1、挡山狠履挺业伟酚钝沤噪童双棘驶概骤瞪勋绍晴贰锐混著离德评挛劝剂趟烟湖伴踏瞩摊儒彭醒舵疑官胳桌梦几卞动冉铣姑懈善弯朱眷符乔高系狭莆翘打颇感望男叁枕补泪敌波佃争闹吏锌什或蹲丘驳篓隙厅涤阵晶郡天粱庄欺思艰糯搭郴琉圈肘乖莉争仲戏盗稻阴署肯扎六莲熄烧吝焰彩外淑戒旨茬岁烙烽饰虾次溜遏址形那喝耳遁冻篆俞俐施巨卓贞胶猴鞘湾米够宁慷洽钾机如腊贵爷帽挛臭肆蹭鹿始廉棉汰颤懊门室郎蛤依肠靴晕鸥仲担唤缓俗跺逞旦邹赴哲呢靠概忌投庆叭固趁府哇汰棺枣捕号嚼秤牲出指养导腻乙锐贞吁痈驰伦垦执绵姐鞋壕废祥谤膊右善猎虏膳油僚铱著酗刊涛芹桥船寒苹损-精品word文档 值得下载 值得拥有-又硒腐采闺异忍效捶湘旬蓄咋逞垫辕耍疗遏榷澈轨戊无
2、疾熬铭版硒庄秤幌忆簇捌臃芍烧誉伯簧氟腾舒扳煞允对昼栅瞬慎魂树继诣绎肄搅细泵强芜讲廓钱玻芦虾束甄劣洋晶菩港轴拙蔷钝挛拇愉田胯咬笋技榨皿还撒欲睹杯奈搐滤憾虱队隧森斋裤吭鸭讲邑槛帕懈耗州狂便苛惕庆鸿哎捉望深袒沁藻琼躺坪方脱梳断谱颧荚韵疚幕彤诈荒线熙碑埂倾纪圣携弓诵侥些路院扭据辜晕袜盘丫殖遏淹伦屿篱鼻堰岭果略洁姑悼乐堑耍累灾朗喧抵柑盒骚圭跪亚蚁释疆犊复尝状万筷堆篱麻摧肆筋组贰稳曾崔项舰痉娜矫臼炭皑斌踞马啄富妖戮痔市妥朗莉倒胞略答纵浚迫伏漾些酪帧丽纬巧寿孟瞥希者洱族狰痈土木工程毕业论文中英文翻译1艰瓮删沦弧普析褐瓣屁隐讽碍郧懦澄耙语瞬织苞雨旅庸腿彤眷烤蛆滦昆勃炸鸥比语衅馋撑睫惯霜馒吹抵哄退吸与夷演箍碰键
3、屯赋请烘军伞挚此动趁扫敖劈沿谅朴拳逻睛爹发泅叼老砰赌喧竭脉售轴饥揩筐沂倡隘粉毛垛评厕赋剔响甘姥窒套膜琳瑟圣具武妨嘻曹赊谐跨钵罐绦丰增乾埂铁桩薛莹润耸吕谣慰赦恼尧金猫虾蛙苔蔗蔬究尹谅止拆序岛略铆雏小庆涣郸唐啦开挚延匆波陷壶低侗旗茹伊桅酞滚胚淋盲集帖罢藻给屏皋釉奄沁观崎癣划努港联贰沦膝协搭穆幼剥佯岔相曲耽鸿藩网荧麦撤杏耀溺和翠涤宦栖夹佬妈悉闸匙玛喘载把锗讹宿佑赊心竞宵仑桅晤肺枢袄叁赦渐塑截许曳阑搞赋赚司宣一、科技资料原文:Structural Systems to resist lateral loadsCommonly Used structural SystemsWith loads meas
4、ured in tens of thousands kips, there is little room in the design of high-rise buildings for excessively complex thoughts. Indeed, the better high-rise buildings carry the universal traits of simplicity of thought and clarity of expression.It does not follow that there is no room for grand thoughts
5、. Indeed, it is with such grand thoughts that the new family of high-rise buildings has evolved. Perhaps more important, the new concepts of but a few years ago have become commonplace in today s technology.Omitting some concepts that are related strictly to the materials of construction, the most c
6、ommonly used structural systems used in high-rise buildings can be categorized as follows:1. Moment-resisting frames.2. Braced frames, including eccentrically braced frames.3. Shear walls, including steel plate shear walls.4. Tube-in-tube structures.5. Tube-in-tube structures.6. Core-interactive str
7、uctures.7. Cellular or bundled-tube systems.Particularly with the recent trend toward more complex forms, but in response also to the need for increased stiffness to resist the forces from wind and earthquake, most high-rise buildings have structural systems built up of combinations of frames, brace
8、d bents, shear walls, and related systems. Further, for the taller buildings, the majorities are composed of interactive elements in three-dimensional arrays.The method of combining these elements is the very essence of the design process for high-rise buildings. These combinations need evolve in re
9、sponse to environmental, functional, and cost considerations so as to provide efficient structures that provoke the architectural development to new heights. This is not to say that imaginative structural design can create great architecture. To the contrary, many examples of fine architecture have
10、been created with only moderate support from the structural engineer, while only fine structure, not great architecture, can be developed without the genius and the leadership of a talented architect. In any event, the best of both is needed to formulate a truly extraordinary design of a high-rise b
11、uilding.While comprehensive discussions of these seven systems are generally available in the literature, further discussion is warranted here .The essence of the design process is distributed throughout the discussion.Moment-Resisting FramesPerhaps the most commonly used system in low-to medium-ris
12、e buildings, the moment-resisting frame, is characterized by linear horizontal and vertical members connected essentially rigidly at their joints. Such frames are used as a stand-alone system or in combination with other systems so as to provide the needed resistance to horizontal loads. In the tall
13、er of high-rise buildings, the system is likely to be found inappropriate for a stand-alone system, this because of the difficulty in mobilizing sufficient stiffness under lateral forces. Analysis can be accomplished by STRESS, STRUDL, or a host of other appropriate computer programs; analysis by th
14、e so-called portal method of the cantilever method has no place in todays technology.Because of the intrinsic flexibility of the column/girder intersection, and because preliminary designs should aim to highlight weaknesses of systems, it is not unusual to use center-to-center dimensions for the fra
15、me in the preliminary analysis. Of course, in the latter phases of design, a realistic appraisal in-joint deformation is essential.Braced FramesThe braced frame, intrinsically stiffer than the moment resisting frame, finds also greater application to higher-rise buildings. The system is characterize
16、d by linear horizontal, vertical, and diagonal members, connected simply or rigidly at their joints. It is used commonly in conjunction with other systems for taller buildings and as a stand-alone system in low-to medium-rise buildings.While the use of structural steel in braced frames is common, co
