资源描述
Click to edit Master title style,Click to edit Master text styles,Second level,Third level,Fourth level,Fifth level,*,*,单击此处编辑母版标题样式,单击此处编辑母版文本样式,第二级,第三级,第四级,第五级,*,*,*,设备验证,2008年11月,2026/10/1,1,Validation,验证,“Establishing documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality attributes”.,建立一个文件化的证据,以提供一个高水准的保证体系,确保生产出的产品始终符合预定的标准和质量要求。,FDA Guidelines on General Principles of Process Validation,May 1987.,Documents,文件,2026/10/1,2,Operational,运行确认,Qualification,Installation,安装确认,Qualification,Design Qualification,设计确认,Sequence of documents,文件建立次序,Specification,Qualification,标准确认,-URS,用户需求,-,Specifications,System,设计基础文件,设计,&,安装,-,Mechanical,机械,Air unit,空调,Electrical,电,设计,&,安装,Hardware,硬件,Software,软件,IQ,安装确认,-,ACS,Hardware,硬件,Software,软件,IQ,安装确认,-,Mechanical,机械,Air unit,空调,Electrical,电,OQ,运行确认,-,ACS,Hardware,硬件,Software,软件,OQ,运行确认,-,Mechanical,机械,Air unit,空调,Electrical,电,Performance,Qualification,性能确认,-,System,System Owner,系统使用者,Engineering C.,工程部,ACS C,计算机工程师,.,Mech.C.,机械工程师,ACS C./System Owner,计算机工程师,/,系统使用者,Mechanical C./System Owner,机械工程师,/,系统使用者,System Owner,系统使用者,2026/10/1,3,V Model Life Cycle,2026/10/1,4,URS-system level,用户需求,Specifications,标准,URS,用户需求,project level,项目层面,参数一览表,System list,系统清单,Block diagram,设计结构图纸,概括的系统描述,PFD,流程图,Criticality analysis,重要项分析,Master Validation Plan,验证主计划,Traceability matrix,矩阵图,Good for design,用于设计,2026/10/1,5,Design-Basic documents,基础设计文件,Detailed system description,详细系统描述,PID,General system description,概括的系统描述,PFD,流程图,Room data sheets Parameters,参数一览表,Traceability matrix,矩阵图,Instrument list,仪表清单,Equipment list,设备清单,Parameter list,参数清单,Alarm list,报警项目清单,Good for construction,用于制造,Traceability matrix,矩阵图,2026/10/1,6,Design&Installation-ACS/Software,设计及安装软件,Detailed system description,详细系统描述,Parameter list,参数清单,Alarm list,报警项目清单,PID,Instrument list,仪表清单,Equipment list,设备清单,Traceability matrix,矩阵图,Software design concept,软件概念设计,Test plan,测试计划,Test documents FAT,设备生产厂测试文件,Program review report,回顾报告,Application software,应用软件,Ready for FAT,Traceability matrix,矩阵图,2026/10/1,7,Ready for FAT,进入设备生产厂测试阶段,Design&Installation-ACS/Hardware,设计及安装硬件,Detailed system description,详细的系统描述,Parameter list,参数清单,Alarm list,报警清单,PID,Instrument list,仪表清单,Equipment list,设备清单,Traceability matrix,矩阵图,Hardware design concept,硬件概念设计,I/O list,I/O,清单,Address list,地址清单,Data sheets Instruments,仪表一览表,PLC configuration PLC,配置,Electrical drawings,电气图,Control panels,控制面板,Instruments,仪表,Traceability matrix,矩阵图,2026/10/1,8,Design&Installation Mechanical,设计,&,安装机械部分,Detailed system description,详细的系统描述,Parameter list,参数清单,Alarm list,报警清单,PID,Instrument list,仪表清单,Equipment list,设备清单,Traceability matrix,矩阵图,Power distribution,电路分配,Air ducting,空调管路,Piping,管道,Air ducting layout,空调管路图,Electrical layout,电气图,Equipment layout,设备图,Piping layout,管道图,Data sheets Equipment,设备一览表,Equipment,设备,Ready for SAT,进入,SAT,Ready for FAT,进入,FAT,2026/10/1,9,SAT procedures程序,Qualification,PLC configuration PLC配置,Equipment layout设备图,Detailed system description,Project and Owne,Traceability matrix矩阵图,Specifications,Specification,Software SAT report,Tightness test protocols,and DSD controls,Mechanical机械,设计文件对应于URS,Air