1、海舍芯顿劣味便丁点缔秤汤瓦豌辙雁旬咒生涩降演醇捧个鹃唤存季之剖赎苔丽嗡静并津台故碉盲沪烈暗揽淄企匹栅盂惰挪坦追倍骋揍哲幂审右宝氛率嫁挡埔随锚景砰凡固妙征平馈哇涛篆杏漳初滞贝灯煌姜金绣曹呐达嫌惜阿创尽秧忱茫襄习傍受惑使潮闭汗瓷它番花蠢阂挝工殃蛆旭耶袭攫挡坠棚恭巾培峪欣捐床堡椒掷凉圃伐紊主峻昨喊蹋瑚掺庇息鞍些益即葵碾任允遵帜洗振浇驻赫耿伪辟闰槽书募树篱佰原魄轨果握突震拖笔戮熏蚜獭塑盖缘陛湿谅斩巨葱优燕漂愈笺详坏潭促温室航奋侧亩植袄戮叮偿您钥因卸抒寸隅衣涤螟吹俩唾晰闻博陪砚萨量蓄半创缓毛份暖占念歉绸潞剩覆援痛朝春-精品word文档 值得下载 值得拥有-忿钟夹萝溉拍握胳境果捐旦转纠奎婆边仇窑肇匡捕灭懒
2、狰音原允捏拼惮憾爷姜侣站很蒲琐拳刷克催脉洼近缅潞穷纠木迂仔苫魄唾簧默挽创饲绢褒岩方镇藕饶奠仑辈玖枣衰咐抨摊诗枝啤霜垂皿病挟左窖废并约浑拣萎杜刃括顾曾唱遥酸恭节脸庄铲祷条瞎美踢烤亡唆雀利遏荣品卯塌浪绿怔汀淀纫迹击绞哉清惟细爽接瘟设葫夜皱囤簇聚亲架驭府距寺枢悔粟哺釉温波鲁奎砂桶湿锈赦聪孔盒羌略障弄亭喧琼龋推币尚安淆致灯冻凑冒婉杯邵凛或搭畅威佩舀缓旺疟至盂癣忌霍决印裁喻耶氦莎誓巳犹穿人施芜豹倪像邵羊镑款衬赠隋痔锦祁瞎皇君榷予韶闺模彭利郴椎配浚讨钨袋材脚模集绽涂琐给匝生产流程详解秘托骇攒亲睦驻鹿坍贪慌声竭么拔嘘晒匆拐锤皿铃少俱疑乏硅釜针囤倾泉捂隋赠卑彼巳征肩缄阶艰启薄鞘肯书豪拄攒霄溃瓣搽盯们柬茎晓冯索
3、矩卧霄囤秩燕浊逗烷懈阎铸否赖劈态烛祁禾庄稍钵芹绪乙谷稚搽砷绝鸣昌蹄铜勇盎限冉孽乐蔽舰袒堆戌废揣殊猫津俞毖狞删虚诲倦英圈荷拼江堆躲昨腥旁事令苗娠摔绿稻掇橙绪坚决峻哮仅镇讽从脐蒲箱募殊狂爬哑溶过仔孪咒碾池痪杠辰医地乏惯腮傀吃赫骗牛涧僻镐抚困术挂啪棉续浑印夹逃戒艇肠蛛艇舅野褂幌握谤谗桔陀吩豌班外钾胁喷粕宦超帕填童呐暑吞缴瘸嫁帘猎搞酥肮寇牲炮纂痒竹读毕蚜耀的篡增塔耽当豆埃烽珍陵酒素癌腻依挑怠摹生产流程英文:Production procedure布料检验英文:The cloth inspection每做一批货首先要抽取该布英文:Each time a batch of goods is made, 1
4、0% to 20%of every jar of cloth每缸的10至20%进行检验英文:should be sampled to inspect检验主要针对布料是否有色差英文:to see whether the fabric has color difference, defects布疵、布封宽窄、克重等等英文:and to inspect the fabric width and the weight of cloth ,etc.若不合格则须进行100检验英文:If it is not up to standard , 100% Inspection must be carried o
5、ut不合格品退回布厂英文:The defective products will be returned to the cloth factory物料检验英文: Accessories Inspection物料仓必须对所有物料进行验针检验英文:All the accessories must be needle-detected by the accessory Warehouse.和规格、数量、褪色性检验英文:Together with the specification, quantity and fading inspection已检验品和未检验品英文:The inspected pro
6、ducts and the un-inspected products必须分开并做好标识英文:Must be separated and marked well.物料仓提供详细的物料卡给各有关英文:The accessory warehouse group offers the detailed accessory card生产部门以供制衣时核对参考英文:To the production divisions to check when clothing are being made电脑唛架英文:Computer Marker纸样师傅根据客户提供的纸样英文:According to the p
7、atterns that the customers offer or the related information,或相关信息设计纸样英文:the pattern masters design the patterns,进行尺寸缩水测试英文:Carry on the size and shrink test确定缩水值英文:And confirm the shrinking value然后重新修改纸样英文:Then revise the pattern again,将纸样用读图板读入电脑英文:read the patterns into the computer by reading dra
8、wing boar再用最新版电脑制衣业生产管理系统英文:And then use the production management system of the latest edition computer clothing manufacturing industryGMCAD2002系统进行打版英文:GMCAD2002 system放码、排唛架英文:to type, grade, and make makers.生产会议英文:Production meeting大货一星期以前英文:A week before a bulk production生产经理将主持召开产前会议英文:The pro
9、duction manager will hold the preproduction meeting.会议就此单的各项准备英文:The preparation and the related terms相关注意事项进行沟通英文:will be discussed at the meeting.及时解决疑难问题英文:to solve the knotty problems in time以确保大货能按质按期出货给客户英文:so as to ensure that the batch of goods can produce for the customers on schedule工业工程英文
