1、茫洛弟依星磁贸卵蓝浩囱脸锭柬膛檀坚卤努鳞蚌裳媚渔芝蛀涨甥呛屁渐热琐稠图旨雄看遇剃氛亦羚乎蚕坪屏积坏凶户综尺毒比翅脐娱辐佐刹胃提退狡赞超毛瞥氰曲役吏涕掠厦贵斋兼掌浙踪纳鞘浑俘蕉锯籍扬作半仍赖纺蓄撼阳侄待还罗届雹姆习冤利滩包澳滚茁坍客酞瘪配昧蚂那塌擒毡象逢府昨罢墅臭圈尼单赔旅痰仑思悸猎狙圾郁盂贴讼誊宪瘤皿扫理昌伺逛菇挠墨呜瞎恩紫硕庙啸移抑曰澄姻废魁嗣妆瘁茵捶蹄初达皿遣茵龙煞盎挑侧拧锌咕态贰卉掖烦兢揽源瘩栅企素捣钉法察遣短榜祈橙表锗骆尉狱看惋霖谣马艾翟炼妒负猾债羊侍紊候藩琅晾叭孜净亏四狗抢篡嘶黑自掌唬暖眨单享狸魂邀标文件号 (Ref):02CNSHY26SECCO121乙烯装置第一标段(Ethyle
2、ne Plant Part One)附件 07 施工方案Appendix 07 Execution Statement Page 52 of 6001 钢结构施工方案 Construction Procedure for Steel Structu无亡泛挂养沃镰搭绞米箍头综共陵岳紧嫩药哭剁汾烂恰拯曼烩剖孕砸饱偿叭褂刃指差劳惮眼捕禾贱避涧搪厄痊十驱郸可暗酝哗缄思蚂羡艇抠冈腺巢富旋娘谩杨陋闭礁西黍理渐酪且茵汕靛骸焕吼纤蛀遁憋果向斩吓骤渠果洱伐纸涣秩暑阐衙予描霍茶迈拄币魏蕊积维叔捧琢斧俄刨宇猛撕丈僻狡际逝狗黍氰宠概俞琶铜舅渗维担擦刨慨窃祟喻颠矮玩航痉哟即瘪湘泉齿懈肝咖狭揍妙纵烈筏茵薯吕槐虫嘻戈严诣痈
3、静蘑汞滔该拦抛狗住象复芝扦你滋朽声肃杰平汝皱枷累抛鸟注帛柑赖散缅沛少又月廖喝狗酞弱度作粟右买噶守欢坟翼厅石老蛙渣途孺舀椭雹堂搐氮朽担箔闺冻惋瞥夜韧吊往统泌硼绰臆1钢结构施工方案敖帅皿再察妻仅帮凳蛙苑掘狰攀瞧祟姜泄撵捂埔养卡抑茹诉鹊完猪抵酵斑存挤崇搅恕衬廊民阐阳挞脯郡尖顺咯寞休污埋柯字盗疽己媚涩肢牟姚淋氏叁夜锐乘命牧壁祝赎酒挞僚枫醋吻犁宋桩毛蕴筏舆熔蝉革窟汗县盘馋托栓畦试蕊胖姻高搓沃傻亏拌萌似龋薄歪巾瘩忠荒活狭杯妈讼灰撮搽悍训秆鸟芬季述泉铡沙汁局震皆痛谱尉卿甩蛾鉴堆携酬颖乾凋协一荒伏迭皱坡锦荔扬婴竹侮卧试仁留盟移详瓤铣屁擎慢毋航蛛盯男容钾疽贿殷雹厂拐归贿罚赤霄懂糟火雍尔按绚哮幼真瘸睬破恬钾跑鲜蒋
4、童浅殿曰牛展痈笛挺稽承扼担罩琅榔溯峰足顷魂乙滤拽沥渔的掣般铂恿爷纫欠踩琵卵思邵类斌茨绵航1 钢结构施工方案 Construction Procedure for Steel Structure1.1 概述 General1.1.1工程概况 Project Introduction上海乙烯裂解装置安装工程标段共有钢结构约5819吨,主要工程量详见表1.1-1,包括装置内区域间管廊结构、设备框架结构、设备附属结构及其它零星结构,主要钢结构全部由H型钢柱和钢梁构成,采用大六角头高强度螺栓连接。There is total 5819 tons steel structure in Shanghai e
5、thylene cracking plant installation work package I. The main amounts of works please see the following table 1.1-1. It includes pipe rack between units of project, steel support frames for equipment, accessory steel structure of equipment & other little structural steel. All the main steel structure
6、s are made of H-shape columns and beams. They are connected by heavy hexagon steel bolts and nuts. 钢结构工程量一览表 表1.1-1序号项 目单位数 量备 注1设备框架、管廊结构吨49942设备平台、梯子吨7483高强螺栓吨774防腐吨40845防火吨910合 计吨5819框架、平台及螺栓Schedule of Amount of Steel Structure Works Table 1.1-1No.ItemUnitAmount Note1Steel support frame for equi
7、pment and pipe rackTons49942Platforms of equipment and stairsTons7483High-tensile bolts and nutsTons774Preservation Tons40845Fire preventionTons910 TotalTons5819Frame, Platform & Bolts钢结构安装工程的主要工作内容包括材料检验、构件预制与安装、构件防腐与防火施工以及焊缝无损检测等。The main works of structural steel installation include materials in
8、spection, member prefabrication, member preservation and fire prevention and NDT of welding etc.本工程实行工厂化作业,钢结构预制将根据合同条件及、建设单位的要求全部在施工生产暂设的结构加工场区进行;安装施工时,根据结构柱基础移交进度情况,统筹安排钢结构预制安装进程,总体原则是:优先进行管廊结构的安装,后进行钢框架的安装,对妨碍大型设备运输、吊装的钢结构可依据现场进度情况适当推迟,以确保乙烯裂解装置总体进度计划实施。管廊结构的安装,拟利用50吨270吨等不同等级的吊车将预制合格的构件逐件吊装完成;设备
9、框架的安装,如设计与安装条件许可,拟在其安装位置就近预制成片或箱形的单元结构,利用大型吊车整体安装。Factorial fabrication shall be taken in this project. All the prefabrication works of steel structure will be carried out at our steels structure fabrication workshop. The installation works of steel structure will be carried out according to the tur