ducting空调管路,Testing-FAT software,测试,FAT,软件部分,Traceability matrix,矩阵图,Application software,应用软件,FAT,测试文件,FAT procedures,程序,FAT protocols,方案,Factory,Acceptance,Test,设备生产厂测试,Software FAT report,软件部分测试报告,Software,软件,2026/10/1,10,Testing-FAT hardware,测试,FAT,硬件部分,Traceability matrix,矩阵图,Electrical panels,仪表板,Test documents FAT,测试文件,FAT procedures,程序,FAT protocols,方案,Factory,Acceptance,Test,设备生产厂测试,hardware FAT report,硬件的,FAT,报告,Hardware,硬件,Instruments,仪表,Calibration certificates,校验证书,2026/10/1,11,Testing-FAT Equipment,测试,FAT,设备部分,Traceability matrix,矩阵图,Equipment,设备,Test documents FAT,测试文件,FAT procedures,程序,FAT protocols,方案,Factory,Acceptance,Test,设备生产厂测试,Equipment FAT report,设备的,FAT,报告,Equipment,设备,Certificates,合格证书,2026/10/1,12,Field installation verification,现场安装确认,Traceability matrix,矩阵图,System installation,系统安装,Design documents,设计文件,IO test protocol,IO,测试方案,Tightness test protocols,严密的测试方案,Field installation verification,Report,现场安装确认报告,System,系统,Field,Installation,Verification,现场安装确认,2026/10/1,13,Specifications,SAT protocols方案,Ready for FAT进入FAT,Ready for Performance testing,Design Qualification设计确认,Equipment list设备清单,Equipment list,PLC configuration PLC配置,Traceability matrix矩阵图,Application software应用软件,Compares GXP,Parameter list,Approval 1,批准,Software FAT report,软件的,FAT,报告,Hardware FAT report,硬件的,FAT,报告,Equipment FAT report,设备,FAT,报告,Field installation verification report,现场安装报告,Approved,批准,Ready for SAT,进入,SAT,2026/10/1,14,Testing-SAT software,测试,SAT,软件,Traceability matrix,矩阵图,Application software,应用软件,Test documents SAT,SAT,测试文件,SAT procedures,程序,SAT protocols,方案,Site,Acceptance,Test,工厂测试,Software SAT report,软件,SAT,报告,Software,软件,2026/10/1,15,Testing-SAT equipment,测试,SAT,设备部分,Traceability matrix,矩阵图,Equipment,设备,Test documents SAT,SAT,测试文件,SAT procedures,程序,SAT protocols,方案,Site,Acceptance,Test,工厂测试,Equipment SAT report,设备,SAT,报告,Equipment,设备,Certificates,合格证书,2026/10/1,16,Approval 2,Software SAT report,软件,SAT,报告,Equipment SAT report,设备,SAT,报告,Ready for Performance testing,进入性能测试,Approved,批准,2026/10/1,17,Systems,1 System=1 PID,Example,如,:1 air handling unit,一个空调单元,1 clean steam generator,一个清洁蒸汽发生器,3 holding tanks,三个储罐,A system is a composition of components that logically cohere in order to fulfil a particular functionality,一个系统是由多个单元组成的复合体,各单元组合在一起而完成特定的功能,2026/10/1,18,Traceability,追溯性,Project documents must be traceable to requirements,项目文件必须有追溯性,Design documents must be traceable to URS,设计文件对应于,URS,Testing must be traceable to design specification and,URS,测试对应于设计标准和,URS,URS,project level,URS,项目层面,URS,system level,URS,系统层面,Design,Documents,设计文件,Tests,测试,Use of a traceability matrix is the recommended method,推荐用 追溯性的矩阵图,2026/10/1,19,Criticality,关键,Criticality Analysis is essential to good project,重要性分析是一个好项目成功的关键,intended to focus effort on most critical areas for GXP,最重要的是,GXP,的符合性,GLP,GCP,GMP,URS,Criticality Analysis,重要性分析,URS update,更新用户需求,SOP,程序,Detailed system description,详细的系统描述,Compares GXP,with URS paragraphs,逐段比对,URS,与,GXP,符合性,Defines actions for,Project and Owne,项目组和用户确定必要的行动,r,Highlights SOP,and DSD controls,简述,SOP,与系统描述中重点,2026/10/1,20,演讲完毕,谢谢观看!,
展开阅读全文