资源描述
目 录
第一部分、(五、施工组织设计)·································································1
编制说明··············································································3
第一节、编制原则·······································································3
第二节、招标范围·······································································3
第三节、编制依据········································································4
第一章、施工方案及技术措施································································5
第一节施工准备方案·····································································5
第二节、园建施工技术措施································································9
第三节、绿化工程施工方法·······························································24
第四节、给排水工程施工技术措施························································35
第五节、安装部分施工技术措施··························································42
第六节、背景音乐系统施工技术措施······················································47
第七节、喷灌系统施工技术措施··························································48
第二章、质量保证措施和创优计划····························································51
第一节、质量目标及质量保证体系························································51
第二节、质量保证措施··································································52
第三节、建立质量保证体系的指导原则····················································53
第四节、工程质量保证体系······························································53
第五节、质量责任承诺··································································56
第三章、施工总进度计划及保证措施··························································57
第一节、施工进度计划··································································57
第二节、各阶段进度的保证措施···························································57
第四章、施工安全措施计划···································································67
第一节、安全施工管理措施······························································67
第二节、安全防火措施···································································70
第三节、防灾措施和安排·······························································72
第五章、文明施工措施计划··································································73
第一节、管理目标、体系································································73
第二节、建立健全管理制度······························································73
第三节、文明施工保证措施······························································74
第四节、实行安全生产(文明施工)目标管理··············································75
第五节、管理措施······································································75
第六章、施工场地治安保卫管理计划;··························································77
第一节、治安联防方案··································································77
第二节、重大节假日安全保卫方案 ······················································77
第三节、治安保卫制度··································································77
第七章、施工环保措施计划·································································78
第一节、 施工协调与环境保护···························································80
第二节、环境保护的重要性······························································81
第八章、冬季和雨季施工方案································································86
第一节、冬季施工方案··································································86
第二节、雨季施工方案··································································86
第三节、雨季施工中的技术措施··························································86
第四节、苗木冬雨季养护方案····························································87
第九章、项目组织管理机构···································································91
第一节、施工部署······································································91
第二节、项目职能部门岗位职责···························································91