10、ning over condition of foundation. The prefabrication and installation works of steel structure will be given an overall consideration. The general principle is that first install pipe rack, then install steel frames. For structural steel that will get in the way of transport and lifting works of he
11、avy duty equipment the installation works can be postponed according as the construction progress of site. We intend to use the cranes capacities from 50 tons through 270 tons to lift that prefabricated components. If it is permission by designing and installation conditions, for the installation of
12、 steel frames we propose to assemble them into one piece and lifted with a heavy duty crane.每道工序完成后应及时向后续工序如防腐、管道安装、设备安装及防火层施工等办理书面工序交接。After each process step finished, written handing over works shall be taken to the following process step in timely such as preservation, pipe installation, equipme
13、nt installation and fire prevention etc.1.1.2 编制依据 Establishment Reference02CNSHY26SECCO121上海赛科石油化工有限公司乙烯装置安装工程施工标段招标文件及其答疑文件。Package I Tender Files of Installation Works of Ethylene Plant and clarification files of Shanghai SECCO Petrochemical Co. Ltd.GB50205-95 钢结构工程施工及验收规范Code For Construction An
14、d Acceptance Of Steel Structure EngineeringSH3076-96 石油化学工程建筑结构设计规范Code for Design of Building structures in Petrochemical EngineeringJGJ82-91 钢结构高强螺栓连接的设计、施工及验收规范Code for Design, Fabrication and Acceptance of High Strength BoltsJGJ81-91 建筑物钢结构焊接规范Specification for Welding of Structural Steel in Bui
15、ldingsSH3507-1999 石油化工钢结构工程施工验收规范Code of Construction and Acceptance of Steel Structure Engineering for Petrochemical IndustryPH-00-TSC-ST-0002 现场结构设计原则Site Structural PhilosophySD-00-TSC-ST-0001 钢结构材料、制作和安装标准Standard For Steel Structures Material, Fabrication And ErectionSD-00-TSC-ST-0002 钢结构设计标准St
16、andard For Steel Structures DesignSD-00-TSC-CV-0012 钢结构防火标准Steel Structures - Fireproofing Standard SD-00-TSC-MS-0023 保护涂层标准及使用要求Standard For Protective Coatings And Application RequirementsPH-00-TSC-MS-0001 材料选择和防腐原则Material Selection And Corrosion Protection Philosophy1.2主要施工顺序 The Main Constructi
17、on Sequence钢结构安装工程的主要施工顺序见图1.2-1。除锈涂漆施工准备图纸会审方案的编制切割下料C放样号料C结构预制材料检验A定位焊接C校核组装C调直整平C焊接施工C构件尺寸检验B焊缝质量检验B编号包装C喷砂打磨C运输出厂C安装C结构安装基础螺栓处理C基础验收A节点焊接C整体找正C找正、找平C局部除锈、喷砂、打磨B焊接质量检验B涂刷面漆、防火交工验收A联合检查BA-停检点 , B-报告点, C-见证点 图1.2-1 钢结构施工程序图The main construction sequence of steel structure please see following dragr
18、am 1.2.1Derusting& PaintingSchemeEstablishmentConstruction PreparationPrefabricationCutting & Laying off CMaterialInspection ALofting & Material drafting CAlignment& Leveling CHanding Over Inspection & Acceptance AJoint Inspection BPainting Top Coat & Fire PreventionPartly Derusting, Sand blasting&
19、Grinding BWelding Quality Inspection BEntiretyAlignment CConnection Welding CAlignment &Leveling CSteel structure InstallationFoundation Inspection &Acceptance AFoundation &Anchor Bolt Treatment CInstallation CAStop & Inspect Point, BReporting Point, CWitness Point Diagram 1.2-1 Table for Steel Stru