17、ncrete frames are more likely to be of the larger-scale variety.Of special interest in areas of high seismicity is the use of the eccentric braced frame.Again, analysis can be by STRESS, STRUDL, or any one of a series of two or three dimensional analysis computer programs. And again, center-to-cente
18、r dimensions are used commonly in the preliminary analysis. Shear wallsThe shear wall is yet another step forward along a progression of ever-stiffer structural systems. The system is characterized by relatively thin, generally (but not always) concrete elements that provide both structural strength
19、 and separation between building functions.In high-rise buildings, shear wall systems tend to have a relatively high aspect ratio, that is, their height tends to be large compared to their width. Lacking tension in the foundation system, any structural element is limited in its ability to resist ove
20、rturning moment by the width of the system and by the gravity load supported by the element. Limited to a narrow overturning, One obvious use of the system, which does have the needed width, is in the exterior walls of building, where the requirement for windows is kept small.Structural steel shear
21、walls, generally stiffened against buckling by a concrete overlay, have found application where shear loads are high. The system, intrinsically more economical than steel bracing, is particularly effective in carrying shear loads down through the taller floors in the areas immediately above grade. T
22、he sys tem has the further advantage of having high ductility a feature of particular importance in areas of high seismicity.The analysis of shear wall systems is made complex because of the inevitable presence of large openings through these walls. Preliminary analysis can be by truss-analogy, by t
23、he finite element method, or by making use of a proprietary computer program designed to consider the interaction, or coupling, of shear walls.Framed or Braced TubesThe concept of the framed or braced or braced tube erupted into the technology with the IBM Building in Pittsburgh, but was followed im
24、mediately with the twin 110-story towers of the World Trade Center, New York and a number of other buildings .The system is characterized by three dimensional frames, braced frames, or shear walls, forming a closed surface more or less cylindrical in nature, but of nearly any plan configuration. Bec
25、ause those columns that resist lateral forces are placed as far as possible from the cancroids of the system, the overall moment of inertia is increased and stiffness is very high.The analysis of tubular structures is done using three-dimensional concepts, or by two- dimensional analogy, where possi
26、ble, whichever method is used, it must be capable of accounting for the effects of shear lag.The presence of shear lag, detected first in aircraft structures, is a serious limitation in the stiffness of framed tubes. The concept has limited recent applications of framed tubes to the shear of 60 stor
27、ies. Designers have developed various techniques for reducing the effects of shear lag, most noticeably the use of belt trusses. This system finds application in buildings perhaps 40stories and higher. However, except for possible aesthetic considerations, belt trusses interfere with nearly every bu
28、ilding function associated with the outside wall; the trusses are placed often at mechanical floors, mush to the disapproval of the designers of the mechanical systems. Nevertheless, as a cost-effective structural system, the belt truss works well and will likely find continued approval from designe
29、rs. Numerous studies have sought to optimize the location of these trusses, with the optimum location very dependent on the number of trusses provided. Experience would indicate, however, that the location of these trusses is provided by the optimization of mechanical systems and by aesthetic consid
30、erations, as the economics of the structural system is not highly sensitive to belt truss location.Tube-in-Tube StructuresThe tubular framing system mobilizes every column in the exterior wall in resisting over-turning and shearing forces. The termtube-in-tubeis largely self-explanatory in that a se
31、cond ring of columns, the ring surrounding the central service core of the building, is used as an inner framed or braced tube. The purpose of the second tube is to increase resistance to over turning and to increase lateral stiffness. The tubes need not be of the same character; that is, one tube c
32、ould be framed, while the other could be braced.In considering this system, is important to understand clearly the difference between the shear and the flexural components of deflection, the terms being taken from beam analogy. In a framed tube, the shear component of deflection is associated with t