第三节、项目经理部主要成员职责························································92
第十章、承包人自行施工范围内拟分包的非主体和非关键性工作··································99
第一节、劳动力投入计划································································99
第二节、劳动力投入保证措施····························································99
第三节、劳动力配备原则································································100
第四节、劳动力保证措施·······························································101
第五节、材料投入计划及其保证措施·····················································102
第十一章、成品保护和工程保修工作的管理措施和承诺········································103
第一节、成品保护组织机构·····························································103
第二节、制作成品保护措施和承诺·······················································103
第十二章、任何可能的紧急情况的处理措施、预案以及抵抗风险(包括工程施工过程中可能遇到的各种风险)的措施;············································································· 106
第一节、紧急情况处理预案·····························································106
第二节、火灾爆炸应急预案·····························································107
第三节、防非应急预案·································································108
第四节、防汛应急预案·································································108
第五节、抵抗风险的措施·······························································109
第六节、施工人员安全风险的防范·······················································110
第七节、工期延误风险防范·····························································111
第十三章、对总包管理的认识以及对专业分包工程的配合、协调、管理、服务方案····················112
第一节、施工总承包管理的原则·························································112
第二节、对施工总承包管理的理解·······················································112
第三节、施工总承包单位对专业分包工程的配合、协调、管理、服务方案·····················112
第四节、进度管理的要求·······························································113
第五节、遵守各种安全生产规程和规定···················································113
第六节、对分包单位的配合、服务·······················································114
第七节、主要协作内容·································································114
第十四章、与发包人、监理及设计人的配合··················································115
第一节、协调方式····································································115
第二节、与设计单位间的工作协调······················································115
第三节、与建设单位的工作协调························································115
第四节、与监理工程师工作的协调·······················································115
第五节、项目部内部各专业班组的工作协调···············································116
第十五章、招标文件规定的其他内容························································117
第一节、从技术上保证进度·····························································117
第二节、推广采用新技术、新材料、新工艺,组织好施工生产································117
第三节、技术质量交底制······························································117
第四节、质量检查制度·································································118
第五节、隐蔽工程验收制度·····························································118
第六节、技术复核制···································································119
第七节、施工技术资料、工程档案管理措施················································119
施工组织设计附表········································································121
附表一 拟投入本工程主要施工设备表··················································122
附表二 拟配备本工程试验和检测仪器设备表············································123
附表三 劳动力计划表································································124
附表四 计划开、竣工日期和施工进度网络图············································127
附表五 施工总平面图································································128
附表六 临时用地表··································································132
附表七:苗木来源明细表·······························································133