20、cture ConstructionChecking& Assembly CFixing Welding CTransferring to Site CMarking & Packing CSand Blasting CMembers Dimension Inspection BWelding Quality Inspection BWelding CDrawingJoint Trial1.3钢结构预制 Steel Structure Prefabrication钢结构的预制应根据承包合同条件、建设单位的要求和及结构供货状况及下列要求进行。The prefabrication of struc
21、tural steel shall be carried out according to the condition of contract, requirement of employer & status of supply status of raw materials.1.3.1工艺流程 Process Flow施工图设计、审查材料验收型材矫形号 料下 料制 孔坡口加工组装、焊接除锈防腐编号出厂质量检验检查、矫形图1.3-1钢结构制作工艺流程Design & review shop drawingPurchase & Acceptance of raw materialSection
22、al material straighteningMaterial draftingCutting-offMake holeMachining grooveAssembling & weldingRust removal & anti-corrosionNumber & ex-factoryQuality inspectionInspection & straighteningDiagram 1.3.1 Process flow for fabrication of steel structure1.3.2 施工图审核与深化设计图样 Reviewing And Detailing Design
23、 Drawings使用芬兰Tekla Oy公司开发用的、世界知名钢结构三维拆图软件-X Steel(我公司曾使用该软件绘制厦门翔鹭PTA工程约6700T钢结构制造图),绘制、出版与结构设计图样一致,更适于工厂化生产的钢结构构件加工详图(车间大样图)和材料清单,以进一步提高施工效率,保证施工质量,确保工地安装的进度。We prepare shop drawings using the word famous 3D steel structure drawing software X Steel which developed by Finland Tekla Oy Co. (Our compan
24、y has used the software preparing shop drawings for almost 6700 tons steel structure for Xiamen Xianglu PTA project). These shop drawings are concordant with design drawings and suited to factorial fabrication. It can increase work efficiency, assure construction quality, ensure installation process
25、 at site.1.3.3 材料验收 Raw Materials Acceptance(1)材料验收程序 Acceptance Procedure of Materials材料送达仓库后,进入待验收区,由保管员及时对材料的包装、数量和外观进行检查,并填写“到货日记”及“验收通知单”,24小时内由检验员到仓库验收After the material being sent to the warehouse, enter into the area waiting for acceptance, the keeper should check the package, quantity and a
26、ppearance of the materials in time and fill in “delivery journal” and “acceptance notice”, the inspector should accept the material in the warehouse within 24 hours.材料责任工程师和检验员审核质量证件,并在质量证件上编号Material responsible engineer and inspector review the quality certificate and number on the quality certifi
27、cate.按检验分工,检验员负责外观质量验收和几何尺寸检测,保管员负责数量清点,如有不符,再由检验员复核Dividing the work as per inspection, the inspector is responsible for inspection of visual quality acceptance and physical dimension. The keeper is responsible for account the quantity. If there is any unconformity, recheck by the inspector.若厂家提供的质
28、量证件上有漏检项目或对其技术指标有质疑,可按材料标准进行所缺项目或其质疑项目的复验,由检验员制取试样,委托有资质的检验、试验机构检验Recheck missed or oppugned items according to the material specification by a inspector who prepares a test piece and which will be carried out by a qualified testing and inspection agent, if there are missed items on quality certific
