: First installment:The employer shall p

4、ay to the contractor ninety five percent of the total price, i.e. Naira only upon completion of the work.Second installment: The employer shall pay to the contractor five percent of the difference of the total price, i.e._ Naira. only,two weeks later, after the work received has been proved qualifie

5、d.7.Penalty for default:In the event the contractor shall fail to complete the work in time owing to reasons that the contractor shall be held liable, the contractor shall pay a penalty for such default based on one out of a thousand of the total price for installation work per day , i.e._Naira,only

6、 for each day of such default.8.Increase or decrease of work:In case the employer has to amend,increase or decrease the working schedule, the corresponding increase or decrease of total price shall be evaluated according to the terms and conditions between the two Parties, Should the work be increas

7、ed, the Parties shall enter into an agreement for the unit price of additional items. Should any part of the completed work of any part of the materials transported to the site have to be abandoned owing to amendment made by the employer, The employer shall, after having received the work, pay for e

8、ach completed work or materials abandoned as per the unit price specified to the contractor.9.Supervision for progress and quantity:The supervision personnel appointed by the employer and its representative shall have the authority to supervise the progress and quantity of the work and give instruct

9、ion. The contractor shall perform correctly in accordance with such instruction given by the employers personnel or representative. If the work can not achieve the quantity standard from the client, the contractor must redo it without any extra payment and the contractor have to finish the work with

10、in the period of the completion.10.Stopage work:Should the employer notify the contractor to stop the work for reasons beyond the responsibility of the contractor, the contractor can stop the work and claim from the employer the price of finished work, materials at site and other reasonable expenses

11、 to be added or deducted from the paid installments.11.Custody of work:The completed work and the materials, tools, and equipment at site shall be under the custody of the contractor after commencement and before completion and delivery of the work. Unless in the event of Force Majeure, the contract

12、or shall be fully responsible for any damage of the work under the custody of the contractor. In case of Force Majeure, the contractor shall give a list of damage according to the actual condition and suggest an expected price and date for recovery from such damage to the employer for checking and p

13、ayment. Should the employer decide not to continue with the work, this contract shall be terminated according to article 10 hereof.12. Warranty for work.The contractor shall warrant the promised condition of the work within _ year(s) after the date of receiving the work by the employer. However, the

14、 contractor shall not be liable to Acts of God or misuse of the work by the employer.13.Supplemental provisions:The contractor shall be held responsible if the contractors personnel or other people are injured due to the negligence of the contractor during the progress of construction. 14.Attachment

15、s :Attachments shall become an integral part of this Agreement and shall be as effective as any other provisions. Attachments include: (1)Quotation.(2)Drawing15.Format of this Agreement:The Agreement shall be in duplicate with two texts to be held separately by the Parties hereof. Each of the Partie

16、s shall also keep two copies of the contract for record.16.Additional Provision : This contract has been executed by the Parties as of the day and year first above written.The employer: CGC NIGERIA LIMITED The contractor:_by:_ by:_Date:_ Date:_中文翻译本合同于_年_月_日,_(简称甲方)与_(简称乙方)签订。1.甲方将XXXXX工程发包。2.乙方已同意进

17、行此分包工程并严格执行以下合同条款。以下为合同条款:1合同生效时间:_。(具体根据分包内容确定)2工程地点:甲方_。3工程范围:(具体根据分包内容确定)4完工期限: (具体根据分包内容确定)5安装工程总价格:_奈拉整。6安装工程付款进度:(具体根据分包内容确定)第一期:甲方在本合同开始实施时,付给乙方工程总价xx%,即_奈拉整。第二期:甲方在xxx时,付给乙方工程总价xx%,即_奈拉整;7违约罚款:(具体根据分包内容确定)因乙方原因未准时完工时,应由乙方负责,应付违约罚款,每天按总价的1%计算,即_奈拉整。8增加或减少工程:若甲方需修改、增加或减少其工程计划时,总价之增减,应按双方规定之订单计

18、算。若需新增加工程量,双方应另行协商该项新增加工程之单价。若甲方因修改原计划而将已完工部分工程或已运抵工地之材料弃置,甲方在验收后,应按双方规定的单价对乙方已完成的工程费用及材料费,予以支付。9监督进度与质量:甲方派去的监督人员或代表对工程进度和质量予以监督并有权予以监工、指导。乙方应按甲方人员或代表的指示正确施工,不得以任何借口置之不理。若因乙方施工质量不能达到甲方质量标准时,乙方须返工,由此而产生的额外费用将由乙方承担;同时乙方仍须在合同规定的时间内完成工程。10工程停工:若甲方通知乙方将工程停止,其原因又并非是乙方的责任,乙方可停止工程并要求甲方按照已完成工程的数量、运抵工地的材料及其他

19、合理费用。在已交款中增付或扣除。11工程监护:在工程开始后,但在完工移交前,已完工的工程及留在工地的材料、工具、设备等,均由乙方保管。除人力不能抵抗的灾害外,乙方应对保管中的一切,负损害之全责。如遇不可抵抗的天灾人祸,乙方应详列损害实情,向甲方提出恢复原状的价格及日期。以供甲方核对付款之用。若甲方决定不再继续施工,按合同第10条规定结束。12工程保险:(具体根据分包内容确定)除天灾或因甲方使用不当的原因外,乙方应在甲方验收后保证工程质量良好_年。13附加条款:在工程进行中,若因乙方的过错,使乙方或其他人员受到伤害,乙方应负责赔偿。乙方须遵守甲方的现场施工管理条例,若违反,则按照甲方制定的现场施工管理条例进行相应处罚。14附件:(具体根据分包内容确定)本合同附件应视为本合同的一部分,与其他条款有同等效力。附件包括:(1)图样;(2)估价单。15合同形式:本合同一式两份,甲乙双方各执一份。另各保留两份副本供双方存档备查。16附加条款:(具体根据分包内容确定)本合同按双方所签日期生效。甲方(盖章):_ 乙方(盖章):_法定代表人(签字):_ 法定代表人(签字):_年_月_日 _年_月_日7

展开阅读全文
部分上传会员的收益排行 01、路***(¥15400+),02、曲****(¥15300+),
03、wei****016(¥13200+),04、大***流(¥12600+),
05、Fis****915(¥4200+),06、h****i(¥4100+),
07、Q**(¥3400+),08、自******点(¥2400+),
09、h*****x(¥1400+),10、c****e(¥1100+),
11、be*****ha(¥800+),12、13********8(¥800+)。
相似文档                                   自信AI助手自信AI助手
搜索标签

当前位置:首页 > 应用文书 > 合同范本

移动网页_全站_页脚广告1

关于我们      便捷服务       自信AI       AI导航        获赠5币

©2010-2024 宁波自信网络信息技术有限公司  版权所有

客服电话:4008-655-100  投诉/维权电话:4009-655-100

gongan.png浙公网安备33021202000488号   

icp.png浙ICP备2021020529号-1  |  浙B2-20240490  

关注我们 :gzh.png    weibo.png    LOFTER.png 

客服