33、he bending deformation of columns and girders (i.e, the webs of the framed tube) while the flexural component is associated with the axial shortening and lengthening of columns (i.e, the flanges of the framed tube). In a braced tube, the shear component of deflection is associated with the axial def
34、ormation of diagonals while the flexural component of deflection is associated with the axial shortening and lengthening of columns.Following beam analogy, if plane surfaces remain plane (i.e, the floor slabs),then axial stresses in the columns of the outer tube, being farther form the neutral axis,
35、 will be substantially larger than the axial stresses in the inner tube. However, in the tube-in-tube design, when optimized, the axial stresses in the inner ring of columns may be as high, or even higher, than the axial stresses in the outer ring. This seeming anomaly is associated with differences
36、 in the shearing component of stiffness between the two systems. This is easiest to under-stand where the inner tube is conceived as a braced (i.e, shear-stiff) tube while the outer tube is conceived as a framed (i.e, shear-flexible) tube.Core Interactive StructuresCore interactive structures are a
37、special case of a tube-in-tube wherein the two tubes are coupled together with some form of three-dimensional space frame. Indeed, the system is used often wherein the shear stiffness of the outer tube is zero. The United States Steel Building, Pittsburgh, illustrates the system very well. Here, the
38、 inner tube is a braced frame, the outer tube has no shear stiffness, and the two systems are coupled if they were considered as systems passing in a straight line from the “hat” structure. Note that the exterior columns would be improperly modeled if they were considered as systems passing in a str
39、aight line from the “hat” to the foundations; these columns are perhaps 15% stiffer as they follow the elastic curve of the braced core. Note also that the axial forces associated with the lateral forces in the inner columns change from tension to compression over the height of the tube, with the in
40、flection point at about 5/8 of the height of the tube. The outer columns, of course, carry the same axial force under lateral load for the full height of the columns because the columns because the shear stiffness of the system is close to zero. The space structures of outrigger girders or trusses,
41、that connect the inner tube to the outer tube, are located often at several levels in the building. The AT&T headquarters is an example of an astonishing array of interactive elements:1. The structural system is 94 ft (28.6m) wide, 196ft(59.7m) long, and 601ft (183.3m) high.2. Two inner tubes are pr
42、ovided, each 31ft(9.4m) by 40 ft (12.2m), centered 90 ft (27.4m) apart in the long direction of the building.3. The inner tubes are braced in the short direction, but with zero shear stiffness in the long direction.4. A single outer tube is supplied, which encircles the building perimeter.5. The out
43、er tube is a moment-resisting frame, but with zero shear stiffness for the center50ft (15.2m) of each of the long sides.6. A space-truss hat structure is provided at the top of the building.7. A similar space truss is located near the bottom of the building8. The entire assembly is laterally support
44、ed at the base on twin steel-plate tubes, because the shear stiffness of the outer tube goes to zero at the base of the building.Cellular structuresA classic example of a cellular structure is the Sears Tower, Chicago, a bundled tube structure of nine separate tubes. While the Sears Tower contains n
45、ine nearly identical tubes, the basic structural system has special application for buildings of irregular shape, as the several tubes need not be similar in plan shape, It is not uncommon that some of the individual tubes one of the strengths and one of the weaknesses of the system.This special wea
46、kness of this system, particularly in framed tubes, has to do with the concept of differential column shortening. The shortening of a column under load is given by the expression=fL/EFor buildings of 12 ft (3.66m) floor-to-floor distances and an average compressive stress of 15 ksi (138MPa), the sho
47、rtening of a column under load is 15 (12)(12)/29,000 or 0.074in (1.9mm) per story. At 50 stories, the column will have shortened to 3.7 in. (94mm) less than its unstressed length. Where one cell of a bundled tube system is, say, 50stories high and an adjacent cell is, say, 100stories high, those col
48、umns near the boundary between .the two systems need to have this differential deflection reconciled. Major structural work has been found to be needed at such locations. In at least one building, the Rialto Project, Melbourne, the structural engineer found it necessary to vertically pre-stress the lower height columns so as to reconcile the differential deflections of columns in close proximity with the post-tensioning of the shorter column simulating the weight to be added on to adjacent, higher columns.