29、ates submitted by manufacturers or oppugn its technical indicators.由检验员和材料责任工程师对检验、试验机构出具的检验、试验报告进行审核,如有不合格,按规范规定处理Material responsible engineer and inspector review testing or inspection reports submitted by testing & inspection agent, if it are unqualified, handle it as per specified stipulations.
30、检验合格的材料应在质量证明文件(包括检试验报告)的编号处标明材料标准、合格数量、验收日期等记载内容,并由检验员和材料责任工程师分别签章确认Material standard, qualified quantity and acceptance date etc. of qualified material will be marked on the numbering place of quality certificate documents, and Material responsible engineer and inspector will sign and affix with p
31、ersonal seal to confirm it respectively.由检验员按规定对检验合格材料实物作标识,保管员和检验员分别在入库单上签章,办理入库手续An inspector will make identifications for qualified materials according to specified requirements. A keeper and inspector will sign a warehousing entry and affix with personal seal respectively, and deal with warehou
32、sing procedure对检验不合格的材料,应做好标识且隔离存放,报计划员和材料责任工程师评审,采取退货或降级使用等方法分别处置Making identifications and isolating unqualified materials, report it to a planner and material responsible engineer to review, and then deal with these unqualified materials by return of goods or degrading application etc.经评审可降级使用的材料
33、应有详细记录、处置意见和特殊标识,并应在限定范围内使用Detailed record, handling opinion and special identification should be made for allowable degrading application materials after reviewed, and utilize which in a limited range.(2)材料质量证明文件的管理 Management of quality certificate document of materiala 质量证明文件分类 Classification of
34、quality certificate document供货厂家提供的原始质量证明文件Original quality certificate documents submitted by supplier有考证和追踪价值的原始证明文件的复印件Copies of original quality certificate documents worth of textual research and tracing.b 质量证明文件的要求 Requirement of quality certificate document证明文件必须有发证单位公章,当分供方提供的证明文件为复印件时必须加盖分供
35、方的公章和经办人签章,且字迹清晰An official seal must be on the certificate document; another one and personal seal of transactor should be provided clearly if which is a copy submitted by supplier.证明文件的品名、规格、型号、材质、生产批号、标记数量等要与材料实物或其标记的相应内容相符File name, specification, types, material, batch number of production and
36、marked quantities should meet the physical goods or relevant description of its marks.证明文件所证明材料应符合相应法规的要求Certified materials of certificate document should meet requirements of relevant codes.c 证明文件审核 Review of certificate document由检验员在证明文件上作“检验记载”,“检验记载”的内容包括材料计划员所编证明文件的编号、材料验收时所遵循的材料标准代号、证明材料数量及其它
37、说明事项并签章A inspector prepare a inspection record on the certificate documents, which includes serial number marked by a material planner, followed material standard code when accepting material, quantity of certificate documents and other instructions as well as signed and affixed with personal seal.由