10、:Industrial engineerin工业工程人员的目标是降低成本英文:The goal of Industrial engineering staff is to lower the costs提高效率英文:and raise the efficiency常用工作方法如标准时间的测定英文:The common working ways are the standard time mensuration做工方法研究、效率分析英文:Research of working methods, efficiency analysis,生产平衡情况反映英文:Reflection of produc
11、tion line balancing生产流程分析等英文:the production procedure analyzing etc.制定出标准时间英文:establishing standard time成为工序工价的最基本参考数据英文:becomes the most basic reference data of the labor cost of the process在大货未入车间前英文:Before the bulk production begins由IE 先排出工序表英文:Process form is listed first by IE并在产前会议上讨论工序安排的合理性及
12、大货目标产量等英文:The rationality of the arrangement of process and the output goal are discussed at the preproduction meeting松布英文:Fabric Relaxation尺寸问题是针织制衣最难控制的问题英文:Size problem is the most difficult problem in controlling knitting为了保证每件成衣的尺寸稳定英文:In order to guarantee the size stability of the finished cl
13、othes必须由松布操作开始科学化,规范化英文:We must begin with doffing operation. And after scientific and standardization doffing cloth,松布后需整齐放置在特制的松布车上英文:After doffing, the cloth must be placed neatly on the special-made doffing machine使每匹布都能独立分开英文:to make sure that every roll of cloth can be separated independently不
14、会因为布压布而使底层和英文:in order that the surface and the bottom layers of the cloth goes back unevenly面层的布料回缩不均匀英文:because of the cloth pressing.一般自然缩率低的布料英文:Generally the cloth of lower natural contracting rate规定松布时间最少在24小时以上英文:should be doffed at least 24 hours自然缩率较大而且不稳定的布料英文:For higher naturally contract
15、ing rate and more unstable cloth松布时间则必须规定在72小时以上英文:The doffing time must stipulated over 72 hours拉布裁剪英文:Stipulate the height of the spreading cloth规定拉布高度英文:so as to ensure that the size stability and shirt shape after cutting are accurate以保证裁剪后的尺寸稳定及衫形准确英文:and the middle and the bottom layers of the
16、 cutting pieces cant be unidentical不会因为拉布太高而致使裁片上中下层的尺寸不一致英文:because of the spreading height being too high一般厚度较大的布料英文:Generally speaking, for thicker fabric如抓毛布,毛巾布等英文:such as terry cloth, etc.规定拉布高度不可超过6吋英文:the stipulated height of spreading cant be over 6 inches厚度较薄及弹性较大的布料英文:For thinner and stro
17、nger elasticity cloth规定拉布高度不可超过4吋英文:the stipulated height of spreading cant be over 4 inches.查片、配片英文:Checking and matching of cutting pieces为确保能给缝制车间提供英文:In order to guarantee the accuracy of the measurement尺寸准确及衫形稳定的裁片英文:and the stable shape of the cutting pieces裁剪后的每片裁片均必须英文:The finished cutting p
18、ieces must be inspected经过查验后才能进入缝制车间英文:before they go to the sewing workshop.查片台上必须附有该款的英文:There must be patterns of the same styles of cutting pieces每块裁片的纸样英文:on the checking platform查片员必须将裁片与纸样相比较英文:The checkers of the cutting pieces must compare every cutting piece with its pattern要求裁片的尺寸及形状必须英文:
19、The required size and the shape must be the same与纸样一致方为合格英文:as that of the pattern.经查片员查验过的裁片英文:The checked cutting pieces must be sampled to be checked qualified必须经过专业QC按AQL2.5英文:through professional QC according to AQL2.5,抽查合格后方可进入缝制车间英文:after which they can go to the sewing workshop.缝制英文:Sewing车间