第二部分、(六、项目管理机构)·······························································151
1、项目管理机构组成表································································151
2、项目经理简历表····································································152
3、项目副经理简历表··································································180
4、技术负责人简历表··································································185
5、合同商务负责人简历表······························································199
6、绿化负责人简历表··································································204
7、给排水负责人简历表································································225
8、景观负责人简历表··································································230
9、电气负责人简历表··································································236
10、其他主要项目管理人员简历表·······················································241
10.1质检员··········································································241
10.2施工员··········································································246
10.3专职安全管理员··································································252
10.4材料员··········································································257
10.5造价员··········································································262
10.6机械员··········································································267
10.7劳动力管理员····································································272
10.8资料员···········································································277
10.9高级绿化工······································································282
10.10绿化工·········································································287
10.11高级花卉工·····································································293
第三部分(七、拟分包项目情况表)···························································298
第四部分(八、资格审查资料)·······························································299
1、投标人基本情况表及资格审查扫描件··················································299
2、近年财务状况表及财务审计报表扫描件···············································311
3、近年完成的类似项目情况表及业绩扫描件·············································403
近年完成的类似项目情况表1··························································403
近年完成的类似项目情况表2··························································422
近年完成的类似项目情况表3··························································432
近年完成的类似项目情况表4··························································438
近年完成的类似项目情况表5··························································448
近年完成的类似项目情况表6··························································470
4、正在施工和新承接的项目情况表及业绩扫描件·········································477
正在施工和新承接的项目情况表1·······················································477
正在施工和新承接的项目情况表2·······················································483
5、企业资质证书复印件································································498
第五部分(十、偏离表)····································································502
第一部分(五、施工组织设计)
1.投标人应根据招标文件和对现场的勘察情况,采用文字并结合图表形式,参考以下要点编制本工程的施工组织设计:
(1)施工方案及技术措施;
(2)质量保证措施和创优计划;
(3)施工总进度计划及保证措施(包括以横道图或标明关键线路的网络进度计划、保障进度计划需要的主要施工机械设备、劳动力需求计划及保证措施、材料设备进场计划及其他保证措施等);
(4)施工安全措施计划;
(5)文明施工措施计划;
(6)施工场地治安保卫管理计划;
(7)施工环保措施计划;
(8)冬季和雨季施工方案;
(9)项目组织管理机构(若施工组织设计采用“暗标”方式评审,则在任何情况下, “项目管理机构”不得涉及人员姓名、简历、公司名称等暴露投标人身份的内容);
(10)承包人自行施工范围内拟分包的非主体和非关键性工作(按第一章“投标人须知”第1.11款的规定)、材料计划和劳动力计划;
(11)成品保护和工程保修工作的管理措施和承诺;
(12)任何可能的紧急情况的处理措施、预案以及抵抗风险(包括工程施工过程中可能遇到的各种风险)的措施;
(13)对总包管理的认识以及对专业分包工程的配合、协调、管理、服务方案;
(14)与发包人、监理及设计人的配合;
(15)招标文件规定的其他内容。
2.施工组织设计应按要求编制及装订
3.施工组织设计除采用文字表述外可附下列图表,图表及格式要求附后。若采用技术暗标评审,则下述表格应按照章节内容,严格按给定的格式附在相应的章节中。
附表一 拟投入本工程主要施工设备表
附表二 拟配备本工程试验和检测仪器设备表
附表三 劳动力计划表
附表四 计划开、竣工日期和施工进度网络图