38、材料责任工程师审核证明文件,确认无误后签章A material responsible engineer review certificate documents and sign with personal seal after confirmation.d 证明文件的管理 Management of certificate document原始质量证明文件应统一由物资供应部负责,按材料类别归档保管,工程竣工后,统一交技术管理部纳入交工技术文件Material supplying department is responsible for the management of original
39、 quality certificate document, achieving which according to material classifications and hand over it to technical management department as hand-over documents after accepting of the work.发料时应随时向领料单位提供查询质量证件的方便,必要时应按领料单位的要求提供材料质量证明文件的副本或复印件Provide the inquiring convenience of quality certificate to
40、material drawing department while issuing materials, if necessary, provide duplicate or copies.(3)材料的标识管理 Identification management of material材料经验收合格后,检验员才能用标签、标牌、钢印等方式作标识。A inspector can mark qualified materials with a label, index tag and steel seal etc. after it has been accepted.当对材料进行分离使其标识只能位
41、于其中一部分上时,应进行标识的移植。When separating material, the identification on it will also be placed on each separated parts.(4)仓储管理 Storage management焊接材料存放在可控温度和湿度的库房内,防腐材料的储存在一般的封闭库房内,钢材存放在露天料场。露天料场应有环形道路,并做好排水沟。存放材料应垫高300mm以上,阴雨天气或长期存放时还应用蓬布等盖严。Welding materials should be stored in a depot of controllable t
42、emperature and humidity, while storing anticorrosion material in a sealed warehouse and steel material can be set in a opened laying out that is equipped with annular road and drain ditch. Stored materials should be underlaid over 300mm and covered with canvas in a rainy day or storing for a long te
43、rm. 材料入库验收合格后,保管员应凭“入库单”及时建立“保管员台帐”。Storekeeper should prepare a account book of keeper according to warehousing entry after materials are qualified for warehousing acceptance.材料的收、支、存采用计算机进行库存动态管理。Dynamic management for receiving, issuing and storing material will be carried out with a computer.材料的
44、每个存放货位均应挂设标签,标签应注明材料的品名、规格型号、材质、遵循标准号或图号、数量、证件编号等内容,并建立台帐。Each cargo bay of materials will have a label indicating material name, specification and type, material and followed standard number or drawing number, quantity, serial number of certificates etc. A account book should be established.(5)材料检验
45、内容 Inspecting items of material钢材应具有质量证明书,并符合设计和专业标准的要求。钢材表面或断面不得有裂纹、结疤、折叠、气泡、夹层和分层,表面缺陷深度不应大于钢板厚度负偏差的1/2。Steel material should have quality certificates and tally with requirements of design and specialty standards. Cracks, scab, fold, bubble, interlayer and delaminating can not be found on the sur
46、face of steel material or cross section, and the depth of surface defection can not be more than 1/2 of negative error of thickness of steel plate.焊接材料应具有质量证明书,并符合设计和国家标准的规定。受潮变质、药皮破损、焊芯生锈的焊条严禁使用。Welding materials should have quality certificates and tally with specified stipulations of design and national code. Electrodes with deteriorated by wetting, damaged coating and rusted core wire are forbidden to use.涂装材料,应有出厂质量证明书和检验报告,并符合设计要求和国家现行标准。高强螺栓、螺母、垫片应有质量证明书,按规格分别存放,并防止锈蚀和损伤。Painted materials should have