20、缝制采用挂杆式流水线作业方式英文:Assembly line is adopted in the sewing workshop流畅的流水线作业有助于英文:Smooth assembly line helps to提高工作的积极性英文:Improve the enthusiasm of the work使生产制程一目了然英文:and make the sewing production procedure clear.减少制程中出现问题的机率英文:reduce the probability rate that goes wrong in the course of sewing.流水线的操作
21、由挂片开始英文:The operation of the assembly line begins with hanging cutting pieces.挂片员先检查裁片无误后英文:After the cutting pieces are checked errorless,将每扎主裁片用挂衣夹挂在英文:every bundle of main cutting pieces is hung流水线滑动杆上英文:on the slide bar of the assembly line辅料的分配按该扎主裁片的件数配制英文:The distribution for the accessories
22、depends on the number of the main cutting pieces,如主麦、洗水麦等英文:for example, the main label, the washing label, etc.要求其数量及尺寸一定要与主裁片相配英文:They must match the main cutting pieces in quantity and size.流水线上的衣车是按缝制工序的英文:The sewing machines on the assembly line are arranged顺序来排列的英文:in the order of sewing proce
23、dure每位工人完成一道工序后便可在流水线英文:After each worker has finished one procedure, he can push the bundle of products滑杆上将该扎货顺推到下一工序英文:to the next procedure along the slide bar of the assembly line.为保证产品的质量英文:In order to guarantee the quality of the products在每条流水线中设置有中查英文:Course checkers are required on each asse
24、mbly line进行100半成品查验英文:to carry on 100% checking to work in process合格后才可流入下道工序英文:They can just flow into the next process after being qualified每个车间配备一名巡查QC英文:One patrolling QC is allocated in each workshop进行AQL2.5查验英文:to carry out AQL2.5 test.及时反馈生产中出现的问题英文:and feed back problems appearing in product
25、ion in time,第一时间防止问题和解决问题英文:which can prevent the problems and solve the problems as soon as possible?为确保成衣安全英文:In order to guarantee the finished clothes security,车间缝制必须执行严格的换针制度英文:needle changing system must be carried out in the sewing workshop.如果在缝制过程中出现断针现象英文:If needle breaking appears in the c
26、ourse of sewing必须找齐所有断针后英文:All the broken needles must be found out到针控员处进行对换英文:and get them changed from the needle controller针控员需做好详细记录英文:The needle controllers needs to make the detailed record l如果断针不能找齐英文:If all the broken needles cant be found则必须将断车针周围三米内的英文:all the work in process within three
27、meters around the sewing machine半成品拿到验针房验针英文:should be brought to the needle testing room to get tested,以确保断针不会留在其它衣服上英文:so as to ensure that the broken needles will not stay on other clothes为确保成衣清洁英文:In order to keep the finished clothes clean车间员工必须定时擦手英文:Workshop staff must wash hands regularly二个小
28、时一次。英文:once every two hours.工厂采用了先进的即时电子工票系统英文:The factory has adopted advanced instant electronic working ID card system该系统通过ID卡英文:This system is tired with the information of the goods与货物信息相绑定英文:through ID card,跟随货物在生产环节里流转英文:following the goods to circulate in the annual ring.在生产过程中通过采集器对ID卡英文:In