附表五 施工总平面图
附表六 临时用地表
附表七:苗木来源明细表
编制说明
我公司对此次投标施工组织设计的编制高度重视,召集了参加过类似工程施工、有丰富管理及施工经验的人员,在仔细研究图纸,明确工程特点、充分了解施工环境、准确把握业主要求的前提下,成立了编制专题小组,集思广益、博采众长,力求本方案切合工程实际,思路先进,可操作性强。
本施工组织设计严格按照工程招标文件和招标范围对施工组织设计的要求进行编制。在人员、机械、材料调配、质量要求、进度安排、施工平面布置等方面统一部署的原则下,进行技术组织指导。
根据本工程设计特点、功能要求,本着对业主资金合理利用,对工程终身负责,以“科学、经济、优质、高效”为编制的总指导方针。
第一节、编制原则
严格遵守招标文件所规定的工程施工工期、招标合同条款以及招标文件的各项要求,根据工程的特点,在工期安排上尽可能提前完成。
坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。
合理安排工程项目的施工程序,做到布局合理,突出重点,全面展开,采取平行与流水作业相结合的方式;正确选用施工方法,科学组织,均衡生产。各项目工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序进行。
调和配合,根据施工具体情况,适当调整施工中各个工序的施工安排并采取相应措施。结合现场实际情况,因时因地制宜,尽量利用原有设施或就近已有的设施,减少各种临时工程。坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原则,精心进行施工场地规划布置,节约施工临时占地。严格组织、精心管理,文明施工,创标准化施工现场。
坚决贯彻“百年大计、质量第一”的质量方针,建立健全质量保证体系。
建立健全安全保证体系,制定安全保证措施和防护措施,坚持标准化作业,确保安全生产。实现“消灭重伤以上人身伤亡事故,消灭一切机械设备重大损失事故,消灭交通责任运输重大事故,消灭等级火灾事故,创建安全生产文明施工的标准化工地。”
第二节、招标范围
工程规模及概况:(一)园建部分包括:入口水景、围墙、特色景墙、景墙、入口大门、通风井、人防出入口、车库架构、室外家具、屋顶花园、大堂入口水系、水幕墙、迎宾水景、挡土墙、残疾人坡道、小区围墙、雨水井、安装土建部分等及其他零星工程的施工;
(二)、绿化部分包括:绿化地整理、常绿(落叶)乔木的种植及养护、灌木的种植及养护、地被的种植及养护;
(三)、安装部分:主要包括非展示区图纸范围内的景观照明系统、给排水系统、背景音乐系统、喷灌系统及其相关工程量。
招标范围:
1、园建部分包括:入口水景、围墙、特色景墙、景墙、入口大门、通风井、人防出入口、车库架构、室外家具、屋顶花园、大堂入口水系、水幕墙、迎宾水景、挡土墙、残疾人坡道、小区围墙、雨水井、安装土建部分等及其他零星工程的施工;
2、绿化部分包括:绿化地整理、常绿(落叶)乔木的种植及养护、灌木的种植及养护、地被的种植及养护;乔灌木及草坪养护周期按24个月不间断管理考虑,以上苗木种植之前需要进行施肥(含土壤改良费用,含在合同总价中),设计土球大小仅供参考,根据实际情况据实调整;
3、安装部分:主要包括非展示区图纸范围内的景观照明系统、给排水系统、背景音乐系统、喷灌系统及其相关工程量。
1、照明系统:包括景观配电箱进线,配电箱及其至景观图纸范围内各个灯具的设备、管线、灯具及其附件的安装;
2、给排水系统:给水系统包含自雨水收集池绿化给水主管起,至各个用水点的管路及其相关设备、阀门、水表阀组等安装。排水系统包括园林雨水口至雨水收集池的管路及其附件安装;
3、背景音乐系统:自背景音乐主机起至图纸范围内各个音箱的设备、管线及其附件安装;
4、喷灌系统:包括喷灌水泵至各个喷头的设备、管路、阀门、喷头及其附件安装,喷灌控制器至各个电磁阀控制回路的设备、管线及其附件安装、调试;
计划进度:计划进度:
合同施工工期:40天(日历天)
计划开工日期:x年11月5 日
计划竣工日期:x年12月15日
第三节、编制依据
(1)xx度假村景观园林工程项目施工图纸
(2)现场踏勘、答疑及其他补充资料
(3)国家现行市政园林工程的有关施工及验收规范、规程、标 准等,主要包括:
《大树移植技术规程》(DB29-91-2004)
《城市绿化施工及验收规范》(GB50209-2002)
《城市绿化和园林绿地用植物材料一木本苗》(GBJ/T82-99)
《建筑工程施工质量验收统一标准》(GB50300-2001)
《给水排水构筑物施工及验收规范》(GBJ141-90)
《市政排水管渠工程质量检验评定标准》(CJJ3-90)
《城市道路照明工程施工及验收规程》(CJJ89-2001)
《电气装置安装工程电缆线路施工及验收规范》(GB50168-92)
《电气装置安装工程电气照明装置施工及验收规范》(GB50259-96)如本规范要求中的规范要求与国家及地方标准冲突,或本规范中罗列的标准要求有冲突时应按较高标准执行。
第一章、施工方案及技术措施
第一节施工准备方案
1、施工准备
工程项目施工准备工作按其性质及内容通常包括技术准备、物资准备、劳动组织准备、施工现场准备和施工场外准备。 l
2、技术准备
技术准备是施工准备的核心。由于任何技术的差错或隐患都可能引起人身安全和质量事故,造成生命、财产和经济的巨大损失。因此必须认真地做好技术准备工作。
2.1熟悉、审查施工图纸和有关的设计资料
熟悉、审查设计图纸的目的,是为了能够按照设计图纸的要求顺利地进行施工,生产出符合设计要求的最终园林产品(建筑物、构筑物或绿化),创造出符合设计要求的景观景象。能够在拟建工程开工之前,使从事施工技术和经营管理的工程技术人员充分地了解和掌握设计图纸的设计意图、结构与构造特点和技术要求,以及成景的关键部位与景观构成要素。
2.2熟悉、审查设计图纸的内容
审查设计图纸是否完整、齐全,以及设计图纸和资料是否符合国家有关工程建设的设计,施工方面的方针和政策。
审查设计图纸与说明书在内容上是否一致,以及设计图纸与其各组成部分之间有无矛盾和错误。审查设备安装图纸与其相配合的土建施工图纸的坐标、标高是否一致。审查设计图纸中的工程复杂、施工难度大小和管理水平能否满足工期和质量要求并采取可行的技术措施加以保证。
2.3熟悉、审查设计图纸的程序
熟悉、审查设计图纸的程序通常分为自审阶段、会审阶段和现场签证等三个阶段。
2.3.1设计图纸自审阶段施工单位收到拟建工程的设计图纸和有关技术文件后。应尽快地组织有关的工程技术人员熟悉和自审图纸,写出自审图纸的记录。自审图纸的记录应包括对设计图纸的疑问和对设计图纸的有关建议。
2.3.2设计图纸的会审阶段
一般由建设单位主持,由设计单位和施工单位参加,三方进行设计图纸的会审。图纸会审时,首先由设计单位和工程主要设计人向与会者说明拟建工程的设计依据、意图和功能要求,并对特殊结构、新材料、新工艺和新技术提出设计要求;然后施工单位根据自审记录以及对设计意图的了解,提出对设计图纸的疑问和建议;最后在统一认识的基础上,对所探讨的问题逐一地做好记录,形成“图纸会审纪要”,由建设单位正式行文,参加单位共同会签、盖章,作为与设计文件同时使用的技术文件和指导施工的依据,以及建设单位与施工单位进行工程结算的依据。
2.3.3设计图纸的现场签证阶段
在拟建工程施工的过程中,如果发现施工的条件与设计图纸的条件不符,或者发现图纸中仍然有错误,或者因为材料的规格、质量不能满足设计,或者因为施工单位提出了合理化建议,需要对设计图纸进行及时修订时,应遵循技术核定和设计变更的签证制度,进行图纸的施工现场签证。如果设计变更的内容对拟建工程的规模、投资影响较大时,要报请项目的原批准单位批准。在施工现场的图纸修改、技术核定和设计变更资料,都要有正式的文字记录,归入拟建工程施工档案,作为指导施工、竣工验收和工程结算的依据。
2.4编制施工组织设计
施工组织设计是施工准备工作的重要组成部分,也是指导施工现场全部生产活动的技术经济文件。园林施工生产活动的全过程是非常复杂的物质财富再创造的过程,为了正确处理人与物、主体与辅助、工艺与设备、专业和协作、供应与消耗、生产与储存、使用与维修以及它们在空间布置、时间排列之间的关系,必须根据拟建工程规模、结构特点和建设单位的要求,在原始资料调查分析的基础上,编制出一份能切实指导该工程全部施工活动的科学方案(施工组织设计)。 l
3、物资准备
材料(包括植物材料)、制品、机具和设备是保证施工顺利进行的物资基础。这些物资的准备工作必须在工程开工之前完成。根据各种物资的需要量计划,分别落实货源,安排运输和储备,使其满足连续施工的要求。
3.1
展开阅读全文