资源描述
单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,PPT,文档演模板,Office,PPT,20 十一月 2026,精益生产工具,Batch,Single Piece Flow,From:,The Toyota Production System,Building Quality into the Process,Single Piece Flow,The next process is the customer never send defects!,Sample Inspect catches Defect too Late,When you Finally Find a Defect,How many more do you have?,Where are they in the process?,What is the root Cause?,Single Piece Flow catches Defects immediately,When you find a Defect,You only have one,You know where it occurred,You Can find/Resolve the Root Cause immediately,Check,Do,Verify,Check,-The previous operators work.,Do,-Your work.,Verify,-That you did your work correctly.,Process,Inspect,Transport,Transportation is integrated into the production process,via automation e.g.,moving line,Process,Inspect,Process,Inspect,Transport,Process,Inspect,Transportation is integrated into the production process,via human conveyance e.g.,Chaku-Chaku,Building Quality into the Process,2 ways to perform SPF,The next process is the customer never send defects!,Check,Do,Verify,Gets you into Parts Per Million quality-,When you verify your work,you catch 1 flaw in 100 parts.The next person checks your work and can catch 1/100 so thats 1/10,000.Then that person Verifies their work and can catch 1/100.Thats 1/1,000,000 errors that can get through.,Check,Do,Verify,Every Customer in a Process has:,-a right to expect perfect material,-an obligation to inspect the material before use.,-an obligation to inform the previous step in the process of any problem.,-an obligation to stop the process until any problem has been resolved.,Single piece or one piece flow is a means to primarily build,Quality into the process.This is achieved by establishing a takt,Time,developing std work,and swip.The premise is that an,Operator can only work on one piece at a time,and performs a,Quick quality check on the CTQs of the process before moving,The part to the following process.If a defect is detected,Jidoka,Is enactedthe line is stopped,and immediate action is taken,To remediate the situation and take countermeasures to prevent,reoccurence,Takt time,Std work,Flow:,work(process)that is done in conjunction with or,simultaneous to transportation,One Piece Flow,The production is organized into a synchronous chain where each person has a,balanced,amount of work relative to his/her supplier and customer in the chain.,As one person finishes their element,so do all.Work is then moved down the line synchronously.,Every person is empowered to stop the production process if a reject is spotted.,Organization,Area,Supervisor,New/Rev,Page,of,Date,Production Line,Part Number,Part Name,Operator,Standard Work Sheet,To:,Turns,DPUs,Scope of Operations,From:,Quality,Check,Safety,Precaution,Standard,Work-in-Process,#Lots of,Standard,Work-in-Process,Takt/Rate,Time,Total Manual&Travel Time,Man/Travel Time,Operator,End Finish,Weld,End Finish,Weld,Orbital,Weld,Hydro Test,Mark,Mech.,Clean,Torch,Braze,Tubing,CFM Cell,Fern Bissonnette,Cell 6,All Parts,All Tubes,1 1,Mech.,Clean,Raw material,Weld,100/Day,FPI,X-Ray,EDM,2nd Qtr.01,End,Finish,Outside Cell,27-avg lot=6,Flex,Finished Goods,ACTION WORKOUT,g,GEMS Global Production System,The next process is the customer never send defects!,Check,Do,Verify,One Piece Flow,Your customer is the next step in the process.Give to your customer,exactly what they need(1 item),exactly when they need it,done perfect every time.,Tenants of 1 pcs Flow,Do Not Make Defects,Do Not Pass Along Defects,Do Not Accept Defect,Quality,Quality,QualityDefects are the Worst Kind of Waste,System of manufacturing in which the final process,withdraws the parts it needs from the preceding,process at exact timing intervals,in the exact,standardized amount needed.,Pull Production Methodology&Sequence,Definition,Ref,Material Presentation,training for explanation on Supermarket definition and use,Parts,1,3,4,5,6,7,8,9,10,2,Assembly Line,Cell or Chaku-Chaku line,Supplier,Material,Information,Supermarket,Empty container,Full container,Legend,1,Sequence/Timing,Pull Production Methodology&Sequence,JIT,Jidoka,e,GPS,for,GPC,Heijunka,Level