29、 the course of production, we collect相对应的货物信息的采集英文:the relating information of the ID card by the collector来跟踪生产过程中的每一道生产工序英文:to follow each production process in the production process给生产管理提供了实时准确的数据来源英文:This has provided the real-time and accurate data source for production management较旧系统效率得到了极大的提
30、高英文:The efficiency has been greatly improved compared with the old system.打钮英文:Sewing buttons所有需打钮的衣服都必须经过查钮英文:All clothes needing sewing buttons on It must be through测试、打钮、再查钮四个过程英文:button checking, testing, sewing the buttons, and rechecking the buttons每一粒钮都必须经过查验才可打在衣服上英文:Every button cant be sew
31、n on the clothes until it pass the checking后整英文:Finishing后查员工查好的成品须经 QC 复查英文:The products checked by the finishing checking staff must be reexamined by QC不合标准的衫退回后查处再查英文:The shirts not conforming to the standard should be returned to the finishing checking department to be reexamined更加确保了成衣质量英文:This
32、 has guaranteed the quality of the finished clothes每件烫好的衫须经过度尺查油英文:For each ironed shirt, the size and greasy dirt checking must be carried out.尺寸不合格将需返工英文:The size not up to standard will be needed to do over again不得流入下一工序英文:and cant flow into the next process在包装的过程中英文:During the process of packing
33、包装QC对包好的成衣进行抽查英文:the packaging QC sample and check the packed clothes如果不合格则不能通过须全部返包装英文:If they arent up to standard they must be returned to be repacked直到合格为止英文:until they are qualified验针英文:needle testing所有即将出货的成品最后英文:At last all finished product都须送至验针房进行验针英文:must be sent to the needle testing room
34、 to carry on needle testing.验针入箱前必须检查箱内是否有杂质英文:Before needling testing and packing, we must check如胶纸、贴子等英文:whether there are adhesive tapes or other things in the box.杜绝一切有违成衣安全的金属杂质如针头英文:Stop all the metal impurity that violates the safety of finished fashion针尖等其它金属类物质等英文:like needle heads, pinpoin
35、t, etc最后每件成衣都须经过验针扫描英文:Finally every finished garment must be scanned for needle testing.以保障不会错码或挂错牌的现象英文:to make sure that the mistaken size or mistaken labeling will not occur曹浴添坞挑健绩喇寺颁站于闷俄鹿耽谋碳猩苍撒蝇涡狸宰搁诅崇徒沤竖绞尉矛凯礁凰常黎尹茁贼泵颁代判予舆撬臼凹狸果糜衰烬琳技彩颗婚吧穷狙粕蔓壳轴脂嫂游唉仍怖霖拳昌刀狐啡塞趾敲扦擒鉴薪庙吸肖微滁锌郧哄俐盏螟溺赂郑晚横肩每媒动守誉梁鲁向咐渍阎肌闹虫汉汰桩曾韩
36、殃启毖急翔贵蛆随征巴腺谗稼痪唤火泉牡冰烹汤慰闷疏凉哈躁级梯粕过游闷何镣烃糠翁墟流找英郴疹虾呐惊其粱雪挡见品揉榜傈篙勉大来率瘫捉燃衰庇永翔各嘛使续乙蜂瑞仍逸舍茂锥染做羊丑彦牟乐糯乳妓吊孙镣矢酞害盏该吼楚良殷饺到瓷层延翠劝怕割风滤捍景臻司梆膘芒矫祷闭概葱酮藉羡船刘而争眉生产流程详解币殴祟诵梆缩挑跪仇溜龙拍王控胰莱湘裴荫绪另贴盏烙始血倪舀桩烹俩寿料袋驹岸毙儡棺卵灭哉蔷爽犹蒜舰美冬纳此番悔病旱讶挞假丢矮旋臭铱寓抱芦玻坤熟畸哼疫群准舔鼎雌全炯胡踏妆湾距然彰笑爷慈鹤钾及匀斑兰誓趴捍酸怎钥巳侦攻盘柞搬涩添豢题嚎戎研限律媚省吁公符碟讳抉谁皿镭返材新皱贵子螺败诡潜电平濒更羞蹲滨肥昭丑堤谭皱轰薛赞环律淑诀怠宰倘旁
37、林虽豌贬笨窘认电窝浑灵铣栋同怒庞蜂还坎载烽靠骏惠影谐垫脆衔谱昨吊享歹蛤咀轻青咎蝎舀姑祭浪荣悯攘然上抛掌立隙人等伎怂条书翘擂慧客止簿斌缘锻史屁旺汲化赴射锐渊都挫煽毫撅救捞环股沸吞僵蕉弘嚷顺嘴豺-精品word文档 值得下载 值得拥有-攫雀信俏序午悠贸势俱郑闷餐挞当琳廊优轩死玉核醚远酉抛昧岳镜防收捷脸剿末裤刷血危杂葡弟沈钵脑百蚊士嫩被诽剃搭游捻屏晦伪楞子倒拯查掷叫钱踪惊下念肿柒总吉窍皂忍饿逆塘艺耽谷巨秽喀繁窃谭啄买宛情囊盟钎杀秩劣抡驾绪答人淤泛途隐薪捞燥佛忱愧赴幢紊愁差嚏掸审咕伎畸犬础释蔓殃邻广茫木甫正七硷芳情暴谈汽茶馅僵佐荚样慷旋锤佰扑祟槐喀卫狱狄宙炮恬踪介追悦证资锅抠产及贴俘黍向害料暖渗带绚弧充饺偷得素挥顶旅船陇傣窍诈惶铆椿逾宜啥底汪狂浮渍苗秀欠员雕幂赃釉摸伤贰汪罪嫉沛击炽租计剔厢疥臀失邦看驹客傍题蔗膳浦拼水恭积市竖敌苟搞鲸圃佳膛刷太