Loading,Sequencing,Finding a balance between the volume of work that your organization needs to do and your capacity,Adjusting a production schedule to meet unexpected changes in customer demand,Ordering the production in such a fashion to achieve the desired TAKT for all items,taken from memory Jogger,Leveled production meanslowering the peaks amongthe daily production volumesas much as possible and making the production flow smooth and unflucuating.In general,the more fluctuations you in the production flow,the more muda you end up having.That is because the capacity and capability of a line tends to be set at a level that meets the peak production demand rather than the average demand.If the production line produces only a single product,you may be able to reduce muda simply by adjusting the production schedule and staffing level.But if you want to produce consistently at an average level where you have many different kinds of products to produce in a single line,you have to do the averaging not just in volume but in kinds as well,.This way of averaging both volume and in kinds is called production,leveling,or,heijunka,in Japanese.,Leveled Production,Amount of products that can be sold,HEIJUNKA,Average by total volume,Average by model,Leveled Load Production,Build to forecast,Build to FG inv,Build after order is received,ALL components need to,be stocked in RM,An order from these,products,takes precedence over 1-2-3,products build this first!,Use Stocks,Build Stocks,TAKT,%,F1,F1,F1,F1,F1,F1,F2,F2,F2,F2,F2,F2,TAKT Time,Determined by PSI,2Q,3Q,4Q,Ok to Build to FG,Repeatable Products,Non-Repeatable Products,Need to Determine.,How Much,20 bulbs per day,What Kind,15/60 Watts,5/100 Watts,When,5-60W,2 100W,5 60W,2 200W,5 60W,1 100W,TAKT,Level Load Mix,Level Load Sequence,If we were making light bulbs.,Quarterly,Weekly,Weekly,Frequency,60,60,60,60,60,100,100,60,60,60,60,60,100,100,60,60,60,60,60,100,Takt Time,=,Operating time per day,Production requirement per day,Assumptions:,Machine Breakdown=0 hour,Setup Change=0 hour,Defect Rate=0%,Takt Time Equation,For more information on TAKT Refer to JIT Section,Quick Example,Setting the production sequence of multiple TRAM RAC Types(Med Systems Product),Product,MonthlyRequirement,DailyRequirement,TAKT Time,Model 1,720 units,24 units,5 min,Model 2,360 units,12 units,10 min,Model 3,360 units,12 units,10 min,Total,1440 units,48 units,7.5 min,This is data for 3 products,Model 1,Model 2,and Model 3,are produced at GEMS.The chart displays the monthly production level,the daily production level(monthly divided by 30),and the Takt time for each product type.,THEY ARE ALL PRODUCED ON THE SAME LINE.,How can these units be built in a level production mode using this example?,Model 1,Model 2,Model 3,Detailed Example,Since these three products are on the same line,you will need to follow the sequence pattern of 1-2-1-3 in your production mix.By doing it this way you are able to level-load your production both in terms of quantity and types.,#1 Prod 1,#4 Prod 3,#2 Prod 2,#3 Prod 1,REPEAT,Mixed Assembly Line,Production Sequence by Type,If produced in batches,only the Model 1s will meet Takt times,If produced to a sequence,2 units will be produced in 2 Takt times,Lets show how we validate this,Model,Line,Takt,Takt/Cycle,Graph,Part-Quantity,Part Router,1,3,2,7.5,7.5,7.5,See Std Work Combo Sheet for example.One sheet is created for each operator,S,CT,=25,S,CT,=40,S,CT,=30,7,6,6,6,7,6,13,8,12,7.5,9,7.5,Takt Build Time,=#of Operations*Takt,Actual Build Time,=S,CT,1,30,2,30,3,30,1,25,2,40,3,30,Model,TBT,Model,ABT,1,-5,2,+10,3,0,Model,Objectives:,Produce to Takt Time,(understanding no 2 products will have the exact same ABT),The sum of the,D,Tot,is zero,Every product is produce at least once,No product is produced twice in a row,Create a product sequence where:,D,tot,=,S,(#of Units in sequence*,D,),D,tot,=-5(#of 1s)+10(#of 2s)+0(#of 3s),0=-5(2)+10(1)+0(1),In each sequence will contain one Model 1,two Model 2s,and 1 Model 3),According to the rules the sequence must run:,Model 1 Model 2 Model 1 Model 3,
展开阅读全文